Analysis of Factors Causing Project Delay using Importance Index Method
The government is build a new international airport in Majalengka, West Java. The concept of the West Java International Airport is the feel of a peacock on the roof of the terminal that makes the characteristics of grandeur, uniqueness, and good looking. During the construction of this project, there were various obstacles causing delays in the work. The purpose of this study is to determine the factors causing project delays and provide suggestions for managing the most influencing factors so that the causes of delays can be minimized so that the project can run according to a predetermined schedule. In this study the authors used quantitative research methods by distributing questionnaires to PT.BA employees as contractors who had been selected as competent respondents. This study uses 3 stages of questionnaire using validity and reliability tests using SPSS software version 25 and data analysis of importance index (IMPI). The results of this study are the West Java International Airport Terminal Roof Project has the 5 factors that most influence the work delays. including constraints on the procurement of imported materials (68.23%), delays in the delivery of material (67.24%), limited work access, due to other work related / lack of access (66.96%), improper construction methods causing errors during construction (64.92%) , and the application of new / specialized technologies that are not yet well known (62.30%)
Analisis Pengendalian Pengadaan Material Bangunan dengan Metode MRP (Material Requirement Planning) pada Proyek Gedung
Pada penelitian sebelumnya yang berjudul Analisis Risiko Penyebab Keterlambatan Proyek Pengembangan Pembangunan Gedung Margono Suradji Yogyakarta Berbasis PMBOK, didapatkan bahwa salah satu risiko tinggi yang berpengaruh pada kinerja waktu proyek adalah jadwal pengiriman material ke site. Agar perencanaan dan penggunaan material menjadi efektif dan efisien, diperlukan perencanaan kebutuhan material yang tepat. Tujuan dari penelitian ini adalah untuk mendapatkan gambaran perencanaan pengadaan material yang lebih terukur terhadap kuantitas dan jadwal penggunaan material dengan mengaplikasikan model pengadaan metode MRP. Dengan adanya metode MRP diharapkan ketersediaan stok material dapat terjaga secara berkesinambungan. Berdasarkan analisis yang dilakukan, dengan teknik lot-sizing lot for lot model POQ ditemukan pengelola proyek dapat meramalkan jumlah material yang harus dipesan dan juga stock yang harus terjaga dalam setiap pekan sesuai dengan jadwal pelaksanaan proyek. Hasil analisis menunjukkan bahwa material bekisting (multiplex 6 mm, 120x240), proses pengadaannya dapat lebih terukur, yaitu pemesanan dilakukan selama 6 kali, dengan jumlah yang berbeda-beda yang disesuaikan dengan kebutuhan pada pekan tersebu. Material besi Dia. 10 mm juga perlu dipesan sebanyak 6 kali dalam 1 periode, sedangkan material besi dia. 19 mm, besi dia. 22 mm, dan wiremesh M-10 hanya cukup 1 kali pemesanan dalam 1 periode pelaksanaan pekerjaa
PENGEMBANGAN PROSES PERENCANAAN PADA PROYEK EPC BERBASIS PMBOK UNTUK MENINGKATKAN KUALITAS PERENCANAAN PROYEK YANG BERKAITAN DENGAN KINERJA WAKTU DI PT. KE
Proyek EPC (Engineering, Procurement, and Construction) telah menjadi salah satu metode pelaksanaan proyek populer yang banyak dipilih oleh pemilik proyek maupun kontraktor. Proyek EPC merupakan jenis proyek konstruksi yang kompleks dan memiliki perbedaan karakter dengan proyek konstruksi biasa, sehingga keterlambatan proyek merupakan fenomena yang kerap terjadi pada proyek EPC. Praktik Proyek EPC saat ini harus mengutamakan penerapan manajemen proyek, terutama untuk proyek skala besar di seluruh dunia. PT. KE merupakan salah satu badan usaha yang mengelola proyek EPC yang dalam pelaksanaannya banyak mengalami keterlambatan, salah satu penyebabnya adalah dispute antara desain dan dokumen kontrak yang menunjukkan lemahnya proses perencanaan. Penelitian ini bertujuan mengidentifikasi peristiwa risiko dalam tahap perencanaan yang mempengaruhi kualitas perencanaan dalam keterkaitannya dengan kinerja waktu di PT. KE untuk mengembangkan kerangka perencanaan proyek yang diharapkan dapat dijadikan strategi baru dalam meningkatkan kinerja waktu proyek berbasis PMBOK (Project Management Body of Knowledge) 2013. Pada penelitian ini ditemukan 3 faktor dominan yang berpengaruh pada kualitas perencanaan yang berdampak pada kinerja waktu di PT.KE dan dalam integrasi perencanaan eksisting terhadap PMBOK 2013, ditemukan 1 aktivitas precanaan yang harus ditambahkan
Pengembangan Manajemen Sumber Daya Manusia Berbasis PMBOK Untuk Meningkatkan Produktivitas Pada PT. AB
Manajemen sumber daya manusia sangat mempengaruhi produktivitas (Bloom, N., & Van Reenen, J., 2011). Pengaruh tersebut dapat bersumber dari skill pekerja, attitudes, dan behavior (Katou, A.A., & Budhwar, P., 2015). Penerapan manajemen sumber daya manusia merupakan satu kesatuan dalam menentukan strategi yang kompetitiv (Neal, A., West, M.A., & Patterson, M.G., 2005). Penerapan manajemen sumber daya manusia secara sistematis dapat meningkatkan produktivitas sebesar 3.27% dari total produksi (Katou, A.A., & Budhwar, P., 2015). Sehingga, manajemen sumber daya manusia merupakan aspek yang sangat penting dalam banyak sector (Eze, M.O., 2018). PT. AB merupakan perusahaan yang bergerak pada sector fabrikasi precast yang cukup terkemuka di Indonesia. Namun, dalam rangka memenuhi pasokan kebutuhan precast, produktivitas di PT. AB tidak sesuai dengan jumlah yang telah ditargetkan, terutama pada produksi precast spun pile. Oleh karena itu, penelitian ini bertujuan untuk megetahui risiko yang berpengaruh tinggi terhadap perencanaan manajemen sumber daya manusia dan mengembangkan strategi di PT. AB. Pada penelitian ini, penilaian risiko dan pengembangan perencanaan manajemen manajemen sumber daya manusia dilakukan dengan berbasis PMBOK
ANALISIS RISIKO PENYEBAB KETERLAMBATAN PROYEK PENGEMBANGAN PEMBANGUNAN GEDUNG MARGONO SURADJI YOGYAKARTA BERBASIS PMBOK
The expansion of industry and the growth of development facilities in Indonesia is very rapid, especially the construction of buildings. Then the level of difficulty to manage and run a building project is getting higher. The higher level of difficulty, the longer the duration of time required to complete the project. Even though an activity has been planned as well as possible, it still contains uncertainty that it will run fully according to the plan. This happened to the building construction project in Yogyakarta, where the project experienced a delay of 35%. This study aims to find out the causes that have a high influence on the delay in the project. In this study, the influence value category was calculated using the project risk management calculation approach based on the 2017 PMBOK
ANALISIS RISIKO PENYEBAB KETERLAMBATAN PROYEK PENGEMBANGAN PEMBANGUNAN GEDUNG MARGONO SURADJI YOGYAKARTA BERBASIS PMBOK
The expansion of industry and the growth of development facilities in Indonesia is very rapid, especially the construction of buildings. Then the level of difficulty to manage and run a building project is getting higher. The higher level of difficulty, the longer the duration of time required to complete the project. Even though an activity has been planned as well as possible, it still contains uncertainty that it will run fully according to the plan. This happened to the building construction project in Yogyakarta, where the project experienced a delay of 35%. This study aims to find out the causes that have a high influence on the delay in the project. In this study, the influence value category was calculated using the project risk management calculation approach based on the 2017 PMBOK
Pengaruh Penerapan Keselamatan dan Kesehatan Kerja (K3) terhadap Efektivitas Pencegahan Kecelakan Kerja
Project Constructions are unique, safety or security and protection factors at work become one of the most important factors of work productivity (Hanafi, 2017). Occupational safety and health have a contribution value of up to 20.2% on performance (Kartikasari, 2017). In the implementation of building projects by PT. XY found a lack of awareness of workers in the use of equipment and safety equipment, this is evident from the lack of use of protective fences and also signs/warning signs that are not fully installed. This research will discuss what are the dominant risks that influence the implementation of OHS management at PT. XY. Based on these dominant risks, this reaserch will create a safety execution development based on the Construction Extension to PMBOK Guide - 2016 Edition
Pemanfaatan Lahan Produktif Taman Interaksi Teratai RW09 Kelurahan Palmerah untuk TOGA dan Tanaman Hidroponik
Pengabdian kepada Masyarakat ini berfokus pada pemberdayaan lingkungan permukiman RW 09 Kelurahan Palmerah, Kecamatan Palmerah, Jakarta Barat di Taman Interaktif Teratai. Pengelola Taman Interaksi Teratai belum memanfaatkan penggunaan lahan taman secara maksimal kepada warga, yang memberikan dampak terutama terkait kesehatan. Tujuan pelaksanaan kegiatan PkM adalah untuk lebih mensinergikan pemanfaatan lahan yang bermanfaat meningkatkan kesehatan dan ketahanan pangan melalui tanaman obat-obatan serta tanaman hidroponik. Metode pelaksanaan dilakukan secara bertahap, meliputi sosialisasi, pelatihan, penerapan teknologi langsung di taman interaksi bersama mitra sasaran yaitu PKK RW 09, pendampingan intensif, serta evaluasi. Hasil kegiatan adalah membangun sistem penanaman hidroponik NFT (Nutrient Film Technique) dan menyediakan tanaman obat keluarga (TOGA) dengan konsep vertical garden (tegak lurus) di Taman Interaktif RW 09 Kelurahan Palmerah, Kecamatan Palmerah, Jakarta Barat. Hasil evaluasi menunjukkan terjadinya peningkatan pengetahuan sebesar 22% dari 66,7 (pre test) menjadi 90 (post test), di mana seluruh peserta mencapai standar ketuntasan ≥75. Ibu-ibu PKK, pengurus RT, RW dan LMK serta warga terlibat secara aktif dalam pelatihan dan perawatan, sehingga keterampilan teknis mereka meningkat secara signifikan. Kesimpulannya, penerapan hidroponik dan Tanaman obat keluarga (TOGA) berhasil meningkatkan kemandirian ketahanan pangan dalam hal ini sayur mayur segar dan kesehatan keluarga
Going Beyond Counting First Authors in Author Co-citation Analysis
The present study examines one of the fundamental aspects of author co-citation analysis (ACA) - the way co-citation
counts are defined. Co-citation counting provides the data on which all subsequent statistical analyses and mappings
are based, and we compare ACA results based on two different types of co-citation counting - the traditional type that
only counts the first one among a cited work's authors on the one hand and a non-traditional type that takes into
account the first 5 authors of a cited work on the other hand. Results indicate that the picture produced through this non-traditional author co-citation counting contains more coherent author groups and is therefore considerably clearer. However, this picture represents fewer specialties in the research field being studied than that produced through the traditional first-author co-citation counting when the same number of top-ranked authors is selected and analyzed. Reasons for these effects are discussed
- …