4098 research outputs found
Sort by
Estudo comparativo da corrosão em ligas biomédicas
The choice of the material for implants is done based on the mechanical
resistance, corrosion resistance and according to the in vivo and in vitro tests. In this
work the behavior regarding to the corrosion of two alloys already used, Ti-6Al-7Nb
and the stainless steel F-138 and three titanium alloys: Ti-6Al-3Nb, Ti-6Al-5Nb and Ti-
6Al-11Nb, was investigated, which has a great potential for prosthetic material despite
of not being used yet.
The four titanium alloys and the stainless steel F-138 was submitted to the
potentiometry test in Ringer solution mean and pH 7.00. Lost weight test was carried
out too. The two alloys with worse corrosion rate obtained on lost weight test were
submitted to the potentiometry test again. The polarization curve of these samples on
second potentiometry test was compared with the polarization curve of samples of the
same alloy submitted on potentiometry test only.
In the potentiometry test, the Ti-6Al-7Nb alloy was presented the better result on
the corrosion resistance, formation of much passivation films in largest potential space
than other studied alloys. The Ti-6Al-7Nb alloy was the only not to present pitting
corrosion. The lost weight test allowing to obtain the corrosion rate of these alloys: Ti-
6Al-7Nb – 1.17 x 10-3 mm/year, Ti-6Al-11Nb and Ti-6Al-5Nb - 1.29 x 10-3 mm/year
both, Ti-6Al-3Nb - 1.40 x 10-3 mm/year and the stainless steel F-138 - 1.44 x 10-3
mm/year. The Ti-6Al-3Nb alloy on second potentiometry test was presented a less
corrosion resistance than the sample of same alloy submitted on potentiometry test
only. It’s passivation film formatted don’t stopped the increase of the current density.
The stainless steel F-138 has been presented a better result than same sample submitted
on potentiometry test only. It’s current density was the same obtained to the first
potentiometry test but it’s potential space was large. The corrosion resistance of the
stainless steel F-138 was inferior to the corrosion resistance of the Ti-6Al-3Nb alloy on
the second potentiometry test yet.A escolha dos materiais metálicos para implantes ortopédicos é feita com base na
sua resistência mecânica, resistência à corrosão, e segundo resultados de ensaios in vivo
e in vitro. Neste trabalho estudou-se o comportamento quanto à corrosão das ligas Ti-
6Al-7Nb, Ti-6Al-3Nb, Ti-6Al-5Nb, Ti-6Al-11Nb e do aço inoxidável F-138.
As quatro ligas de titânio e o aço inoxidável F-138 foram submetidos ao teste de
potenciometria em meio de uma solução de Ringer com pH 7,00. Ensaios de perda de
massa também foram realizados. As ligas com os piores resultados em perda de massa
foram novamente submetidas ao ensaio de potenciometria. A curva de polarização das
amostras neste segundo teste de potenciometria foi comparada com a curva de
polarização de outras amostras das mesmas ligas analisadas somente em
potenciometria.
No ensaio de potenciometria, a liga Ti-6Al-7Nb apresentou a melhor resposta
quanto a resistência à corrosão formando filmes de passivação num intervalo de
potencial maior do que as outras ligas estudadas e as outras ligas só apresentaram a
formação de um único filme passivador. A liga Ti-6Al-7Nb foi a única que não indicou
a presença de corrosão por pite. Os resultados de perda de massa permitiram obter a
taxa de corrosão destas ligas: Ti-6Al-7Nb-1,17 x 10-3 mm/ano, Ti-6Al-11Nb 1,29 x 10-3
mm/ano, Ti-6Al-5Nb-1,29 x 10-3 mm/ano, Ti-6Al-3Nb-1,40 x 10-3 mm/ano e aço
inoxidável F-138-1,44 x 10-3 mm/ano. A liga Ti-6Al-3Nb apresentou, no segundo teste
de Potenciometria, uma resistência à corrosão pior que da amostra do primeiro ensaio,
seu filme de passivação formado não impediu o crescimento da densidade de corrente.
O aço inoxidável F-138 apresentou um resultado melhor que o primeiro ensaio,
atingindo um potencial maior com a mesma densidade de corrente final, entretanto,
apresentou uma resistência à corrosão inferior à liga Ti-6Al-3Nb
Predição teórica das características hidrodinâmicas de turbinas Francis
This work presents a methodology for the performance prediction of Francis turbine
based on mean streamline analysis. The performance prediction takes into account only the
overall dimensions of the Francis turbine and also the losses correlations for each main
component of the turbine. There is no necessity of take into account any operation parameter
in the maximum efficiency point to accomplish such prediction. The performance prediction
is realized for a wide range of normal operation of the Francis turbine and not only for the
design point.
Various empirical losses correlations that are reported in the technical literature are
presented. The analysis of the losses takes into account different roughnesses of spiral case,
stay vane, wicket gate, runner, draft tube, labyrinths and side rooms between the runner and
fixed components of the turbine. Some empirical correlations refer to a same type of loss,
which are tested and evaluated. From the comparison among these correlations, it is verified
that they can improve substantially the performance prediction, not only at the design point as
at the off-design point. The methodology also allows predict the effect of the roughness as
well as of the Reynolds number on the different efficiencies of the Francis turbine.
A computational routine was developed by means of modules and functions allowing
its modification and the inclusion of new losses correlations. In the initial calculations, some
operation parameters are not known or they depend on parameters that should still be
calculated in posterior calculations. A procedure is presented to illustrate all sequences of
calculations made by the computational routine to obtain the point of maximum efficiency
vi
and all necessary parameters for the performance prediction in a wide range of Francis turbine
operation.
Several theoretical results are presented for some models of losses and for different
roughnesses of the Francis turbine components. These results allow evaluate the gain in the
efficiency of the Francis turbine when the surface roughness is reduced and which
components the efforts should be concentrated for the improvement of the superficial finish.
This effect is expected to be dependent of the specific rotation of the Francis turbine. The
theoretical results are compared with the experimental results obtained for a Francis turbine
with nqA = 266 . A good agreement was observed between measured and calculated values for
a wide range of Francis turbine operation.Este trabalho apresenta uma metodologia para a predição teórica das características
hidrodinâmicas de turbinas Francis com base na linha de corrente média. A predição teórica
considera apenas os parâmetros geométricos principais da turbina Francis bem como as
correlações de perdas para cada componente hidromecânico principal da turbina. Não há
necessidade de se considerar qualquer parâmetro de funcionamento no ponto de rendimento
total máximo para realizar tal predição. A predição teórica é feita para uma ampla faixa de
funcionamento normal da turbina Francis e não somente para o ponto de projeto.
Diversas correlações empíricas de perdas disponíveis na literatura técnica são
apresentadas. A análise das perdas leva em consideração a rugosidade das superfícies da caixa
espiral, pré-distribuidor, distribuidor, rotor, tubo de sucção, labirintos e recintos laterais entre
o rotor e as partes fixas da turbina Francis. Algumas correlações empíricas apresentadas se
referem a um mesmo tipo de perda que são testadas e avaliadas. Da comparação entre essas
correlações, verifica-se que elas podem melhorar substancialmente os resultados obtidos da
predição teórica, não só no ponto de projeto como fora do ponto de projeto. A metodologia
também permite predizer o efeito da rugosidade e do número de Reynolds sobre os diversos
rendimentos da turbina Francis.
Uma rotina computacional foi desenvolvida por meio de módulos e funções
permitindo a sua modificação e a inclusão de novas correlações de perdas. Nos cálculos
iniciais, algumas grandezas de funcionamento não são conhecidas ou dependem de grandezas
iv
que ainda devem ser calculadas em cálculos posteriores. Um procedimento é apresentado para
ilustrar todas as seqüências de cálculos efetuados pela rotina computacional para obter o
ponto de rendimento total máximo e todas as grandezas necessárias para a predição teórica
em uma ampla faixa de funcionamento da turbina Francis.
Diversos resultados teóricos são apresentados para alguns modelos de perdas e para
diferentes rugosidades dos componentes hidromecânicos da turbina Francis. Esses resultados
permitem avaliar o ganho no rendimento total da turbina Francis quando a rugosidade da
superfície é reduzida e em quais componentes da turbina os esforços devem ser concentrados
para a melhoria do acabamento superficial. Esse efeito é esperado ser dependente da rotação
específica da turbina Francis. Os resultados teóricos são comparados com os resultados
experimentais obtidos para uma turbina Francis de nqA = 266 . Uma boa concordância foi
observada entre os valores medidos e calculados, para uma ampla faixa de funcionamento da
turbina Francis
Aquisição automática e tratamento de dados meteorológicos aplicáveis ao projeto e operação de linhas aéreas de transmissão de energia elétrica
The electric power transmission lines consist in one of the most important components
of the electrical system and its vulnerability to the meteorological phenomena is a
determinative factor in its design and operation.
In Brazil, the standard NBR 5422 establishes the basic conditions for the design of
electric power transmission lines in order to guarantee minimum levels of security of
operation under adverse meteorological conditions, such as maximums or minimums values
of air temperature and maximum wind speed, all these parameters calculated for a determined
probability of occurrence or time of return. Thus, meteorological data with quality and
updated are the basic in the transmission lines design. The Data Collection Platforms (DCPs)
or Automated Weather Stations consist in a source of meteorological data for application in
designing of transmission lines. However, it is necessary to carry out first the formatting, the
quality control and the statistical treatment of these data before their use with the procedures
of sizing the conductors, insulators, supports and other components of the transmission lines,
as specified in the standard NBR 5422.
To take care of this demand the specific methodology and computational tools had
been developed, in the form of macros of the electronic spread sheet EXCEL, for the
processing of the meteorological data collected by DCPs for generation of the maps of
temperatures (isothermal) and wind speed (isotach) or application in the design of
transmission lines, in complementation to the maps for these meteorological variables
available in the standard NBR 5422.
To demonstrate the use of this methodology and the developed computational tools, a
region of the State of Minas Gerais was selected and the meteorological data collected by
DCPs was processed, producing the statisticians of the data and the set of maps of isothermal
and isotach. The generated maps are compatible with the available maps in the standard NBR
5422, presenting a better detailing of the studied region. In such a way the developed
methodology and computational tools in this work can be used for the meteorological data
handling collected by PCDs, located in any other regions, becoming a powerful tool for aiding
the design of the new electric power transmission lines or upgrading the existing ones.As linhas aéreas de transmissão de energia elétrica constituem-se em um dos
componentes mais importantes do sistema elétrico e a sua vulnerabilidade aos fenômenos
meteorológicos é um fator determinante no seu projeto e operação.
No Brasil, a norma NBR 5422 estabelece as condições básicas para o projeto de linhas
aéreas de transmissão de energia elétrica de modo a garantir níveis mínimos de segurança de
operação sob condições meteorológicas adversas, tais como extremos máximos ou mínimos
de temperatura do ar e velocidades máximas dos ventos, todos estes parâmetros calculados
para uma determinada probabilidade de ocorrência ou tempo de retorno. Assim, dados
meteorológicos de qualidade e atualizados são fundamentais no dimensionamento das linhas
de transmissão. As Plataformas de Coleta de Dados (PCDs) ou Estações Meteorológicas
Automáticas constituem-se em uma fonte de dados meteorológicos para aplicação no projeto
de linhas de transmissão. Entretanto, é preciso realizar primeiro a formatação, o controle de
qualidade e o tratamento estatístico desses dados antes de sua utilização com os
procedimentos de dimensionamento dos cabos, isoladores, suportes e outros componentes das
linhas de transmissão, conforme especificado na norma NBR 5422.
Para atender essa demanda foram desenvolvidas a metodologia e as ferramentas
computacionais específicas, na forma de macros da planilha eletrônica EXCEL, para o
processamento dos dados meteorológicos coletados por PCDs para geração dos mapas de
temperaturas (isotermas) e de velocidade do vento (isotacas) para aplicação no projeto de
linhas de transmissão, em complementação aos mapas disponibilizados para essas variáveis
na norma NBR 5422.
Para demonstrar a utilização dessa metodologia e das ferramentas computacionais
desenvolvidas, foi selecionada a região do Estado de Minas Gerais e processados os dados
meteorológicos coletados por PCDs, produzindo as estatísticas dos dados e o conjunto de
mapas de isotermas e isotacas. Os mapas gerados são compatíveis com os mapas disponíveis
na norma NBR 5422, apresentando um melhor detalhamento da região de estudo. Desta forma
a metodologia e ferramentas computacionais desenvolvidas neste trabalho podem ser
utilizadas para o tratamento de dados meteorológicos coletados por PCDs, localizadas em
quaisquer outras regiões, tornando-se uma poderosa ferramenta de auxílio no projeto de novas
linhas aéreas de transmissão de energia elétrica ou de recapacitação das existentes
Um método para o ensino de circuito hidráulico e pneumático
Consta no arquivo em PDFConsta no arquivo em PD
Separação cega de sinais: análise comparativa entre algoritmos
Nowadays the blind signal processing is one of the areas of greater highlight in the signal processing. The signal processing techniques do not make use of any training sequence nor any information on the mixture of the system to which the signals are subjected to; being the blind separation one of the main areas of the blind processing.
The blind separation or the blind signal (source) separation problem consists of retrieval a set of unknown signals or sources by the observations done by sensors of mixture of this signals. It’s no shadow of doubt, a problem of great interest in the signal processing area, once to be solved it is necessary that a set of hypotheses a bit restrictive be carried out. Being that, the blind source separation techniques run across countless applications: data set processing; multi-users communications; voice and image recognition; biomedical signal processing. By means of separation techniques, one can, therefore, retrieve one or all the sources just basing on the information on observations or measurement done by the set of sensors. The blind adjective was incorporated to characterize the lack of information inherent in the separation process. To fulfill this lack of information some properties of the sources nature, mixture, and noise are taken into account for separation process. This way, the algorithms of blind separation try and restore at the exit of separation system one property known by the sources.
One of the main tools used to solve the blind separation problem has been the Independent Component Analysis. It is important to mention that the blind separation and the Independent Component Analysis terms are often mixed up or used like synonym, although they refer to a similar or equal pattern and are solved with similar or equal algorithms, under the restriction on the original sources be statistically independent. However, mainly in real problems, the independent component analysis and blind separation goals are a bit different: the blind separation goal is to estimate the original signals even if they are not completely independent; whereas, the independent component analysis goal is to determine one transformation that ensures the estimate signals are as independent as possible. One may yet observe that the independent component analysis methods use, in most cases, statistics of superior order, while the blind separation methods are apt to use just statistics of second order.
Based on the above-mentioned considerations, this dissertation presents one state-of-art review of the main techniques that deal with the separation problem; by means of comparison of three algorithms: AMUSE, JADE and FLEXICA that were compared through the application of them into test signals, telecommunication signals and a real world biomedical signal.A separação cega ou o problema da separação de sinais (fontes) consiste na recuperação de um conjunto de sinais ou fontes desconhecidos a partir de observações feitas por sensores das misturas destes sinais. Este é, sem dúvida, um problema de grande interesse dentro da área de processamento de sinais, uma vez que para ser solucionado é necessário que se cumpram um conjunto de hipóteses pouco restritivas. Assim sendo, as técnicas de separação cega de fontes encontram inúmeras aplicações: processamento de conjunto de dados; comunicações multiusuários; reconhecimento de voz e imagem; processamento de sinais biomédicos. Através das técnicas de separação, pode-se, portanto, recuperar uma ou todas as fontes com base apenas nas informações nas observações ou medidas feitas por um conjunto de sensores. O adjetivo cego foi incorporado para caracterizar a falta de informação inerente ao processo de separação. Para suprir esta falta de informação são levadas em consideração no processo de separação algumas propriedades sobre a natureza das fontes, da mistura e sobre o ruído adicionado ao processo. Assim, os algoritmos para separação cega procuram restaurar na saída do sistema de separação uma propriedade conhecida das fontes.
Uma das principais ferramentas utilizadas para solucionar o problema da separação cega tem sido a Análise de Componentes Independentes. É importante mencionar que os termos separação cega e Análise de Componente Independentes são freqüentemente confundidos ou trocados, embora eles se refiram a um modelo similar ou igual e sejam resolvidos com algoritmos similares ou iguais, sob a restrição de que as fontes originais são estatisticamente independentes. Entretanto, principalmente em problemas reais, os objetivos da Análise de Componentes Independentes e da separação cega são um pouco diferentes: o objetivo da separação cega é estimar os sinais originais mesmo se eles não forem completamente independentes; por sua vez, o objetivo da análise de componentes independentes é determinar uma transformação que assegure que os sinais estimados sejam tão independentes quanto possível. Deve-se notar ainda que os métodos para análise de componentes independentes utilizam, na maioria dos casos, estatísticas de ordem superior, enquanto que os métodos para separação cega são aptos a utilizar somente estatísticas de segunda ordem.
Com base nas considerações supracitadas, esta dissertação apresenta uma revisão do estado da arte e das principais técnicas que tratam o problema da separação cega, através da análise comparativa entre três algoritmos: AMUSE, JADE e FLEXICA. Para realizar as referida comparação, os algoritmos são aplicados a sinais de teste, sinais de comunicações e sinais biomédicos reais
Técnicas de análise preditiva para falhas elétricas em motores de indução trifásicos
Não constaCresce cada vez mais o interesse em se alcançar maior confiabilidade nos processos produtivos. Os motores de indução têm papel importantíssimo em muitos desses processos. Em vista desse crescimento muito tem sido discutido acerca da manutenção preditiva, como solução de garantia de maior vida útil desses motores como também paradas programadas efetivas. Vê-se muito o desenvolvimento de técnicas de manutenção preditiva de motores quanto às falhas mecânicas no ambiente industrial, porém apesar de grande segurança das partes mecânicas, na maioria das vezes tem-se o motor parando de forma não programada por uma falha elétrica.
Na tentativa de oferecer soluções para esses problemas, muitas técnicas de análise preditiva de falhas elétricas foram desenvolvidas e publicadas em muitos artigos e revistas. Todas essas técnicas baseiam-se na análise de dados dos motores como tensão, corrente, fluxos axiais dentre outros, que são medidos constantemente e processados de forma a gerar um indicador da presença ou não de falha, sem a necessidade da parada do motor apresentando também o tipo de falha existente e ainda seu grau de severidade.
O presente trabalho consiste no estudo, aplicação e comparação de três dessas técnicas que são Extend Park´s Vector Approach (EPVA), Motor Current Signature Analisys (MCSA) e cálculo da impedância de seqüência negativa a fim de apontar ao final deste as vantagens, desvantagens e condições de aplicação para desenvolvimento de um sistema de monitoração de falhas elétricas envolvendo cada uma delas.
O trabalho compreendeu os estudos das técnicas, desenvolvimento de um sistema de simulação de falhas e aplicação de um sistema de monitoração a partir de cada uma das técnicas, além do estudo de vários tipos de falhas potenciais em motores de indução, suas causas e efeitos, a fim de demonstrar a importância no diagnóstico precoce evitando a rebobinagem do motor ou o descarte deste precocemente. As falhas elétricas têm uma particularidade de evoluir muitas vezes rapidamente, trazendo a combustão em um ponto do estator e logo em seguida em todo o enrolamento e se não controlado pode chegar até mesmo a perda total.
Foram discutidas vários pontos de cada uma das técnicas, como a sua implementação, utilizando ferramentas matemáticas, equacionamentos, formas de identificação de falha a partir de cada uma delas e verificação dos resultados destas mediante a ocorrência de falhas como, curto-circuito entre espiras, curto-circuito entre fases, desequilíbrio de tensão e perda de fase
Aterramento e proteção contra descargas atmosféricas em áreas classificadas
This paper has been originated by the information necessity about
Grounding and Protection Against Discharges, in classified Areas. That’s occurs
because the shortage and edition in so many different ways, that makes its
process laborious and difficult.
The objective is the concentrate compilation about instructions and
parameters, that will technicality support the electricity engineers professionals
and students, whose needs information and will contribute for a knowledge
amplification about this issue.Este trabalho se origina da necessidade de informações, que devido sua
escassez e editoração em diversas literaturas, oneram o processo de pesquisa
e estudo no tema de Aterramento e Proteção contra Descargas Atmosféricas
em Áreas Classificadas.
O objetivo é a compilação concentrada de instruções e parâmetros que
servirão como suporte técnico aos profissionais de eletricidade e estudantes
que necessitem de informação e contribuirá para a ampliação do conhecimento
sobre o tema
Agentes polimórficos dinâmicos inteligentes: teoria e aplicação
When multiple agents with different characteristics are considered to solve a
set of problems, it is very challenging to specify the number of agents, the specific
function of each one to be used, and the schedule of these actions in order to solve
these problems. Different situations may demand different sets of agents with specific
knowledge regarding how to solve each problem. To deal with scenarios like this, the
present article suggests an innovation at the Intelligent Agent Theory, a new concept
called Intelligent Dynamic Polymorphic Agent (IDPA). The IDPA has the goal of trying
to find the minimum set of resources and agents (each one with its own
characteristics) to plan and execute specific problems using AI planning. By on-line
actualization, the IDPA architecture allows the quest for available agents present in
the system and being feed by information about their respective domains. Using this
knowledge, the system uses a predefined heuristic model to dynamically assist the
planner obtaining a plan with a reduced number of resources. It also identifies and
dispatches the necessary agents in order to carry out the plan. After this
identification, the agents merge with the entity called APDI, which, through
polymorphism, is capable of accomplish the initial task Another benefit of this
methodology is that, due to its dynamic behavior, it is possible to change the original
plan by the advent of an unexpected problem, even if the plan is being already
executed.Quando múltiplos agentes com características diferentes são considerados
para a solução de uma série de problemas, alguns fatores como a especificação do
número de agentes a ser utilizado, qual função específica que deverá ser utilizada
por cada um e ainda o planejamento das ações para a resolução do problema, não é
de forma alguma trivial. Diferentes situações podem exigir conjuntos específicos de
agentes com conhecimento dedicado à resolução do problema. Para lidar com este
cenário, este trabalho de dissertação sugere uma inovação na teoria de agentes
inteligentes, um novo conceito chamado Agente Polimórfico Dinâmico Inteligente
(APDI). Este agente juntamente com a arquitetura do sistema proposto neste
trabalho tem por objetivo buscar um conjunto mínimo de agentes e recursos, (cada
qual com suas próprias características) para se resolver um determinado problema
utilizando técnicas de Planejamento Inteligente. Através de atualização on-line, a
arquitetura de APDI permite a procura pelos agentes existentes no sistema que
estão disponíveis, e também obter informações dos seus respectivos domínios. Com
este conhecimento, o sistema utiliza uma heurística pré-definida para auxiliar
dinamicamente o planejador, obtendo assim, um plano com um número reduzido de
recursos. Após a determinação deste conjunto mínimo, os agentes se unem a outra
entidade, o APDI, que receberá o plano gerado pelo planejador e será capaz de
executar cada função específica de cada um dos agentes através de polimorfismo,
realizando, assim a tarefa inicialmente atribuída. Outra funcionalidade importante
desta metodologia é quando ocorre uma parada no sistema durante a execução do
plano, e algum agente ou recurso do sistema se torna indisponível. Para resolver
isto, é realizado um replanejamento para se buscar um novo conjunto de agentes
que continue a execução da tarefa interrompida
Análise de viabilidade técnica e econômica da inserção da geração ondomotriz como alternativa sustentável ao planejamento energético de médio e longo prazo
Seas and oceans provide a clean and renewable energy source widely accessible near major consumption centers. This source offers a valuable option in the energy transition and decarbonization process. Wave energy, along with the Oscillating Water Column (OWC) onshore device, is one of the most prominent forms of ocean energy. The implementation of this device requires locations with rocky outcrops and a steeper slope to ensure the physical installation and reduce energy dissipation due to friction with the seabed. Brazil has approximately 7,490 km of coastline with varied coastal geometries and geomorphologies, some highly suitable for OWC installation. It is estimated that the Brazilian coastline has an exploitable capacity of 114 GW, divided between wave and tidal energy, and this potential is considered to be of great importance for supporting global decarbonization efforts. This study aimed to identify and quantify the energy potential of suitable locations for installing wave energy farms equipped with the OWC onshore device. These locations were surveyed using QGIS software, resulting in a georeferenced map with a database of 319 sites. The survey revealed an exploitable capacity of 9.73 GW in ten of the seventeen coastal states, with an estimated energy output of 83.7 GWh per year, equivalent to two times the energy consumption of the State of Rio de Janeiro, which has a population of approximately 17.5 million. It is concluded that replacing the same amount of gas-fired thermal energy with wave energy would reduce CO2 emissions by about 44.52 million tons of greenhouse gases per year. This result suggests that wave power generation can be included in studies on the expansion of the Brazilian electricity system, acting as a catalyst in the energy transition.Os mares e oceanos oferecem uma fonte de energia limpa, renovável e amplamente disponível próxima aos principais centros de consumo. Isso a torna uma opção valiosa no processo de transição energética e descarbonização da matriz. Dentre as energias oceânicas, destaca-se a energia das ondas e seu dispositivo conversor coluna de água oscilante (CAO) costeiro. O uso desse dispositivo requer localidades com afloramentos rochosos e uma declividade mais acentuada, a fim de garantir a instalação física do dispositivo e uma menor dissipação energética pelo atrito com o leito marinho. O Brasil possui aproximadamente 7.490 km de costa, apresentando diversas geometrias e geomorfologias de orla, algumas extremamente propícias para a instalação de um CAO. Estima-se que o litoral brasileiro possua uma capacidade de exploração de 114 GW, sendo esses distribuídos entre energia ondomotriz e maremotriz, demonstrando grande potencial para contribuir com o esforço de descarbonização mundial. Este trabalho teve como objetivo identificar e quantificar o potencial energético de locais adequados para a instalação de parques geradores ondomotrizes equipados com o dispositivo CAO costeiro. Para tanto, foi realizada uma prospecção desses locais por meio do software QGIS, e que resultou em um mapa georreferenciado contendo um banco de dados com 319 localidades. Com isso, identificou-se uma capacidade de exploração de 9,73 GW em dez dos dezessete Estados costeiros e uma energia estimada em 83,7 GWh/ano. Esse valor corresponde a duas vezes o consumo de energia do Estado do Rio de Janeiro, o qual possui uma população de aproximadamente 17,5 milhões de habitantes. Conclui-se que, substituir a mesma porção de energia de geração térmica a gás por energia de ondas reduziria as emissões de CO2 em aproximadamente 44,52 milhões de toneladas de gás de efeito estufa anualmente. Esse resultado sugere que a geração ondomotriz pode ser incluída em estudos de expansão sistema elétrico brasileiro, colaborando como um fator de aceleração na transição energética