Jurnal Pengembangan Energi Nuklir
Not a member yet
349 research outputs found
Sort by
DAUR BAHAN BAKAR NUKLIR BERBASIS TEKNOLOGI ATW
ABSTRAK DAUR BAHAN BAKAR NUKLIR BERBASIS TEKNOLOGI ATW. Telah dilakukan pengkajian daur bahan bakar nuklir berbasis teknologi ATW (accelerator-driven transmutation waste). ATW adalah perangkat reaktor nuklir subkritis yang dimanfaatkan untuk memfasilitasi proses transmutasi bahan bakar bekas. Sebelum dilakukan proses transmutasi, teriebih dahulu dilakukan proses partisi bahan bakar bekas, yaitu proses pengolahan dan pemisahan unsur-unsur yang terdapat dalam bahan bakar bekas. Proses Transmutasi dilakukan terhadap unsur-unsur aktinida minor dan produk fisi umur panjang. Produk dari proses transmutasi adalah unsur-unsur produk fisi yang lebih stabil dengan umur paruh yang pendek, dan listrik. Konsep ATW mempengaruhi sistem daur bahan bakar nuklir yang diadopsi selama ini. Daur bahan bakar nuklir dobel strata yang merupakan bentuk implementasi teknologi ATW juga dibahas. Pada konsep daur dobel strata, strata pertama merupakan proses transmutasi pada reaktor nuklir komersial, sedang strata kedua dilakukan pada fasilitas ATW. Sebagai hasil studi, pada makalah ini juga diajukan sejumlah strategi implementasi daur bahan bakar nuklir dobel strata. Kata kunci: teknologi ATW, transmutasi, daur dobel strata. ABSTRACT NUCLEAR FUEL CYCLE BASED ON THE ATW TECHNOLOGY. The assessment of nuclear fuel cycle based on the ATW (accelerator-driven transmutation waste) technology has been carried out. The ATW is subcritical instrument which used to transmutate spent fuels. To prepare transmutation, partition of spent fuels should be done. Partition is the process to separate the elements in the spent fuels,* before transmuting its minor actinides and long lived fissile products in subcritical nuclear reactors. Products of the transmutation process are the relatively stable elements which have short lived fissile products, and electricity. The concept of double strata nuclear fuel cycles as an implementation of ATW are also studied. In this concept, the first strata is the transmutation process in critical nuclear reactors, and at the second strata is the transmutation process at the sub critical facility called ATW system. Some strategies in implementation of double strata cycles are also proposed. Keywords: ATW technology, transmutation, double strata cycle
PERHITUNGAN PERCEPATAN TANAH MAKSIMUM DI UJUNG LEMAHABANG PADA BOR D-28 (300 METER) MENGGUNAKAN PROGRAM SHAKE
ABSTRAK PERHITUNGAN PERCEPATAN TANAH MAKSIMUM DI UJUNG LEMAHABANG PADA BOR D-28 (300 METER) MENGGUNAKAN PROGRAM SHAKE. Lokasi yang diusulkan oleh Konsultan untuk pondasi reaktor Pembangkit Listrik Tenaga Nuklir (PLTN) terietak tepat di atas lubang bor D28 yang mempunyai kedalaman 300 meter. Bor dalam tersebut diperiukan untuk mengetahui perilaku tanah/batuan secara detil, baik secara statik maupun dinamik. Tujuan perhitungan percepatan tanah maksimum ini secara umum adalah untuk mengetahui sifat dinamik permukaan yang akan berpengaruh terhadap pondasi. Cara yang dilakukan dalam perhitungan ini, menggunakan program Shake dengan memasukan parameter-parameter tanah/batuan, antara lain kedalaman pelapisan, densiti, kecepatan geser tanah, damping dan input gempa iokal maka akan diperoleh nilai percepatan tanah maksimum (maximum acceleration). Untuk parameter input gempa menggunakan gempa daerah lain yang mempunyai kesamaan skala seperti gempa Kobe (M=7.2 skala Richter) karena gempa tersebut sulit diperoleh di daerah penelitian. Hasil running dari penelitian ini sangat dipengaruhi oleh input damping, kedalaman pelapisan, dan input gempa itu sendiri. Sehingga perilaku pondasi untuk struktur bangunan besar yang diperhitungkan adanya gempa, tergantung dari desain awai nilai dinamik tanah seperti halnya percepatan tanah maksimum permukaan. ABSTRACT THE CALCULATION OF MAXIMUM ACCELERATION AT THE UJUNG LEMAHABANG SITE FOR D-28 (300 METER) USED SHAKE PROGRAM. Proposed site from Consultant to use for a foundation of Nuclear Power Plants lies at the bore hole D28, it has 300 meters depths. The bore hole have done to the soil/stone characteristic including of static and dynamic analysis. Generally the purpose of maximum acceleration for identification a dynamic surfacethat will affect of a founddation. Methodology is used the shake programe with including of the soil/stone parameters, namely depth, density, shear wave velocity, damping, earthquake so it will gate of the maximum acceleration. Input motion earthquake used a other site that it has same scale likes the Kobe Earthquake (M = 7.2 Richter) as earthqquake very difficult in the ULA site. The results of the running from Shake program very affect of a damping, depths of the layers, and input motion earthquake self. So that a foundation characteristic for big stucture will calculate of the earthquake, depending from fisrt desain of a dynamic value like this maximum acceleration
KELAYAKAN EKONOMI DAN PENDANAAN PEMBANGUNAN PROYEK PLTN JENIS PWR TIPE OPR-1000 DI SEMENANJUNG MURIA
ABSTRAK KELAYAKAN EKONOMI DAN PENDANAAN PEMBANGUNAN PROYEK PLTN JENIS PWR TIPE OPR-1000 DI SEMENANJUNG MURIA. Telah dilakukan studi untuk mengetahui kelayakan ekonomi dan pendanaan pembangunan PLTN OPR-1000 di Semenanjung Muria. Studi ini dilakukan dengan tahapan-tahapan sbb: pemutakhiran data baik teknis maupun ekonomi dari PLTN OPR-1000, survei sumber-sumber pendanaan, mengetahui kelayakan ekonomi (Economic Viability) dengan menghitung biaya pembangkitan listrik (Electricity Generation Cost), menghitung penjualan listrik (Electricity Tariff), biaya pembangunan (Construction Cost) PLTN OPR-1000 dan menghitung kelayakan pendanaan (Financing Viability) pembangunan PLTN OPR-1000 dengan menggunakan kriteria kelayakan yang urnum digunakan (Nilai Bersih Sekarang (NPV), Tingkat Pengembalian Modal (IRR) dan Lama Pengembalian Modal (Payback Period)) dengan menggunakan KEPCO Spread Sheet. Berdasarkan perhitungan didapatkan hasil bahwa ongkos pembangkitan listrik sebesar 4,0866 cent/kWh, sementara harga penjualan (tarif) listrik adalah 6,6399 cent/kWh (setelah dikenai pajak)! Biaya pembangunan PLTN OPR-1000 secara keseluruhan adalah US 90,52 juta dan 12,11 tahun. Dari sini dapat disimpulkan bahwa dengan harga jual listrik sebesar 6,640 cent/kWh atau 0,0664 US 4,092.09 million (included interest and financial fee, excluded initial nuclear fuel). The calculation of financing viability in base case obtained that value of IRR, NPV and Payback Period for total investment is 10.37%, US/kWh, basically this project of OPR-1000 construction is very feasible and beneficial. From investment side, this project can attract investor because the rate of capital return is high enough, profit in the end of economic life is big enough and payback period is short
STUDI KOMPARASI MODEL PERHITUNGAN BIAYA PEMBANGKITAN LISTRIK TERARAS PLTN
ABSTRAKSTUDI KOMPARASI MODEL PERHITUNGAN BIAYA PEMBANGKITAN LISTRIK TERARAS PLTN. Analisis keekonomian yang umumnya dilakukan melalui perhitungan Levelized Unit Electricity Cost (LUEC) merupakan hal yang krusial untuk dilakukan sebelum diambilnya keputusan investasi pada proyek PLTN. Terdapat beberapa model yang dapat digunakan untuk menghitung LUEC, diantaranya adalah: Model Puslitbang PT. PLN (Persero), model Mini G4ECONS dan Model Levelized Cost. Tujuan studi adalah untuk melakukan komparasi diantara ketiga model tersebut. Teknik komparasi dilakukan dengan penelusuran formula yang digunakan oleh masing-masing model dan selanjutnya diberikan contoh perhitungan LUEC PLTN SMR 2 x 100 MW menggunakan ketiga model tersebut. Hasil penelitian menunjukkan bahwa model Puslitbang PT. PLN (Persero) mempunyai kesamaan prinsip dengan model Mini G4ECONS, yaitu menggunakan Capital Recovery Factor (CRF) untuk mendiskonto biaya investasi menjadi nilai anuitas selama umur pembangkit. LUEC pada kedua model dihitung dengan membagi hasil jumlahan biaya investasi tahunan dan biaya pengoperasian PLTN dengan produksi listrik tahunan. Sedangkan model Levelized Cost berbasis pada arus kas tahunan. Total biaya tahunan maupun produksi listrik tahunan semuanya ditarik ke tahun awal konstruksi sehingga diperoleh total biaya tahunan terdiskonto dan total produksi energi tahunan terdiskonto. LUEC diperoleh dengan membagi kedua nilai terdiskonto tersebut. Perhitungan LUEC pada ketiga model menghasilkan nilai LUEC sebesar: 14,5942 cents US/kWh pada model Mini G4ECONS dan 14,240 cents US/kWh pada model Levelized Cost.Kata kunci: komparasi, model perhitungan LUEC, PLTNABSTRACTCOMPARISON STUDY ON MODELS FOR CALCULATION OF NPP’s LEVELIZED UNIT ELECTRICITY COST. Economic analysis that is generally done through the calculation of Levelized Unit Electricity Cost (LUEC) is crucial to be done prior to any investment decision on the nuclear power plant (NPP) project. There are several models that can be used to calculate LUEC, which are: R&D PT. PLN (Persero) Model, Mini G4ECONS model and Levelized Cost model. This study aimed to perform a comparison between the three models. Comparison technique was done by tracking the persamaan used for each model and then given a case of LUEC calculation for SMR NPP 2 x 100 MW using these models. The result showed that the R&D PT. PLN (Persero) Model have a common principle with Mini G4ECONS model, which use Capital Recovery Factor (CRF) to discount the investment cost which eventually become annuity value along the life of plant. LUEC on both models is calculated by dividing the sum of the annual investment cost and the cost for operating NPP with an annual electricity production.While Levelized Cost model based on the annual cash flow. Total of annual costs and annual electricity production were discounted to the first year of construction in order to obtain the total discounted annual cost and the total discounted energy generation. LUEC was obtained by dividing both of the discounted values. LUEC calculations on the three models produce LUEC value, which are: 14.5942 cents US/kWh for R&D PT. PLN (Persero) Model, 15.056 cents US/kWh for Levelized Cost model.Keywords: comparison, LUEC calculation models, NP
STUDI PENGARUH PERUBAHAN KONDISI LINGKUNGAN TAPAK TERHADAP HARGA LISTRIK DAN AIR PADA SISTEM DESALINASI DENGAN SUMBER ENERGI NUKLIR DAN FOSIL
ABSTRAK STUDI PENGARUH PERUBAHAN KONDISI LINGKUNGAN TAPAK TERHADAP HARGA LISTRIK DAN AIR PADA SISTEM DESALINASI DENGAN SUMBER ENERGI NUKLIR DAN FOSIL. Studi ini bertujuan untuk mengetahui pengaruh perubahan kondisi lingkungan tapak; yaitu salinitas, suhu air laut dan suhu udara lingkungan terhadap harga listrik dan air, serta dapat menentukan jenis pembangkit dan teknologi desalinasi yang paling optimal ditinjau dari aspek teknis dan ekonomi sesuai dengan karakteristik tapak yang diinginkan. Sebagai sumber energi adalah PLTU-Batubara, Daur Gabung, Turbin Gas dan PLTN SMART. Untuk jenis teknologi desalinasi dipilih jenis MSF, MED dan RO. Perhitungan harga listrik dan air menggunakan tools dari IAEA yaitu DEEP 2.1. Dari hasil perhitungan menunjukkan bahwa salinitas air laut hanya berpengaruh terhadap harga air dan tidak berpengaruh terhadap harga listrik. Untuk PLTU-Batubara, Daur Gabung dan PLTN SMART yang dikopling dengan MED, MSF dan RO, peningkatan suhu air laut akan meningkatkan harga listrik dan menurunkan harga air. Untuk PLTU-Batubara dan SMART yang dikopling dengan semua jenis desalinasi, harga listrik dan air tidak terpengaruh dengan adanya perubahan suhu udara. Sedangkan pada Daur Gabung dan Turbin Gas, harga listrik dan air meningkat dengan kenaikan suhu udara. ABSTRACT STUDY ON ANALYSIS OF INFLUENCE OF SITE ENVIRONMENTAL CONDITIONS ALTERATION TO ELECTRICITY AND WATER PRICES IN DESALINATION SYSTEM WITH NUCLEAR AND FOSSIL ENERGY SOURCES. This study have purpose to know the alteration effect of site environmental conditions which are salinity, seawater temperature and ambient temperature towards electricity and water costs, as well as can determine best power plant and desalination technology type viewed from technical and economical aspects with suitable of site characteristic. The energy sources are Coal- Fired Power Plant (CFPP), Combined Cycle (CC), Gas Turbine (GT) and SMART (System-integrated Modular Advanced ReacTor). Type of desalination technologies are choosed MED (Multi-Effect Distillation), MSF (Multi-Stage Flash) dan RO (Reverse Osmosis). The calculation of electricity and water costs are used DEEP 2.1 (Desalination Economic Evaluation Program) from IAEA (International Atomic Energy Agency). Results of calculation show that seawater salinity only influence towards water cost and not influence towards electricity cost. For CFPP, CC and SMART which coupled with MED, MSF and RO, increase of seawater temperature will raise electricity cost and decrease water cost. For CFPP and SMART that coupled with all types of desalination plant, electricity and water cost are not influenced by alteration of ambient temperature. Whereas for CC and GT which coupled with all types of desalination plant, electricity and water costs will increase by increasing the ambient temperature
ANALISIS KONDISI INDUSTRI NASIONAL PASKA KRISIS MULTI DIMENSI 1997 TERKAIT DENGAN PERENCANAAN PROGRAM PARTISIPASI NASIONAL PEMBANGUNAN PLTN
ABSTRAK ANALISIS KONDISI INDUSTRI NASIONAL PASKA KRISIS MULTI DIMENSI 1997 TERKAIT DENGAN PERENCANAAN PROGRAM PARTISIPASI NASIONAL PEMBANGUNAN PLTN. Telah dilakukan identifikasi, analisis, dan perumusan usulan pemecahan terhadap isu (masalah fundamental) terkait dengan status industri manufakturing nasional paska krisis multi- dimensi 1997. Status terkini industri nasional diperiukan sebagai pertimbangan perencanaan program partisipasi nasional pembarigunan PLTN. Informasi kondisi industri diperoleh baik melalui kajian literatur maupun penyerapan berbagai pendapat, pengetahuan, dan pengalaman para praktisi melalui diskusi, seminar, pemantauan media maupun kunjungan teknis ke berbagai institusi dan/atau perusahaan. Isu teridentifikasi diklasifikasikan menjadi 5 aspek utama, yaitu struktural, operasional, teknis, finansial, dan kultural. Untuk setiap aspek tersebut telah diusulkan berbagai konsep pemecahan yang melibatkan berbagai stakeholder agar tercapai sinergi kebijakan pada tingkat yang paling tinggi. Aspek kultural ditengarai merupakan aspek utama yang mendasari permasalahan pada aspek yang lain. Oleh karena itu, demi kepastian arah pengembangan industri maka pertu diintroduksikan Nilai (value) yang tepat untuk mengendalikan perilaku stakeholder. Telah diusulkan implementasi Sistem Nilai altematif, yaitu Tata Kelola Korporasi dan Manajemen Mutu Terpadu. Telah pula diidentifikasi bahwa sebagai akibat krisis 1997, tahun 1998 output industri manufakturing nasional merosot secara komulatif -11,4%, tetapi antara 1999-2003 telah berkembang berturut-turut sebesar 3,9%, 6,0%, 3,1%, dan 3,4%. Hal ini menunjukkan bahwa sejak 2003 secara total industri manufakturing nasional telah pulih dari akibat krisis. Konsekuensinya, semua hasil studi PARNAS pembangunan PLTN sebelum krisis ekonomi dapat dipakai lagi sebagai acuan perencanaan ke depan, dengan catatan masih perlu dimutakhirkan secara berlanjut. ABSTRACT ANALYSIS ON THE STATUS OF NATIONAL INDUSTRIES FOLLOWING THE 1997 MULTI DIMENSIONAL CRISIS IN RELATION TO THE PLANNING OF NATIONAL PARTICIPATION PROGRAM IN THE CONSTRUCTION OF NUCLEAR POWER PLANT. Various issues (fundamental problems) related to the recent status of national manufacturing industries following the 1997 multi-dimensional cirisis have been identified, analized, and the recommended solution has been proposed. The most recent status of national industries is deemed important to be considered in the planning of national participation for the incoming NPP Project Information on the condition of national industries is acquisited from literatures, media, seminar, as well as from discussion during technical visitation to relevant institutions and companies. The identified issues are classified into 5 aspects, i.e. structural, operational, technical, financial, and cultural. To each aspect, solution concept have been promoted by involving the stakeholder in order to achieve the highest level of synergy. Cultural aspects is perceived to be the most fundamental aspect inducing the other aspects. Therefore, for the certainty of direction of industrial development, it deemed necessary to introduce the appropiate Values System for controlling the behavior of the stakeholder. An alternative Value System has been recommended, i.e. good corporate governance and total quaiity management. Furthermore, it is identified that following the 1997 crisis, during 1998 the output national industries decreased -11,8% , but during 1999-2003 has been steadily increasing by 3,9%, 6,0%, 3,1%. This shows that globally, after 2003 national industries can be perceived to be well recovered from the crisis. Consequently, all the previous results of study on national participation can still be used as reference in planning national participation program, provided that an ever-ending updating study still need to be done.Kata Kunci: Introduksi PLTN, partisipasi nasional, industri manufaktur, krisis multi-dimensi 1997, isu krusial, partisipasi nasional, manajemen mutu terpadu.