Informes de la Construcción (E-Journal)
Not a member yet
    5825 research outputs found

    Desarrollo de proyecto progresivo de vivienda de interés social con sistemas tradicionales e industrializados

    Get PDF
    On taking up the development of an architectural project for mass housing, «Proyectos y Construcciones G.E.G. considers that, in the present state of development of the building industry in Colombia and its financial situation, the most convenient thing to do would be to continue using traditional materials and systems, to which would be applied those pertaining to research, planning and organization which are characteristic of any industry enjoying high output, but which are considered by us to be foreign to traditional construction.Al afrontar el desarrollo de un proyecto arquitectónico para vivienda masiva, Proyectos y Construcciones G.E.G. considera que en el estado actual de desarrollo de la industria de la construcción en Colombia y su situación económica, lo más conveniente es continuar usando materiales y sistemas tradicionales, aplicándoles los de estudios, planeación y organización que son propios de cualquier industria de alta productividad, pero que entre nosotros se consideran ajenos a la construcción tradicional

    Editorial

    No full text

    Respuesta de la madera ante el fuego en la construcción

    Get PDF
    Not available.El presente artículo pretende dar una amplia visión del material madera y de los elementos que la utilizan como materia prima (tableros, puertas, etc.), cuando se encuentran sometidos a la acción del fuego. Se hace un análisis partiendo de la base de realización de ensayos a partir de la Normativa española al respecto, considerando las especies más frecuentemente empleadas en nuestro país, y abarcando los aspectos de duración cortafuegos, estabilidad mecánica sin deformación y estanquidad a las llamas, sin olvidar la emisión de gases inflamables y clasificación frente al fuego. A través de la experiencia que el Laboratorio del Fuego del INIA posee, y que se exponen en esta colaboración, se pueden extraer consecuencias que permitan la utilización de la madera en construcción de una forma más lógica, eliminando algunos prejuicios que existen sobre su naturaleza y comportamiento frente al fuego

    Noticias

    Get PDF

    Noticias

    Get PDF

    La cúpula de Santa María del Fiore

    Get PDF
    The construction of the dome of Santa María del Fiore involved solving the following two problems: first of all, to find a solution in which the horizontal thrusts did not exceed the capacity of the thin edge of the dome constructed. Secondly, the construction had to be carried out without centrings. Brunelleschi found an answer to both problems. He combined vertical Gothic style arches with horizontal ones, thus creating a veritable network of arches. The experience of the Middle Ages had made it clear to him that ogival arches transmit less horizontal thrusts than do half arches. He found the solution for the construction without centrings by studying Roman domes and in particular the Pantheon.La construcción de la Cúpula de Santa María del Flore suponía resolver los dos problemas siguientes: Por un lado, encontrar una solución en que los empujes horizontales no superaran la capacidad del esbelto cimborrio construido. Por otro, la construcción debía hacerse sin cimbra. Brunelleschi encontró respuesta para ambos problemas. Combinó arcos verticales al estilo gótico con otros horizontales, constituyendo un auténtico entramado espacial. La experiencia medieval le había puesto de manifiesto que el arco ojival transmite menores empujes horizontales que los de medio punto. La solución de la construcción sin cimbra la encontró reflexionando sobre las cúpulas romanas y, en particular, sobre el Panteón

    Editorial

    Get PDF

    Editorial

    Get PDF

    Conservación de fachadas en diversos lugares de Madrid/España

    Get PDF
    As complement to the Main Subject this section presents four works which select some of the most recent facts about the emptying of buildings preserving their frontage. This subject is more and more frequent because of the multiplicity of the recent ordinances tending towards the preservation of the historical and artistic patrimony of our towns, and of great complexity because of the specificity of each case. The whole of those four works intend to reflect some of the most common problems in this dink of project and their correct solution. The first correspond to a building of three floors with a semi basement that, after being emptied and rebuilt, a new body off our floors is added using completely different methods according to the municipal council ordinances. The second work includes two buildings of a very different use (an ice factory and its offices) constructed in consecutive periods and with different constructive treatments which obliges to search a diverse solution for each body. The third project is an action taken by the City Council of Madrid, who acted by substitutive execution considering the high danger of ruin of the building and the passiveness of its owners. The last work is a house-building on a ground plan shaped as an L, with six levels on top of the basement.Como complemento del Tema de Fondo se presentan en esta sección cuatro obras que recogen algunas de las realizaciones más recientes en esta materia del vaciado de edificios conservando la fachada, tema cada vez más frecuente por la multitud de recientes disposiciones tendentes a conservar el patrimonio histórico-artístico de nuestras ciudades, y de gran complejidad por la especificidad de cada uno de los casos. Con el conjunto de las cuatro obras se pretende reflejar algunos de los problemas que más comúnmente se presentan en este tipo de proyectos, y sus correctas soluciones. La primera corresponde a un edificio de dos plantas con semisótano que, después de vaciado y reconstruido, se suplementa con otro cuerpo de cuatro alturas, de tratamiento totalmente distinto por disposiciones municipales. La segunda obra está compuesta por dos edificios de uso muy distinto (fábrica de hielo y sus oficinas), realizados en épocas sucesivas y con diferente tratamiento constructivo, lo que ha obligado a soluciones distintas para cada cuerpo. El tercer proyecto es una acción del ayuntamiento de Madrid, que actuó por ejecución sustitutoria dado el avanzado peligro de ruina de la edificación y la pasividad de la propiedad. La última obra es un edificio de viviendas configurado en planta como una L, compuesto por 6 alturas sobre rasante y un sótano

    Bibliografía

    Get PDF

    4,188

    full texts

    5,825

    metadata records
    Updated in last 30 days.
    Informes de la Construcción (E-Journal)
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇