Publikationsserver der Fachhochschule Potsdam
Not a member yet
2719 research outputs found
Sort by
Steel Roofs for a Sport Complex
The new Velodrome is directly connected to a station on the city's rail transit system, the S-Bahn. Next to it, the new Swim Sport Stadium and two additional facilities create an exceptional venue for national and international sporting events. The Velodrome has a capacity of 10,000 seats, of which 6,000 are permanently installed. The Swim Sport Stadium has a central pool with a volume of 50 x 25 x 3 m and a pool for diving competitions with a volume of 21 x 25 x 5 m. The basic idea of the architect was to imbed the two large sport halls into the ground in an urban park planted with 500 apple trees, so that their roofs will look like lakes in a forest
Welche Werte erwartet die Generation Y vom Arbeitgeber? (Teil 1)
Das Thema Nachwuchskräfte beschäftigt zunehmend die Bauwirtschaft. Bereits seit Jahren ist absehbar, dass sich die Stellensituation für die Absolventen im Bereich Bauingenieurwesen positiv darstellt und in den kommenden Jahren auch weiterhin darstellen wird. Doch was ist neben guten Berufs- und Karriereaussichten im Berufsleben wichtig für die künftigen Mitarbeiter und Kollegen der sogenannten Generation Y
Entwicklung und Erprobung einer Betonrezeptur für einen hochfesten Stahlfaserbeton zur Überprüfung der Eignung für die Entwicklung von Beton-Fertigteil-Konstruktionen mit verbundloser Vorspannung ohne zusätzlichen Betonstahl
Abschlussbericht zum Forschungsprojekt ; gefördert im Rahmen des BMBF-Programms zur Förderung der anwendungsorientierten Forschung und Entwicklung an Fachhochschulen, aFuE ; Laufzeit: 1. Sept. 2000 bis 28. Feb. 200
Reinigung von MKW und BTEX belastetem Grundwasser in bewachsenen Bodenfiltern
Zeitraum: 1. 09/02 - 02/04 BMBF gefördert, 2. 03/04 - 12/0