253 research outputs found
MODELING STUDY OF NATURAL AIR CIRCULATION IN HOTEL & RESORT BUILDING: Indonesia
The planning and design of a Hotel & Resort should be in accordance with the climate and location of the construction. In Indonesia, especially in areas that have cool air and are far from air pollution and noise pollution, they have a tropical climate, so Tropical Architecture is very suitable for planning and designing Hotels & Resorts, but it is possible to plan and design Hotels & Resorts with other architectural characteristics. Modeling studies can also be called modeling design and information about buildings, which is a field of science that examines development planning, development implementation, and maintaining and repairing if there is damage in a building. Activities from these fields of science are studying design drawings of houses, offices, buildings, and so on. In addition, this field of science does not only study building design, but this field of science will learn how to calculate the cost budget plan which is often referred to as RAB. Air circulation modeling has several sub-specifics, namely Planning Plan, building view, section view, Air Flow Scheme, and air circulation calculation. The building modeling method here uses an application called Autocad and SketchUp, then for the calculation of the natural air circulation using the ACPH (Hourly Air Exchange System) method. . Building 1 has a building area of approximately 1486.7 M2 2 floors, building 2 has a building area of 461 M2 1 floor, and the hotel room area has a building area of 940.56 M2. 
STUDI EVALUASI PENGENDALIAN BIAYA (COST CONTROL) DAN JADWAL PELAKSANAAN (SCHEDULING) PADA PROYEK PEMBANGUNAN GEDUNG RAWAT JALAN DAN BASSEMENT RSUD MAJALENGKA MENGGUNAKAN METODE EARNED VALUE DAN SOFTWARE MS. PROJECT : Indonesia
Planning and controlling costs and time is part of the overall construction project management. In addition to the assessment in terms of quality, the achievement of a project can also be assessed in terms of cost and time. The costs that have been incurred and the time spent in completing a job must be measured continuously for deviations from the plan. The presence of significant cost and time deviations indicates poor project management. With the existence of project performance indicators in terms of cost and time this allows preventive actions so that project implementation goes according to plan. The concept of "Earned Value" is one of the tools used in project management that integrates cost and time and by using Ms. Projects. Ms. Project is a project management software product and is developed and sold by Microsoft. It is designed to assist a project manager in developing plans, assigning resources and tasks, tracking progress, managing budgets and analyzing workloads. From the results of the evaluation of cost control and project schedules on outpatient and basement building construction projects using the earned value method, it can be concluded that the CV (Cost Variant) in this project results in 0 which means the Zero Number on the Cost Variant indicates that the cost is within the budget, SV (Schedule). Variant ) the value shows a negative number, this means that the completion of the work is delayed, the CPI (Cost Performance Index) is 1, meaning that the expenditure is in accordance with the project budge
PENGARUH CELEBRITY ENDORSER (ARIEF MUHAMAD) TERHADAP MINAT BELI KONSUMEN PADA PRODUK ERIGO STORE
Effect of Celebrity Endorser (Arief Muhamad) on consumer buying interest to products Erigo Store. Study program of marketing management DIII. Faculty of economic. State University of Jakarta.The aim of this study was to test the effect of Celebrity Endorser (Arief Muahamad) on consumer buying interest on Erigo Store Product. This study took a sample of – in the Faculty of Economics, University of Jakarta were used as respondents in the study. The author uses descriptive quantitative methods as used to test determines the celebrity endorser influence on consumer buying. The variable x in this study are attractiveness, trustworthiness, expertise and y variables that buying interest Quantitative testing performed by multiple linear regression quantitative test that determines how closely the relationship between the variable x and y variables.
Keywords : celebrity endorser, attractiveness, trustworthiness, expertise, interest
in buying
PELAKSANAAN BOX UNDERPASS
Jalan Tol Cisumdawu yang merupakan jalur transportasi yang sedang dilakukan pelaksanaan pembangunan yang berlokasi di Cileunyi-Sumedang-Dawuan. Pembangunan tol Cileunyi-Sumedang-Dawuan diketahui ruas jalan tol akan dilaksanakan untuk sepanjang 60,273 km yang akan melewati daerah sumedang di bagi menjadi 6 tahap yaitu, seksi I Cileunyi-Rancakalong (12,025 km), seksi II Rancakalong-Sumedang (17, 350 km), seksi III Sumedang-Cimalaka (3,750 km), dan seksi IV Cimalaka-Legok (7,200 km), seksi V Legok-Ujung Jaya (15,900 km), dan seksi VI Ujung Jaya-Dawuan (4,048 km). Untuk pembangunan Box Underpass di berlokasi di Sumedang-Cimalaka, Kabupaten Sumedang, Pelaksanaan Pekerjaan Box Underpass salah satu pekerjaan pembangunan di proyek Tol Cisumdawu seski 3. Tujuan kerja praktek ini mengetahui proses pelaksanaan pekerjaan Box Underpass agar mahasiswa mendapatkan pengetahuan tentang cara pelaksanaan pembangunan salah satu fasilitas jalan tol. Pelaksanaan pekerjaan yang dilakukan meliputi pekerjaan Bottom atau lantai dasar, Wall, Head Wall, Wing Wall, Plat Injak, pekerjaan ini menggunakan mutu beton K-350 kelas B1. Pekerjaan ini dilakukan dilokasi STA 27+159.381
TINJAUAN BANGKITAN DAN TARIKAN PERJALANAN PASCA BEROPERASINYA BANDARA INTERNASIONAL KERTAJATI JAWA BARAT (BIJB) DAN PROYEKSI PERTUMBUHAN LALU LINTAS
The rapid development in Majalengka regency especially Kertajati district which will spur the level of change in traffic intensity, because of the new development in the form of transportation facilities namely Kertajati International Airport West Java (BIJB). With the operation of Kertajati International Airport West java (BIJB) it will bring changes in the increase in traffic volume on the Kadipaten – Jatitujuh. The purpose of this study is to estimate the magnitude of the generation and the attraction of traffic movements due to the operation of the Kertajati International Airport west Java (BIJB), Identify road traffic performance due to the operation of Kertajati International Airport West Java in 15 years after operating, recommending a handling strategy to overcome the effects of traffic performance due to the operation of Kertajati International Airport West Java (BIJB). Trip attraction survey ws conducted by distributing questionnaires with 130 samples. The traffic performance of jalan Kadipaten – Jatitujuh in 2018 – 2031 it is still within safe limits with DS 0,69 in 2032 – 2033 DS 0,76 which means it is not safe. The traffic performance of jala Jatitujuh – Kadipaten in 2018 – 2032 it is still within safe limits with DS 0,74 in 2033 DS 0,81 which means it is not safe. As a suggestion and strategic recommendation for handling the impact of Kadipaten – Jatitujuh road traffic performance is to make efforts to improve geometric improvements in section and intersection, widening the road, making new lines, providing parking facilities and optimizing the available infrastructure (traffic management) in the form of traffic signs
ANALISA PENERAPAN MANAJEMEN WAKTU PENGADAAN MATERIAL PADA PROYEK KONSTRUKSI JARINGAN AIR MINUM (SUB PEKERJAAN RESERVOIR KAPASITAS 150M3) (Studi Kasus di Proyek Jaringan Air Minum PDAM Kab. Majalengka)
Setiap proyek konstruksi mempunyai jangka waktu pelaksanaan yang telah ditetapkan di dalam dokumen kontrak pekerjaan. Namun, tidak semua proyek konstruksi dapat selesai tepat pada waktu yang telah ditetapkan dalam dokumen kontrak. Begitu juga di Kabupaten Majalengka, dimana perusahaan-perusahaan yang bergerak dibidang jasa konstruksi yang menangani proyek-proyek bangunan keairan juga terkadang mengalami keterlambatan. Keberhasilan melaksanakan proyek konstruksi tepat pada waktunya adalah suatu tujuan terpenting, baik bagi pemilik maupun kontraktor. Keterlambatan adalah sebuah kondisi yang sangat tidak dikehendaki, karena akan sangat merugikan kedua belah pihak dari segi biaya dan waktu.Proyek konstruksi juga semakin hari semakin kompleks sehubungan dengan standar-standar baru yang ditetapkan, teknologi yang canggih, dan keinginan owner untuk melakukan penambahan ataupun perubahan lingkup pekerjaan. Suksesnya sebuah proyek tak lepas dari kerja sama antara pihak-pihak yang terlibat didalamnya yaitu owner, engineer, dan kontraktor. Pihak-pihak tersebut mempunyai kepentingan dan tujuan yang berbeda, sehingga konflik/perselisihan dapat mengakibatkan keterlambatan yang selalu timbul akibat perbedaan pendapat pada saat perencanaan dan pembangunan proyek.Berdasarkan latar belakang tersebut diatas dan berdasarkan penelitian sebelumnya yang penulis lakukan pada Kerja Praktek tentang Pembangunan Konstruksi Jaringan Air Minum PDAM Kabupaten Majalengka, penulis akan menganalisa keterlambatan proyek tersebut secara empiris, yaitu dengan menggunakan metode CPM (Critical Path Method) dan metode PERT (Program Evaluation and Review)
ANALISIS NILAI HASIL TERHADAP WAKTU MENGGUNAKAN SOFTWARE MICROSOFT PROJECT (STUDI KASUS PADA PROYEK PEMBANGUNAN KONSTRUKSI GEDUNG KANTOR KPU KABUPATEN MAJALENGKA): Indonesia
The rapid of economic growth in Indonesia, of course, accompanied by the increasing public demand for construction projects. Each project has a different goal, in the implementation of the General Election Commission Office Building Construction Project which is planned for 143 calendar days, namely in the period 10th August 2020 to 31st December 2020 by the Contractor PT. Kalimasada Zahraa Jaya with a project value of Rp. 4.306.705.600,-
In the process of achieving these goals, a good construction management is needed so that the project is in accordance with the plan. In this case, the Earned Value Analysis method is used to determine if there is a discrepancy in the implementation of the project. The data analysis process uses Microsoft Project software for project scheduling and human resource allocation for each element of work effectively and efficiently. The data analyzed include presenting S curve graph data, calculating the schedule variance "SV" and SPI values from the BCWP and BCWS data values every week or cumulatively to produce the actual project duration and the remaining total duration.
From the results of the "EVA" method in the 20th week, the comulative EV value of Rp. 4,306,705,600,
which shows that the costs incurred to complete the project are in accordance to the plan. The resulting SV figure is + Rp 20,499,919,- which means that the completion of the work is faster than the plan and the SPI value is 1,005, the project implementation performance is better than the schedule planning ahead of the plan
ANALISA DAYA DUKUNG DAN PENURUNAN PONDASI TIANG BOR (BORED PILE)TUNGGAL DENGAN MENGGUNAKAN PROGRAM PLAXIS ( Studi Kasus: Proyek Pembangunan Yogya Toserba II Majalengka )
Bored Pile Foundation is a foundation type applied to transfer payload from structural part to upper/upper structure to soil layer below under it’s untill bearing capacity wanted, hence required a part of contrsruction building under/sub-structure without existence of risk from shear disrepair or over setlement.Purpose of research is analysis level of foundation bearing capacity of single bored pile and setlement happened from some methods conventionally, what based on assaying data in field and with finite element method applies program Plaxis where modelling of soil is Mohr Coulomb. Then does analysis and comparison from result of calculation with the methods is upper.Keyword : Plaxis, Mohr Coulom
PENERAPAN PENJADWALAN WAKTU MENGGUNAKAN METODE CPM (CRITICAL PATH METHODE) DAN PERT PADA PEMBANGUNAN GEDUNG INSTALASI RAWAT JALAN RSUD MAJALENGKA
The project implementer is carried out by PT. Waskita Karya, the success of carrying out construction projects on time is the most important goal in a project, one of which is by applying the CPM (Critical Path Method) method. The budget used in this study is equal to. With a budget of Rp. 34,799,108,000.00, preparatory work, structural work, work, architect work, plumbing work, and electrical work.The objectives of this research are among others: to determine the work network or network project for the construction Gedung Instalasi Rawat Jalan RSUD Majalengka, and analyze the optimal time to complete the construction project Gedung Instalasi Rawat Jalan RSUD Majalengka.Project scheduling begins by creating a network based on the critical time of each activity. Critical time at the Basement project and the Nursing Installation Building at Majalengka Regional Hospital start, B, C, D, E, F, H, I, J, R, S, and M1. Based on the calculation of PERT, it is known that the project opportunity with 196 days is 97.22%. So that the project can run smoothly and over time, the project implementers pay attention to activities with critical time. Activities at critical times must be obeyed so that other activities are not obstructed. There was a delay in completion time in Basement dan Gedung Instalasi Rawat RSUD Majalengka the due to lack of expertise, owned by the service provider. These conditions cause difficult service providers to complete the project on time. Keywords: PERT, CPM, Schedulin
The Development Impact of Information Technology in Trade Facilitation
The main purpose of this chapter is to provide an overview and context of the country studies on Information Technology (IT) for Trade Facilitation (TF) in Small and Medium Enterprises (SMEs).Impact of Information Techonology, Trade Facilitation, SMEs
- …
