1,720,954 research outputs found

    Analisis Kinerja Perawatan Bulanan (P1,P3,P6) Dipo KRL Depok

    Get PDF
    Monthly Maintenance Depok Commuter Line Dipo is a place of care that forms inspection, preparation, storage, maintenance, and repair of rings counted monthly with regular maintenance, where P1 (maintenance every 1 month), P3 (maintenance every 3 months), and P6 (Treatment every 6 boasts). To support Commuter Line maintenance activities, the availability of spare parts / components, quantity and quality of human resources, work equipment, inspection equipment, location, conditions and supporting facilities are sufficient to facilitate maintenance. In conducting maintenance, Depok Commuter Line Dipo Monthly Maintenance has problems, including lack of maintenance equipment and maintenance personnel in the dipo are still lacking, both in terms of quality and quantity. To overcome this problem the method used is to identify the needs of the facility based on the MI (Maintenance Instructions) as a guide in carrying out maintenance and calculate the needs of employees both in number and quality or competence that must be owned by maintenance personnel. From the results of the analysis of the existing problems it can be concluded that the completeness of maintenance facilities in the form of work equipment is still damaged such as compressors and battery changers, lifting jacks, hydraulic jacks, and monthly manure Dipo KRL Depok still needs 24 additional maintenance personnel, and there are 19 People who have not yet participated in functional training competencies. Therefore, it is necessary to add work equipment facilities and increase human resources, as well as improve the quality and quantity of human resources to improve the performance of Depok Commuter Line Dipo Monthly MaintenancePerawatan Bulanan Dipo KRL Depok adalah tempat perawatan yang membentuk pemeriksaan, persiapan, penyimpanan, pemeliharaan, dan perbaikan cincin dihitung per bulan secara berkala dengan pemeliharaan rutin, di mana P1 (perawatan setiap 1 bulan), P3 (perawatan setiap 3 bulan), dan P6 (Perawatan setiap 6 membanggakan). Untuk mendukung kegiatan pemeliharaan KRL, ketersediaan suku cadang / komponen, jumlah dan kualitas sumber daya manusia, peralatan kerja, peralatan pemeriksaan, lokasi, kondisi dan fasilitas pendukung cukup untuk memfasilitasi pemeliharaan. Dalam melakukan perawatan, Perawatan Bulanan Dipo KRL Depok memiliki masalah, termasuk peralatan peralatan pemeliharaan masih kurang dan personil pemeliharaan di dipo masih kurang, baik dari segi kualitas dan kuantitas. Untuk mengatasi masalah ini metode yang digunakan adalah mengidentifikasi kebutuhan fasilitas berdasarkan MI (Instruksi Perawatan) sebagai panduan dalam melakukan pemeliharaan dan menghitung kebutuhan karyawan baik jumlah dan kualitas atau kompetensi yang harus dimiliki oleh personil pemeliharaan. Dari hasil analisis terhadap masalah yang ada dapat disimpulkan bahwa kelengkapan fasilitas perawatan berupa peralatan kerja masih ada yang rusak seperti kompresor dan baterai changer, lifting jack, dongkrak hidrolik, dan bulanan pupuk kandang Dipo KRL Depok masih perlu tambahan 24 personil pemeliharaan, dan ada 19 Orang yang belum mengikuti kompetensi pelatihan fungsional. Oleh karena itu, perlu menambah fasilitas peralatan kerja dan penambahan sumber daya manusia, serta meningkatkan kualitas dan kuantitas sumber daya manusia untuk meningkatkan kinerja Perawatan Bulanan Dipo KRL Depo

    Pengoptimalan Perawatan Kereta Untuk Meminimalkan Keterlambatan Perawatan Di Balai Yasa Manggarai

    Get PDF
    Balai Yasa Manggarai is a place to conduct periodic maintenance of railroad facilities. The train maintenance program at Balai Yasa Manggarai in the first quarter of 2017 every month maintenance occurs late in maintenance. To follow up on this problem, an analysis of maintenance support components is seen in terms of Human Resources, Maintenance Equipment, and Maintenance Facilities. Based on the analysis that has been done, it can be concluded that the needs of employees are in accordance with working hours but the competence of personnel does not meet the qualifications indicated by many who do not yet have a Certificate of Maintenance Expertise, there are many equipment that already have old age and maintenance facilities such as underpasses are not suitable because there are standing water that can interfere with the maintenance of the train. Based on the results of the analysis, it is hoped that train infrastructure operators will immediately implement competency enhancements for maintenance personnel, equipment and maintenance facilities in an effort to optimize train maintenance to minimize maintenance delays at Balai Yasa ManggaraiBalai Yasa Manggarai adalah tempat untuk melakukan pemeliharaan berkala fasilitas kereta api. Program pemeliharaan kereta di Balai Yasa Manggarai pada kuartal pertama 2017 setiap bulan perawatan terjadi terlambat dalam perawatan. Untuk menindaklanjuti masalah ini, analisis komponen dukungan pemeliharaan terlihat dalam hal Sumber Daya Manusia, Peralatan Perawatan, dan Fasilitas Perawatan. Berdasarkan analisis yang telah dilakukan, dapat disimpulkan bahwa kebutuhan karyawan sudah sesuai dengan jam kerja tetapi kompetensi personel belum memenuhi kualifikasi yang ditandai oleh masih banyak yang belum memiliki Certificate of Maintenance Expertise, ada banyak peralatan yang sudah memiliki usia tua dan fasilitas perawatan seperti underpass tidak cocok karena ada genangan air yang dapat mengganggu pelaksanaan pemeliharaan kereta. Berdasarkan hasil analisis, diharapkan operator infrastruktur kereta api akan segera melaksanakan peningkatan kompetensi untuk personil pemeliharaan, peralatan dan fasilitas pemeliharaan sebagai upaya untuk mengoptimalkan perawatan kereta untuk meminimalkan keterlambatan perawatan di Balai Yasa Manggara

    Going Beyond Counting First Authors in Author Co-citation Analysis

    Get PDF
    The present study examines one of the fundamental aspects of author co-citation analysis (ACA) - the way co-citation counts are defined. Co-citation counting provides the data on which all subsequent statistical analyses and mappings are based, and we compare ACA results based on two different types of co-citation counting - the traditional type that only counts the first one among a cited work's authors on the one hand and a non-traditional type that takes into account the first 5 authors of a cited work on the other hand. Results indicate that the picture produced through this non-traditional author co-citation counting contains more coherent author groups and is therefore considerably clearer. However, this picture represents fewer specialties in the research field being studied than that produced through the traditional first-author co-citation counting when the same number of top-ranked authors is selected and analyzed. Reasons for these effects are discussed

    Variations on the Author

    Get PDF
    “Variations on the Author” discusses two of Eduardo Coutinho’s recent films (Um Dia na Vida, from 2010, and Últimas Conversas, posthumously released in 2015) and their contribution to the general question of documentary authorship. The director’s filmography is characterized by a consistent yet self-effacing form of authorial self-inscription: Coutinho often features as an interviewer that rather than express opinions propels discourses; an interviewer that is good at listening. This mode of self-inscription characterizes him as an author who is not expressive but who is nonetheless markedly present on the screen. In Um Dia na Vida, however, Coutinho is completely absent form the image, while Últimas Conversas, on the contrary, includes a confessional prologue that moves the director from the margins to the center of his films. This article examines the ways in which these works stand out in the filmography of a director who offers new insights into the notion of cinematic authorship

    Appropriate Similarity Measures for Author Cocitation Analysis

    Get PDF
    We provide a number of new insights into the methodological discussion about author cocitation analysis. We first argue that the use of the Pearson correlation for measuring the similarity between authors’ cocitation profiles is not very satisfactory. We then discuss what kind of similarity measures may be used as an alternative to the Pearson correlation. We consider three similarity measures in particular. One is the well-known cosine. The other two similarity measures have not been used before in the bibliometric literature. Finally, we show by means of an example that our findings have a high practical relevance.information science;Pearson correlation;cosine;similarity measure;author cocitation analysis

    Dispelling the Myths Behind First-author Citation Counts

    Get PDF
    We conducted a full-scale evaluative citation analysis study of scholars in the XML research field to explore just how different from each other author rankings resulting from different citation counting methods actually are, and to demonstrate the capability of emerging data and tools on the Web in supporting more realistic citation counting methods. Our results contest some common arguments for the continued use of first-author citation counts in the evaluation of scholars, such as high correlations between author rankings by first-author citation counts and other citation counting methods, and high costs of using more realistic citation counting methods that are not well-supported by the ISI databases. It is argued that increasingly available digital full text research papers make it possible for citation analysis studies to go beyond what the ISI databases have directly supported and to employ more sophisticated methods

    Author Index

    No full text
    Nao informado

    koamabayili/VECTRON-author-checklist: VECTRON author checklist

    No full text
    We have done our best to complete the author checklist relating to the use of animals in the hut study. Note that the objective for the hut study was to evaluate the IRS treatment applications for residual efficacy against Anopheles mosquitoes, including the local An. coluzzii mosquito population. Cows were only used to attract mosquitoes into the huts and no tests were carried out directly on the cows. The author checklist is intended for use with studies where experiments are carried out on animals, which is why we have had such difficulty in completing this for the hut study, as many of the questions do not relate to how the cows were used
    corecore