Jurnal Pengembangan Energi Nuklir
Not a member yet
    349 research outputs found

    TINGKAT RADIOAKTIVITAS RADIONUKLIDA ALAM PADA BAHAN MAKANAN SEKITAR CALON TAPAK PLTN SEMENANJUNG MURIA

    No full text
    ABSTRAK TINGKAT RADIOAKTIVITAS RADIONUKLIDA ALAM PADA BAHAN MAKANAN SEKITAR CALON TAPAK PLTN UJUNG LEMAHABANG. Data rona awal konsentrasi radionuklida alam (238Th, 226Ra, 228Ra and 40K) dalam sampel bahan makanan, tanah pertanian, dan sumur di sekitar calon tapak PLTN Ujung Lemahabang telah ditentukan dengan spektrometer gamma dengan detektor HPGe. Hasil yang diperoleh menunjukkan bahwa konsentrasi radionuklida air sumur penduduk untuk 40K berkisar antara Batas Deteksi Terendah (BDT) - 2,11 Bq/L, untuk 226Ra berkisar antara 0,06 - 0,12 Bq/L, sedang untuk 228Th dan ­228­Ra tidak terdeteksi. Tanah pertanian di desa Balong dan Tubanan mengandung radionuklida alam dalam konsentrasi yang cukup tinggi, demikian pula untuk beberapa jenis makanan seperti umbi singkong dan daunnya. Konsentrasi K cukup tinggi disemua jenis bahan pangan yang diteliti. Kata kunci: Rona awal, radionuklida, batas deteksi terendah.   ABSTRACT THE RADIOACTIVITY LEVELS OF NATURAL RADIONUCLIDE ON FOODSTUFF AT CANDIDATE SITE. The baseline values of the natural radionuclides concentration (238Th, 226Ra, 228Ra and 40K) have been determined in the foodstuffs, soil, and wells water samples around nuclear power plant site candidate by gamma spectrometry with HPGe detector. The results which obtained indicate that concentration of resident well water radionuclide for 40K ranging from Low Detection Limit - 2,11 Bq/L, ^Ra range from 0,06-0,12 Bq/L, and for 228Th and ­228­Ra is not detected. Farmland in Balong and Tubanan district contain natural radionuclide in concentration of which enough high, and so do for a few food type like the corm and cassava leaf. Concentration of 40K enough high all the checked foodstuffs types. Keywords: Initial condition, radionuclide, low detection limit

    DAMPAK PEMBANGUNAN PLTN-DESALINASI TERHADAP EKONOMI NASIONAL DAN JAWA TIMUR

    No full text
    ABSTRAK DAMPAK PEMBANGUNAN PLTN - DESALINASI TERHADAP EKONOMI NASIONAL DAN JAWA TIMUR. Tujuan dari studi ini adalah menentukan dampak ekonomi dari dibangunnya PLTN - Desalinasi 2 x 100 Mwe tipe SMART yang dikopel dengan instalasi desalinasi sebesar 4 x 10.000 m3/hari. Studi ini dimulai dari pra-pembangunan sampai dengan selesainya pembangunan PLTN - Desalinasi tersebut. Waktu cakupan studi ini adalah 2008 hingga 2017, dan pembangunan dilakukan di Pulau Madura, Jawa Timur. Perkiraan tabel l-O tahun 2008 sampai dengan tahun 2017 telah dibuat dengan proyeksi l-O dinamis. Dampak ekonomi diestimasi dengan multiplier efek (efek pengganda) yang rrieliputi dampak langsung maupun dampak tak langsung, demikian juga yang menyebabkan dampak (induced effect). Belanja pengeluaran dari proyek pembangunan PLTN - Desalinasi SMART ke kontraktor domestik diperkirakan berjumlah sekitar US88,2jutaatausekitar25,6 88,2 juta atau sekitar 25,6% dari semua belanja pengeluaran. Dampak total dari proyek tersebut terhadap ekonomi nasional sebesar Rp. 6.329.347 juta, Rp. 8.439.130 juta dan Rp. 12.658.695 juta untuk masing-masing skenario nilai US dollar terhadap rupiah sebesar Rp. 7.500/US, Rp. 10.000/US,danRp.15.000/US, dan Rp. 15.000/US, masing-masing mewakili skenario pertumbuhan dinamis. Dampak langsung kumulatif selama pra-konstruksi sampai periode konstruksi telah dihitung sebesar US101,8juta,sektornomor48(perlengkapanlistrik),52(bangunan)dan62(jasaperusahaan).HaliniakanmemberikandampakyangcukupbanyaksecaranasionalmaupunregionalJawaTimuruntuksektorsektorlain. ABSTRACTIMPACTOFNUCLEARPOWERANDDESALINATIONPLANTCONSTRUCTIONTOWARDNATIONALANDEASTJAWAECONOMIC.Theobjectiveofthisstudyistodeterminetheeconomicimpactsoftheconstructionofthenuclearpowerplant2x100MW(e)SMARTtypewithdesalination4x10.000m3whichwouldconductinyears.2008to2017inMaduraIsland,EastJava.ThepredictedIOtablesof20082017havebeencreatedbytheapplicationofdynamicIOprojection.Theeconomicimpactwasestimatedthroughmultipliereffectwhichcoversdirectimpactandindirectimpactaswellastheinducedeffect.TheexpendituresofSMARTnuclearpoweranddesalinationplanttothedomesticcontractorsisestimatedtoamountto88.2millionUS 101,8 juta, sektor nomor48 (perlengkapan listrik), 52 (bangunan) dan 62 (jasa perusahaan). Hal ini akan memberikan dampak yang cukup banyak secara nasional maupun regional Jawa Timur untuk sektor-sektor lain.   ABSTRACT IMPACT OF NUCLEAR POWER AND DESALINATION PLANT CONSTRUCTION TOWARD NATIONAL AND EAST JAWA ECONOMIC. The objective of this study is to determine the economic impacts of the construction of the nuclear power plant 2 x 100 MW(e) SMART type with desalination 4 x 10.000 m3 which would conduct in years.2008 to 2017 in Madura Island, East Java. The predicted IO tables of 2008-2017 have been created by the application of dynamic IO projection. The economic impact was estimated through multiplier effect which covers direct impact and indirect impact as well as the induced effect. The expenditures of SMART nuclear power and desalination plant to the domestic contractors is estimated to amount to 88.2 million US or 25.6 % of the whole expenditures. The total impact of the project to the national economy would be Rp. 6.329.347 million, Rp.8.439.130 million, and Rp. 12.658.695 million for each scenario of the exchange rate as high as Rp.7500/US,Rp.10000/US,Rp.10000/US,Rp.15000/US,respectivelyforthescenarioofdynamicgrowth.ThetotalimpactoftheprojecttotheprovincialeconomyofEastJavawouldbeasmuchasRp.3.253.498million,Rp.4.337.997million,andRp.6.506.995millionforeachscenariooftheexchangerateashighasRp.7500/US, respectively for the scenario of dynamic growth. The total impact of the project to the provincial economy of East Java would be as much as Rp. 3.253.498 million, Rp. 4.337.997 million, and Rp. 6.506.995 million for each scenario of the exchange rate as high as Rp.7500/US, Rp.10000/US,Rp.15000/US, Rp.15000/US, respectively under the former scenario. Cumulative direct impact since pre-construction to construction period had been calculated as much as US$ 101,8 million for sectors number 48, 52, and 62. This have brought much impact on other sectors in national or provincial levels of economy. Keywords: Economic impact, nuclear power plant construction, input-output

    STRATEGI OPTIMALISASI MANAJEMEN OUTAGE PLTN : DESKRIPSI UMUM

    No full text
    ABSTRAK STRATEGI OPTIMALISASI MANAJEMEN OUTAGE PLTN: DESKRIPSI UMUM. Optimalisasi manajemen outage merupakan faktor penting untuk menekan biaya operasional pembangkit listrik tenaga nuklir (PLTN). Selain itu, optimalisasi manjemen outage antara lain bertujuan untuk meminimalisir durasi outage, meningkatkan kehandalan kinerja dan keselamatan PLTN. Manajemen outage terdiri atas 3 tahap, yaitu, perencanaan, eksekusi, dan review setelah outage. Beberapa aspek yang perlu diperhatikan dalam tahap perencanaan antara lain, keselamatan dari bahaya nuklir selama dan setelah proses outage, kebijakan manajemen dan personil, pemeliharaan dan inspeksi, umpan balik dari pengalaman outage sebelumnya, dan aspek ekonomi yang berhubungan dengan proses outage. Setiap tahap dalam manajemen outage membutuhkan pemantauan kontinu agar optimalisasi outage dapat terwujud. Dengan menerapkan strategi manajemen outage yang baik, kinerja PLTN semakin meningkat dengan nilai faktor beban yang semakin besar mencapai 93% dan faktor ketidaktersediaan energi hilang tidak terencana kurang dari 2%. Kata kunci: PLTN, outage, perawatan dan inspeksi.   ABSTRACT NUCLEAR POWER PLANT OUTAGE MANAGEMENT OPTIMIZATION STRATEGY: GENERAL DESCRIPTION. Outage optimization is an important factor to reduce the NPP operational cost. Goals of outage optimization strategy are to minimize outage duration, and increase the performance and safety performance of the NPP. Outage management depends on three main phase preparation and planning, execution, and post outage review. The key issues in outage planning are nuclear safety; management and personnel policy; maintenance and inspection; outage experience feedback; and all economic aspects that relate to the outage process. Continuity control is required in each phase of outage management in order to reach the goal of outage optimization. By implementing a good outage planning strategy, NPP has increased steadily reaching 93% load factor and less than 2% for unplanned energy unavailability. Keywords: Nuclear Power Plant, outage, maintenance & inspection

    STUDI AWAL PLTN DI SUMATERA

    No full text
    ABSTRAK STUDI AWAL PLTN DI SUMATERA. Saat ini pertumbuhan permintaan kapasitas daya listrik di wilayah Sumatera sekitar 11.3% per tahun. Dengan kondisi sistem kelistrikan saat ini menyebabkan pemadaman listrik secara bergilir yang hampir teijadi setiap hari di seluruh wilayah. Penambahan kapasitas dengan pembangkit berskala kecil, pertumbuhan permintaan di wilayah ini sulit terpenuhi. Sedangkan fasilitas pembangkitan yang selama ini menggunakan bahan bakar minyak sudah tidak layak dioperasikan karena menimbulkan beban subsidi yang sangat tinggi. Dengan kondisi demikian di masa mendatang Pulau Sumatra membutuhkan kapasitas tambahan dalam unit-unit berskala besar yang peluang terbesar dimungkin dengan PLTN. Kata kunci: Kondisi kelistrikan Sumatera, defisit daya, PLTN di Sumatera.   ABSTRACT In this time demand growth of electricity generation capacities on Sumatra region is about 11.3% per year. That condition cause power off by have innings which almost happened every day in all region. Addition of capacities with small scale generating, the demand growth in this region is difficult to meet. While generating facilities which until now use oil fuel have is not feasible to operate because the generating cause very high subsidy burden. With that way condition of Sumatra Island additional demand of capacities in large scale units which is possible biggest opportunity by Nuclear Power Plants (NPP) in the next period. Keywords: Electricity condition of Sumatra, power deficit, NPP in Sumatra

    KONSEP ZONASI KAWASAN PLTN MURIA

    No full text
    ABSTRAK KONSEP ZONASI KAWASAN PLTN MURIA. Rencana pembangunan PLTN di tapak Ujung Lamahabang, Desa Balong, Kecamatan Kembang, Kabupaten Jepara harus terintegrasi dengan Rencana Pembangunan Wilayah di Kabupaten Jepara dan Provinsi Jawa Tengah, karena terletak di Wilayah Kabupaten Jepara. Rencana Tataruang Wilayah (RTRW) Jepara merupakan rencana induk pembangunan di wilayah Jepara dan akan menjadi acuan bagi semua pelaksanaan pembangunan dan pengembangan wilayah di Kabupaten Jepara, termasuk rencana Pembangunan PLTN. Dalam perencanaan tataruang PLTN, aspek keselamatan masyarakat dan lingkungan menjadi pertimbangan utama. Kondisi operasi normal maupun kecelakaan (yang dipostulasikan) harus tetap memberikan jaminan keselamatan masyarakat dari bahaya radiasi pengion. Jika teijadi keadaan darurat maka konsep tataruang tetap menjamin keselamatan masyarakat, dengan memperhitungkan faktor populasi, geografi dan tata ruang yang memudahkan tindakan pasca kecelakaan, seperti sheltering, evakuasi, pemberian tablet yodium stabil, dekontaminasi, pelarangan mengkonsumsi bahan pangan lokal, dan relokasi. Zonasi adalah metode yang tepat untuk memberikan jaminan keselamatan. Metode yang dipakai dalam penelitian ini menggunakan analisis keselamatan dengan pendekatan spasial. Zona eksklusi akan direkomendasikan beijarak 1 km dari reaktor nuklir, sedangkan zona penduduk rendah direkomendasikan berjarak 3,5 km dari reaktor nuklir. Kata kuncl: zonasi, rencana tataruang, kawasan PLTN, keselamatan, bahaya eksternal.   ABSTRACT ZONING CONCEPT OF THE MURIA NPP AREA. NPP development planning at Ujung Lemahabang site, Balong Village, Kemang District, Jepara Regency should be integrated with the regional development planning of Jepara Regency and Jawa Tengah Province due to the site is belong to the regency area. Regional Spatial Development Planning (RTRW) of Jepara is a master plan of Jepara regional development planning and it will be as a reference for all development implementation in Jepara Regency, including the NPP planning. In the NPP Development planning, public and environmental safety aspect are the major consideration that they should be accomodated. Both of normal operation and postulated accident case should ensure public safety against ionizing radiation hazard. If there will be an emergency situation, the spatial concept should ensure public safety considering population factor, geography, and spatial condition that will be able to make emergency countermeasure after the accident such as sheltering, evacuation, iodine stable distribution, decontamination, food bans, and relocation. Zoning is the appropriate concept to give safety assurancy. The method to be used in the research is safety analysis using spatial approach. Exclusion zone will be recommended inside the ring of 1 km from nuclear reactor, while the low population zone will be recommended at 3,5 km radius from nuclear reactor. Keywords: Zoning, spatial planning, NPP area, safety, external events

    KAJIAN PEMANFAATAN PLTN SMART UNTUK KAWASAN BARELANG

    No full text
    ABSTRAK KAJIAN PEMANFAATAN PLTN SMART UNTUK KAWASAN BARELANG. Makalah ini mengkaji kelayakan pemanfaatan reaktor SMART (Small innovative Modular Advanced Reactor) di kawasan BARELANG. Kawasan ini merupakan kawasan yang dikembangkan untuk kawasan industri yang terletak di Provinsi Kepulauan Riau. Permasalahan utama yang timbul di daerah ini adalah kebutuhan energi listrik dan air bersih baik untuk keperluan industri maupun kebutuhan penduduk. Sampai saat ini, Perusahaan Listrik Negara (PLN) belum mampu mensuplai kebutuhan energi listrik yang dibutuhkan pelaku industri. Seluruh pembangkit listrik masih menggunakan minyak sebagai sumber pembangkit sehingga biaya pembangkitan menjadi sangat mahal. Air bersih yang diproduksi oleh PDAM bersumber dari waduk yang khusus dibangun untuk menampung air hujan di saat musim hujan karena tidak ada sumber air yang lain, sehingga pada musim kemarau akan menimbulkan kekurangan pasokan. Reaktor SMART merupakan reaktor modular berpendingin air ringan yang dikembangkan oleh KAERI (Korea Atomic Energy Research Institute). Reaktor ini khususnya dikembangkan untuk tujuan ganda, yaitu untuk produksi listrik dan air bersih. Total daya termal yang dihasilkan sebesar 330 MWth dengan efisiensi 33 %. Sebanyak 90 MWe dihubungkan ke jaringan listrik dan sisanya digunakan untuk memproduksi air minum dengan kapasitas 40.000 m3/hari. Jika dibandingkan dengan jenis PLTN konvensional, reaktor ini didasarkan pada prinsip-prinsip operasi dan perbaikan yang sangat sederhana, keselamatan tinggi, mudah diinspeksi, waktu pembangunan relatif pendek, biaya investasi kecil, biaya pembangkitan sangat kompetitif, dan mudah disesuaikan dengan infrastruktur yang ada. Karakteristik utama SMART adalah konsep reaktor integral, dimana semua komponen-komponen utama sistem pendingin reaktor berada di dalam bejana tekan. Kata kunci: SMART, listrik, air, BARELANG.   ABSTRACT ASSESSMENT OF SMART REACTOR UTILIZATION FOR BARELANG REGION. This paper assesses the feasibility of SMART reactor utilization in BARELANG region. BARELANG region is an industrial area located in Riau Islands Province. The need of electricity and fresh water, whether for industry growth or people, are the main problem of this region. Until now, the National Electricity Company (PLN) has not able to supply the electricity needed by industrial sector. The use of oil as a main electricity generation resource of the entire power plant has caused a tremendous generation cost. On dry seasons, the fresh water supplied by PDAM is reducing drastically. This situation occurs because water source of PDAM extremely depends on the water storage during rainy seasons. SMART reactor is a modular light reactor developed by KAERI for dual purposes, producing electricity and fresh water at the same time. The total thermal power generated by this type of reactor is about 330 MWth with 33 % efficiency, as 90 MWe connected to the electricity grid and rest is used in producing potable water with capacity 40.000 m3/day. Compare to the conventional reactor, SMART reactor is based on simple operation and maintenance principles, enhanced safety, easy to inspect, a relatively short construction time, small investment cost, competitive generation cost, and a flexible design to fit with the existing infrastructure. The main characteristic of SMART reactor is an integral design concept where the entire main cooling system components are located in the pressurize vessel. Keywords: SMART, electricity, water, BARELANG

    KONTRIBUSI JALUR PAPARAN TERHADAP DOSIS RADIASI PADA KONDISI OPERASI NORMAL PLTN 2 x 1000 MWe

    Full text link
    ABSTRAK Kontribusi Jalur Paparan Terhadap Dosis Radiasi Untuk Operasi Normal PLTN 2 x 1000 MWe. Rencana Pembangunan PLTN di calon Tapak PLTN Ujung Lemahabang diprakirakan akan menimbuikan dampak kepada masyarakat berupa paparan radiasi, baik internal maupun eksternal. Dalam pengoperasian secara normal, PLTN akan mengemisikan ke udara sebagian kecii gas dan partikulat yang bersifat radioaktif. Jalur paparan utama ke manusia adalah melaiui inhalasi, resuspensi, cloudshine, groundshine dan ingesti. Metode yang dipakai dalam penelitian ini dengan menggunakan metode komputasi paket program PC CREAM. Masukan data yang digunakan mencakup data meteorologi, kependudukan, pertanian dan peternakan tapak PLTN Ujung Lemahabang. Hasii penelitian menunjukkan yang paling dominan memberikan kontribusi dosis dengan kondisi operasi normal PLTN dalam jangka waktu satu tahun pertama adalah melalui jalur awan gamma dan beta, kedua melalui jalur ingesti dan ketiga melalui jalur inhalasi. Untuk jaiur resuspensi dan paparan permukaan tanah tidak menyumbang dosis yang signifikan. Pada jarak 3 km dari tapak (di mana terdapat permukiman) dosis inhalasi, awan gamma dan beta, ingesti dan dosis total yang diintegrasikan selama 1 (satu) tahun secara berurutan adalah 6,5 iliSv, 380 |iSv, 19,2 jiSv, dan 407 jiSv.   ABSTRACT Pathways Contribution to Radiation Dose for Normal Operation of NPP 2 x 1000 MWe. NPP project at Ujung Lemahabang site is predicted will affect to population of both internal and external radiation exposure. In normal operation condition, NPP will release a little amount of radioactive gases and particulates to atmosphere. Main pathways of radionuclides to the human body are inhalation, cloud shine, ground shine and ingestion. Method used in the research is computation using PC CREAM program package. Data input used a specific data of ULA NPP Site, including meteorology, demography distribution, farm production, and livestock production. The result of the research shows that gamma and beta cloud shine pathways will be the largest contributing of the total dose for a normal operation condition of NPP as long as 1 year duration. The second and lastly is ingestion and inhalation pathway, respectively. While resuspension and groundside contribute the total dose are not insignificantly. At 3 km distance from the site (where the residential is existing) the inhalation, cloud gamma and beta, ingestion and total doses integrated to 1 (one) year are 6,5 pSv, 376 pSv, 19,2|iSv, and 407 |iSv respectively. Kata kunci: jalur paparan, committed dose, model dispersi, atmosfer, radiasi eksternal, plume, elektron, operas! normal, PC CREA

    STUDI POTENSI PENINGKATAN PAPARAN UNSUR RADIOAKTIF ALAM AKIBAT PEMBAKARAN BATUBARA

    Full text link
    ABSTRAK STUDI POTENSI PENINGKATAN PAPARAN UNSUR RADIOAKTIF ALAM AKIBAT PEMBAKARAN BATUBARA. Studi ini merupakan hasil kajian yang memberikan gambaran potensi masalah secara umum mengenai limbah radioaktif alam hasil pembakaran batubara. Pada kenyataannya pembakaran batubara adalah merupakan satu sumber paparan radiasi yang disebut konsentrat radioaktif alam (TENORM) karena batubara merupakan material bumi yang mengandung konsentrasi rendah Uranium-238, Thorium-232, dan anak luruhnya serta Kalium-40. Pencemaran radioaktif alam tersebut akan tersebar di lingkungan dan berpotensi meningkatkan paparan radiasi. Tingkat kontaminasi radionuklida terhadap lingkungan tergantung asal usul batubara tersebut.   ABSTRACT THE STUDI OF POTENTIALLY INCREASING THE NATURALLY OCCURING RADIOACTIVE EXPOSURE FROM THE COAL COMBUSTION. This paper is the result of assessment will discuss potential issues of coal combustion results. The fact that coal combustion throughout the world are the major sources of radioactive materials released to the environment has several implications. It's an actual fact that burning of coal is one source of radiation exposure to naturally occurring radioactive materials (TENORM) wastes because coal as most earth materials contains low concentrations of Uranium-238, Thorium-232 and their radioactive progeny and Kalium-40. The degree of radionuclide contamination of the environment depends on the original matter of coal seams

    EFEK KENAIKAN HARGA BAHAN BAKAR TERHADAP BIAYA PEMBANGKITAN LISTRIK

    Full text link
    ABSTRAK EFEK KENAIKAN HARGA BAHAN BAKAR TERHADAP BIAYA PEMBANGKITAN LISTRIK. Kontribusi harga daur bahan bakar nuklir terhadap total biaya pembangkitan listrik pada PLTN relatif kecil sekitar 15-30%, dibanding PLTU berbahan bakar batubara (40-60%) maupun PLTU berbahan bakar minyak/gas (70-80%). Kondisi ini akan memberi efek biaya pembangkitan listrik yang lebih stabil terhadap fluktuasi kenaikan harga bahan bakar. Dari studi ini terlihat bahwa jika diasumsikan terjadi kenaikkan harga uranium alam sebesar 100% akan mengakibatkan kenaikan harga daur bahan bakar nuklir sebesar 29%. Karena kontribusi harga uranium alam terhadap total harga daur bahan bakar nuklir adalah sekitar 29%, dan kontribusi harga daur bahan bakar nuklir terhadap total biaya pembangkit listrik relatif kecil (15-30%), kenaikan harga uranium alam sebesar 100% akan mengakibatkan naiknya biaya pembangkitan listrik hanya sekitar 4-8%. Pada pembangkit listrik berbahan bakar fosil, jika diasumsikan terjadi kenaikan harga bahan bakar sebesar 100% akan mengakibatkan naiknya biaya pembangkitan listrik sebesar 40-65% pada PLTU batubara, dan sebesar 70-85% untuk PLT minyak bumi/gas. Kata kunci: bahan bakar fosil, uranium alam, daur bahan bakar   ABSTRACT THE EFFECT OF FUEL COST INCREASING TO THE ELECTRICITY GENERATING COST. The contribution of the nuclear fuel cycle cost to the total of nuclear power generating cost is relatively small, about 15-30%, compared to the contribution of the fuel cost in the coal-generated electricity (40-60%), or in the gas/oil-generated electricity (70-80%). This condition will give the effect that once a nuclear power plant is built, the future generation cost are much less sensitive to the change in the fuel prices fhan in the case of fossil fuel power plants. The study shown that if assumed the natural uranium price were double, the total nuclear fuel cycle cost would increase by about 29%. Because the contribution of the natural uranium price to the total nuclear fuel cycle cost is about 29%, and the contribution of the nuclear fuel cycle cost to the nuclear generation cost is relatively small, the assumed of 100% increase of natural uranium price would increase nuclear electricity generating cost by only about 4-8%. As a comparison, if assumed a 100% increase in fossil fuel prices would increase the electricity generating cost by about 40-65% for coal-pwer plants, and about 70-85% for oil/gas-power plants. Keywords: fossil fuel, natural uranium, fuel cycl

    224

    full texts

    349

    metadata records
    Updated in last 30 days.
    Jurnal Pengembangan Energi Nuklir
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇