39 research outputs found
PeriscOApe ULiège 2018-2020 Data1
This dataset contains enriched metadata of journal articles published between 2018 and 2020 and for which at least one (co)author is affiliated with the University of Liège.
Data was aggregated and enriched from various sources, incuding OpenAlex and the University of Liège's institutional repository (ORBi). Particular data is then used to create visualizations on the PeriscOApe platform, a website that seeks to monitor the development and various types of Open Acess in the Wallonia-Brussels Federation
ANALISIS HARGA POKOK PRODUKSI DENGAN MENGGUNAKAN ACTIVITY BASED COSTING SYSTEM PADA CV TELAGA KENCANA PALEMBANG
Analysis of Cost of Production by Using Activity Based Costing System At CV Telaga Kencana Palembang
M Dony Julio Pratama, 2016 (xv + 75 page)
Email :[email protected]
CV Telaga Kencana Palembang is one of the companies engaged in the timber industry. The company addresses in Jl. K.H.A. Azhari 55, Palembang. The author uses several methods to get data from companies such as observation, interviews, and literature. The analysis of object in this final report is a calculation of the cost of production by using Activity Based Costing. Based on the data that author get that report the cost of production of products two doors dresser, oshin tables, and Taulet Palembang in 2015, the authors found some problems, such as cost of raw materials and factory overhead costs is not taken away, and the cost of depreciation of fixed assets is not taken into account in determining the cost of production so that the cost of production by companies is greater than the cost of production according to the Activity Based Costing. The problem faced by the company can be examined by identifying and classifying charges based on the activities undertaken in connection with the production process. To overcome existing problems, the author tries to give some suggestions that might be beneficial for the company, among other companies should use Activity Based Costing in the calculation of production costs
OPTIMALISASI PELAKSANAAN BONGKAR MUAT OIL PRODUCT DI MT. PATRA TANKER 3
Fandhy Dony Wicaksono, 2017, 49124381 N, “ Optimalisasi Pelaksanaan Bongkar Muat Oil Product di MT. Patra Tanker 3 ”, Diploma IV , Nautika, Politeknik Ilmu Pelayaran Semarang, Counselour : (I) Sahabuddin Sunusi (II) Yustina Sapan.
Oil production rising rapidly from oil fields, refineries and depots - oil depot in Indonesia. It makes participation of oil tankers becomes more vital than ever. Loading and discharging equipment on the tanker must always be in good condition in order to support the process of loading and discharging. Optimization of loading and discharging must be supported by good communication between the ship at the loading or discharging port. This research is focused on the process of loading and discharging at MT. Patra Tanker 3 which is frequently delays due to human factors and factors of equipment and efforts to optimize the loading and discharging activities. The research methodology that author use is a descriptive qualitative method. The author presents the data according to the results of the observation as authors did the sea project, interviews with the officers of MT. Patra Tanker 3 and literature study that the author obtained from books, internet and literature relating to loading and discharging process of oil product. Based on the research that the author carried out, it can be seen that the constraints that occur when loading and discharging process in MT. Patra Tanker 3 are the lack of understanding, knowledge and awareness of the crew about the dangers and how the loading and unloading procedures in accordance with the standards as well as safe. In addition the process of loading and discharging at MT. Patra Tanker 3 are constrained by a cargo pump is not functioning optimally. From these problems, it’s necessary to give the entire crew training regarding the loading and discharging process in accordance with the procedures and also the operation of loading and discharging equipment is right and how to taking care of the loading and discharging equipment. Besides, the ship’s crew also had to check periodically for loading and discharging equipment.
Keywords : Oil Product, Loading, Discharging, descriptive qualitative
ALTERNATIF POLA HUBUNGAN KOTA TEGAL DALAM KONTEKS KAWASAN BREGAS
Kawasan Bregas (Kota Brebes, Tegal, dan Slawi) adalah sebuah kawasan
yang diharapkan memiliki pertumbuhan yang pesat dalam kawasan regional Jawa
Tengah. Pertumbuhan yang pesat tersebut dapat dicapai apabila kawasan ini
mampu mengelola potensi-potensi yang dimiliki dan mengatasi permasalahan
yang akan dihadapi. Dalam perkembangannya, kota-kota yang termasuk dalam
Kawasan Bregas cenderung mengalami proses aglomerasi yang disebabkan oleh
hubungan aktivitas manusia yang dilakukan didalamnya
Inflation targeting and the changing transmission mechanism of monetary policy in India
We examine shifts in the conduct of monetary policy in India, before and after the adoption of inflation targeting (IT), while also accounting for the impact of COVID-19. Unlike existing studies that pre-date COVID-19, we employ a unified framework using a time-varying BVAR model with data spanning 1998 to 2024. We find that, prior to IT, contractionary monetary policy had a limited impact on inflation with presence of a price puzzle. In contrast, the IT period exhibits improved monetary policy transmission, with policy shocks exerting a stronger influence on inflation with the price puzzle disappearing, reflecting enhanced policy credibility. However, this effect weakens during the COVID-19 years. Interestingly, monetary policy had greater influence on the output gap and exchange rate in the pre-IT period, with diminished effects during IT and COVID-19 period. These findings underscore the effectiveness of inflation targeting in improving the transmission of monetary policy in India, though it shows limitations during COVID-19
Desain Konstruksi Kapal Wisata M.V. Sitoba Berbahan Dasar Fiberglass
Construction can be interpreted as a building or infrastructure unit in one or several areas. In Dony Damara's final assignment with the title Planning for
Tourism Ship Design to Support Tourism on Lake Toba, the author has created a tourist ship design with the name M.V. Sitoba. The previous author has designed the lines plan and general arrangement. The results of this study are to get the modulus calculation of each component on the M.V. Sitoba, Transverse Frame = 17,57 cm³, Side Longitudinal = 21,36 cm³, Side Girder = 20,76 cm³, Tunnel Longitudinal = 18,99 cm³, Bottom Longitudinal = 25,737 cm³, Deck Girder =
13,183 cm³, than obtain the thickness of the fiberglass layer on all sides, and obtain a 3D construction drawings on the M.V. Sitoba tourist ships uses autocad software
with a distance of 0,5 meters for each component
PENAWARAN PEMBAYARAN TUNAI DAN PENITIPAN UANG DALAM PERSELISIHAN HUBUNGAN INDUSTRIAL
As a law state, Indonesia has consequences, that all problems should be
regulated by the law, both criminal and civil aspects, as well as on dispute issues
of industrial Business. Offering of cash payments and custody of money (de
aanbod van Gerede betaling gevolgd door CONSIGNATIE) are the final stage of
the judicial process that uses industrial Business throughout the civil law since it
has been not regulated in Act No. 2 of 2004 on the Settlement of Industrial
Business. In this case, the author has completed successfully the research
components for the final project in the Advocate office of Arqom, Dony & Co.,
who lifted the research title: Offering of Cash Payments and Custody of Payment
Money for Disputes of Industrial Business.
This study was conducted using data from library research, legislation in
force relating to the settlement of industrial Business and the practice of fieldwork
which is conducted in the Advocate office of Arqom, Dony & Co. During the
field work practices, the author helps to do offer cash payment application and
custody of money in the Industrial Business Court of Yogyakarta. In such a case
occurred due to the plaintiff did not heed the court decision which has a fixed
decision (in kracht van gewijsde) to receive a cash payment from the defendant.
Offering of cash payment and custody of money from the defendant to carry court
decision which has a fixed decision. After the bidding process of cash payments
and custody of money are completed then the defendant is free from existing
obligation under the cassation decision No. 225K/Pdt.Sus/2011 which is
reinforced by the decision of a judicial review No. 23PK/Pdt.Sus/2012
PEMETAAN RESEARCH GROUP BERFOKUS CABANG KEILMUAN TEKNIK INDUSTRI MENGGUNAKAN ANALISA CLUSTER DAN TABULASI SILANG
Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui email [email protected], [email protected], [email protected] Terima kasih  Â
Accounting Information System Design Receivable At Santo Borromeus Hospital Bandung Using Software Microsoft Visual Basic.Net And Database Mysql
Financial statements are the Saint Borromeos Hospital is in conformity with the accounting standards Hospitals, but on the billing in the data processing redemption patients are still not integrated with other parts that could result in data input errors that have been generated from one section to another. Based on the above reasons, the authors take the title: "Accounting Information System Design Patient Due Contractor Santo Borromeus Hospital Bandung Using Software Microsoft Visual Basic.Net And Database MySql". Hospital of St. Borromeus is a service company that is engaged in the healthcare field. The author conducted research on the billing. The research design I use is the design of the study with primary and secondary data, the study is a type of academic research, the type of data used is descriptive research method, survey, and explanatory, data collection techniques used are field research and library research, development models system used is output-oriented methodology, process and data. The structure of the development of the system used is the waterfall. The design of the information system used was the context diagrams, data flow diagrams, and flowcharts. The author made a design Receivable Accounting Information Systems are expected in processing patient billing data can be processed by either the contractor so as to facilitate the financial reporting process
Accounting Information System Design Receivable At Santo Borromeus Hospital Bandung Using Software Microsoft Visual Basic.Net And Database Mysql
Financial statements are the Saint Borromeos Hospital is in conformity with the accounting standards Hospitals, but on the billing in the data processing redemption patients are still not integrated with other parts that could result in data input errors that have been generated from one section to another. Based on the above reasons, the authors take the title: "Accounting Information System Design Patient Due Contractor Santo Borromeus Hospital Bandung Using Software Microsoft Visual Basic.Net And Database MySql". Hospital of St. Borromeus is a service company that is engaged in the healthcare field. The author conducted research on the billing. The research design I use is the design of the study with primary and secondary data, the study is a type of academic research, the type of data used is descriptive research method, survey, and explanatory, data collection techniques used are field research and library research, development models system used is output-oriented methodology, process and data. The structure of the development of the system used is the waterfall. The design of the information system used was the context diagrams, data flow diagrams, and flowcharts. The author made a design Receivable Accounting Information Systems are expected in processing patient billing data can be processed by either the contractor so as to facilitate the financial reporting process
