14 research outputs found
Study of the Powerful Nd:YLF Laser Amplifiers for the CTF3 Photoinjectors
A high-power neodymium-doped yttrium lithium fluoride (Nd:YLF) mode-locked 1.5-GHz laser currently used to drive the two photoinjectors of the Compact Linear Collider Test Facility project at the European Organization for Nuclear Research is described. A phenomenological characterization of the two powerful Nd:YLF amplifiers is presented and compared with the measurements. The laser system operates in a saturated steady-state mode. This mode provides good shot-to-shot stability with pulse train mean power in the 10 kW range
Fast phase switching within the bunch train of the PHIN photo-injector at CERN using fiber-optic modulators on the drive laser
The future Compact Linear Collider (CLIC) e^-/e^+ collider is based on the two-beam acceleration concept, whereby interleaving electron bunches of the drive beam through a delay loop and combiner rings as well as high peak RF power at 12GHz are created locally to accelerate a second beam, the main beam. One of the main objectives of the currently operational CLIC Test Facility (CTF3) is to demonstrate beam combination from 1.5GHz to 12GHz, which requires satellite-free fast phase-switching of the drive beam with sub-ns speed. The PHIN photo-injector, with the photo-injector laser, provides flexibility in the time structure of the electron bunches produced, by direct manipulation of the laser pulses. A novel fiber modulator-based phase-switching technique allows clean and fast phase-switch at 1.5GHz. This paper describes the switching system based on fiber-optic modulators, and the measurements carried out on both the laser and the electron beam to verify the scheme
Lifetime Studies of Cs2Te Cathodes at the Phin RF Photoinjector at CERN
The PHIN photoinjector has been developed to study the feasibility of a photoinjector option for the CLIC (Compact LInear Collider) drive beam as an alternative to the baseline design, using a thermionic gun. The CLIC drive beam requires a high charge of 8.4 nC per bunch in 0.14 ms long trains, with 2 ns bunch spacing and 50 Hz macro pulse repetition rate, which corresponds to a total charge per macro pulse of 0.59 mC. This means unusually high peak and average currents for photoinjectors and is challenging concerning the cathode lifetime. In this paper detailed studies of the lifetime of Cs2Te cathodes, produced by the co-evaporation technique, are presented with respect to bunch charge, train length and vacuum level. Furthermore, the impact of the train length and bunch charge on the vacuum level will be discussed and steps to extend the lifetime will be outlined
The CLIC Feasibility Demonstration in CTF3
The objective of the CLIC Test Facility CTF3 is to demonstrate the feasibility issues of the CLIC two-beam technology: the efficient generation of a very high current drive beam, used as the power source to accelerate the main beam to multi-TeV energies with gradients of over 100 MeV/m, and stable drive beam deceleration. Results of successful beam acceleration with over 100 MeV/m energy gain are shown. Measurements of drive beam deceleration over a chain of Power Extraction Structures (PETS) are presented. The achieved RF power levels, the stability of the power production and of the deceleration are discussed. Finally, we give an overview of the remaining issues to be addressed by the end of 2011
Impact of laser stacking and photocathode materials on microbunching stability in photoinjectors
Microbunching instability is a well-known phenomenon that may deteriorate the performance of accelerators. The instability may be triggered by a shot-noise mechanism or by some initial intensity modulations at the generation of the electron bunch (or both) and can be amplified all along the machine. At SwissFEL, the free-electron laser (FEL) facility operating at the Paul Scherrer Institute (PSI), the initial design stipulated a shaping of the photocathode laser output to obtain a flat-top longitudinal profile. This scheme is attractive in terms of the uniformity of the beam properties along the bunch. The drawback of this approach is that some unavoidable modulations are generated along the laser pulse. We investigate, both experimentally and by numerical simulations, the longitudinal dynamics of a beam obtained illuminating a copper cathode with a laser profile shaped by the stacking technique. We repeat the analysis for several compression factors and initial laser profile modulations. We find that the microbunching instability gain renders the use of the stacking technique not efficient to run a free-electron laser facility using as photocathode a material with a short response time. We experimentally demonstrate that the use of a material with a longer response time efficiently damps the structures originating from the laser profile obtained with stacking, and helps to improve the performance of the facility. In general, this is an approach to minimize the microbunching instability at any FEL (also not using stacking) or at least reduce the use of other countermeasures, which, such as the laser heater, may degrade the final FEL performance
CTF3 Probe Beam LINAC Commissioning and Operations
The probe beam LINAC, CALIFES, of the CLIC Test Facility (CTF3) has been developed by CEA Saclay, LAL Orsay and CERN to deliver trains of short bunches (0.75 ps) spaced by 0.666 ps at an energy around 170 MeV with a charge of 0.6 nC to the TBTS (Two-beam Test Stand) intended to test the high gradient CLIC accelerating structures. Based on 3 former LIL accelerating structures and on a newly developed RF photo-injector, the whole accelerator is powered with a single 3 GHz klystron delivering pulses of 45 MW through a RF pulse compression cavity and a network of waveguides, splitters, phase-shifters and an attenuator. We relate here results collected during the various commissioning and operation periods which led to nominal performances and stable beam characteristics delivered to the TBTS. Progress has been made in the laser system for beam charge and stability, in space charge compensation for emittance, in RF compression law for energy and energy spread. The installation of a specially developed RF power phase shifter for the first accelerating structure used in velocity bunching allows the control of the bunch length
High Charge PHIN Photo Injector at CERN with Fast Phase switching within the Bunch Train for Beam Combination
The high charge PHIN photo-injector was developed within the framework of the European CARE program to provide an alternative to the drive beam thermionic gun in the CTF3 (CLIC Test Facility) at CERN. In PHIN 1908 electron bunches are delivered with bunch spacing of 1.5 GHz and 2.33 nC charge per bunch. Furthermore the drive beam generated by CTF3 requires several fast 180 deg phase-shifts with respect to the 1.5 GHz bunch repetition frequency in order to allow the beam combination scheme developed at CTF3. A total of 8 subtrains, each 140 ns long and shifted in phase with respect to each other, have to be produced with very high phase and amplitude stability. A novel fiber modulator based phase-switching technique developed on the laser system provides this phase-shift between two consecutive pulses much faster and cleaner than the base line scheme, where a thermionic electron gun and sub-harmonic bunching are used. The paper describes the fiber-based switching system and the measurements verifying the scheme. The paper also discusses the latest 8nC charge production and cathode life-time studies on Cs2Te
Commissioning Experience and Beam Physics Measurements at the SwissFEL Injector Test Facility
The SwissFEL Injector Test Facility operated at the Paul Scherrer Institute between 2010 and 2014, serving as a pilot plant and test bed for the development and realization of SwissFEL, the x-ray Free-Electron Laser facility under construction at the same institute. The test facility consisted of a laser-driven rf electron gun followed by an S-band booster linac, a magnetic bunch compression chicane and a diagnostic section including a transverse deflecting rf cavity. It delivered electron bunches of up to 200 pC charge and up to 250 MeV beam energy at a repetition rate of 10 Hz. The measurements performed at the test facility not only demonstrated the beam parameters required to drive the first stage of an FEL facility, but also led to significant advances in instrumentation technologies, beam characterization methods and the generation, transport and compression of ultralow-emittance beams. We give a comprehensive overview of the commissioning experience of the principal subsystems and the beam physics measurements performed during the operation of the test facility, including the results of the test of an in-vacuum undulator prototype generating radiation in the vacuum ultraviolet and optical range
