Jurnal HPJI
Not a member yet
175 research outputs found
Sort by
PENGARUH PENGGUNAAN PASIR KUARSA PADA LASTON AC-WC SEBAGAI PENGGANTI AGREGAT HALUS
Abstract Vehicle loads and high traffic growth nowdays lead to increased traffic loads on pavement that will accelerate the occurrence damage of pavement layer. Based from the natural resources of quartz sand was need to research quartz sand. Conducted test in this research were Marshall tests, immersion, and indirect tensile strength test to determined the durability of asphalt concrete mixture with optimum bitumen content after 5 variations were made in this research. The variations are V1, V2, V3, V4, and V5. The variations of quartz sand content that made based on the weight percentage on each aggregate filter numbers. The durability of the asphalt concrete mixture was seen from the value result of Marshall test, immersion test, indirect tensile strength test, residual strength index, and tensile strength ratio. The results show that Marshall stability value has decreased stability value in succession after immersion test. The indirect tensile strength results shows the tensile value performed on Un-Condition and Condition. The stability value of the indirect tensile strength Condition indicates a consecutive decrease due to immersion. Keywords: Marshall tests, indirect tensile strength test, immersion, quartz sand, residual strength index Abstrak Pembebanan dan pertumbuhan lalu lintas yang tinggi menyebabkan bertambahnya beban lalu lintas pada konstruksi jalan yang akan mempercepat terjadinya kerusakan pada lapisan jalan raya. Dilihat dari sumber daya alam pasir kuarsa yang ada, maka perlu adanya penelitian tentang pasir kuarsa. Pengujian yang dilakukan dalam penelitian ini adalah uji Marshall, immersion, dan indirect tensile strength test untuk mengetahui durabilitas campuran beton aspal dengan KAO setelah dibuat 5 variasi secara berturut-turut pada campuran V1, V2, V3, V4, dan V5. Variasi kadar pasir kuarsa tersebut dibuat berdasarkan persentase berat pada setiap nomor saringan pada agregat halus. Durabilitas campuran beton aspal dilihat dari nilai hasil uji Marshall, immersion, indirect tensile strength test, indeks kekuatan sisa, dan rasio kuat tarik. Hasil pengujian menunjukkan nilai stabilitas Marshall mengalami penurunan nilai stabilitas secara berturut-turut setelah uji perendaman. Pengujian indirect tensile strength menunjukkan nilai tarik dilakukan pada Un-Condition dan Condition. Nilai stabilitas pada indirect tensile strength Condition mengalami penurunan berturut-turut akibat perendaman. Kata-kata kunci: uji Marshall, indirect tensile strength, immersion, pasir kuarsa, indeks kekuatan sis
STRATEGI PEMBANGUNAN INFRASTRUKTUR WISATA TERINTEGRASI
Abstract Development of Tourism Infrastructure is one of the vital aspect to support Indonesia economic growth. On Presiden’s “Nawa Cita” Program, tourism is one of National priority programs. According to the Government Regulation of the Republic of Indonesia Number 50/2011, about Master Plan for National Tourism Development 2010-2025, there are 88 National Tourism Strategic Areas (KSPN) that scattered along Indonesia teritory. From 88 KSPN, Ministry of Tourism prioritized tourism area development in 25 KSPN. Through Letter from Coordinating Ministry ofMaritime and Resources Affairs, it focused became 10 priorities KSPN, i.e. Danau Toba, Tanjung Kelayang, Tanjung Lesung, Pulau Seribu, Borobudur, Bromo, Mandalika, Labuhan Bajo, Wakatobi and Morotai. Overall, the gorvernment, through the Ministry of Public Works and Housing (MPWH)and specifically Directorate General of Highways, has supported tourism areas development by providing access road through national road network. In 2018, Directorate General of Highways will focus on road infrastructure development in 3 priority KSPN, i.e. Danau Toba, Borobudur, and Mandalika. Program development of tourism areas in Indonesia still needs comprehensive and integrated program support through the master plan preparation. To follow-up, the MPWH through Regional Infrastructure Development Agency will responsible to prepare the master plan of those three priority KSPN. Keywords: infrastructure, master plan, National Tourism Strategic Areas, Nawa Cita, tourism Abstrak Pengembangan infrastruktur kepariwisataan merupakan salah satu aspek penting untuk mendukung pertumbuh-an perekonomian Indonesia. Dalam program “Nawa Cita” Presiden, pariwisata menjadi salah satu program prioritas nasional. Menurut Peraturan Pemerintah Republik Indonesia Nomor 50 Tahun 2011, tentang Rencana Induk Pembangunan Kepariwisataan Nasional Tahun 2010-2025, terdapat 88 Kawasan Strategis Pariwisata Nasional (KSPN) yang tersebar di seluruh wilayah Indonesia. Dari 88 KSPN tersebut, Kemen-terian Pariwisata memprioritaskan pengembangan kawasan pariwisata pada 25 KSPN hingga tahun 2019. Kemudian melalui Surat Menteri Koordinator Bidang Maritim dan Sumber Daya, dari 25 KSPN difokuskan menjadi 10 KSPN Prioritas, yaitu Danau Toba, Tanjung Kelayang, Tanjung Lesung, Pulau Seribu, Borobudur, Bromo, Mandalika, Labuhan Bajo, Wakatobi, dan Morotai. Secara umum, pemerintah melalui Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) khususnya Ditjen Bina Marga telah mendukung pengem-bangan kawasan pariwisata tersebut dengan menyediakan jalan akses melalui jaringan jalan nasional. Pada tahun 2018, Ditjen Bina Marga akan memfokuskan pengembangan infrastruktur jalan pada 3 KSPN prioritas, antara lain Danau Toba, Borobudur, dan Mandalika. Pengembangan program pada kawasan pariwisata di Indonesia masih membutuhkan dukungan program yang komprehensif dan terintegrasi melalui penyusunan masterplan. Sebagai tindak lanjut, Kementerian PUPR melalui Badan Pengembangan Infrastruktur Wilayah akan menyusun masterplan untuk ketiga KSPN prioritas tersebut. Kata-kata kunci: infrastruktur, masterplan, Kawasan Strategis Pariwisata Nasional, Nawa Cita, pariwisat
KESIAPAN KONTRAKTOR TERHADAP KEBIJAKAN PRESERVASI JALAN NASIONAL DI SUMATERA SELATAN
Abstract Directorate General of Highways, through the Directorate of Roads Preservation, will apply a new policy, namely long segment national road preservation, to maintain national roads. Long segment road preservation is expected to change the paradigm of the contractors, from the road construction executors to become road managers. This purpose of this study is to evaluate the readiness of the contractors on the long segment road preservation policy. The sample for this study consists of 109 respondents, including 63 respondents from the roads manager, 21 respondents from the supervising consultants and 25 respondents from the contractors. The method used in this study is the structural equation modeling method, supported by AMOS ver. 21. The results show that the causal relationship between the variables of contractor’s performance with quality performance of long segment road preservation amounted to 31.20%. The causal relationship between the variables of contractor’s performance to each variables, such as human resources, materials, equipment, methods, and quality control contribute significantly by 41.80%, 78.80%, 26.10%, 73.20%, and 42.20%, respectively. Keywords: contractors’ performance, long segment road preservation, structural equation modeling Abstract Direktorat Jenderal Bina Marga, melalui Direktorat Jalan Preservasi, akan menerapkan kebijakan baru, yaitu long segment untuk preservasi dan pemeliharaan jalan nasional Indonesia. Long segment untuk preservasi jalan nasional diharapkan mengubah paradigma kontraktor, dari yang hanya sebagai pelaksana kegiatan konstruksi menjadi manajer jalan. Penelitian ini bertujuan untuk mengevaluasi kesiapan kontraktor pada preservasi jalan nasional long segment. Ukuran sampel pada penelitian ini adalah 109 responden, terdiri dari 63 responden dari manajer jalan, 21 responden dari konsultan pengawas, dan 25 responden dari kontraktor. Penelitian ini menggunakan metode struktural equation modeling dan didukung oleh AMOS ver. 21. Hasil yang didapat menunjukkan bahwa hubungan sebab akibat antara variabel kinerja kontraktor dengan kinerja kualitas long segment untuk preservasi jalan sebesar 31,20%. Hubungan sebab akibat antara variabel kinerja kontraktor untuk setiap variabel, seperti sumber daya manusia, material, peralatan, metode, dan kontrol kualitas masing-masing memberikan kontribusi sebesar 41,80%, 78,80%, 26,10%, 73,20%, dan 42,20%. Kata-kata kunci: kinerja kontraktor, preservasi jalan long segment, structural equation modelin
TEKNOLOGI TAMBALAN CEPAT MANTAP SEBAGAI SOLUSI CEPAT PENANGANAN KERUSAKAN JALAN BERLUBANG
Abstract Road pothole handling should be done as soon as possible and using the appropriate patching material. In this article the handling of road potholes using quick patch products, as innovation results of the Institute of Road Engineering, is introduced. These products have some advantages, including that it can be laid on the ambient temperature, it can be produced in the form of packaging, and it has a high enough strength. The laboratory test result shows that it has the Marshall Stability value greater than 500 kg. The field trials also show good performance, with no aggregate segregation nor cracked and have a relatively small rut depth, with an average value of 6 mm. Keywords: potholes, road damage, patching material Abstrak Penanganan jalan berlubang harus dilakukan sesegera mungkin dan menggunakan material penambalan yang sesuai. Pada tulisan ini diperkenalkan penanganan kerusakan jalan berlubang dengan memanfaatkan produk-produk Tambalan Cepat Mantap hasil inovasi Pusat Penelitian Jalan dan Jembatan. Produk-produk ini memiliki keunggulan, yaitu dapat dihampar pada temperatur udara sekitar (ambient temperature), dapat diproduksi dalam bentuk kemasan, serta memiliki kekuatan yang cukup tinggi. Dari hasil pengujian di laboratorium diperoleh nilai Stabilitas Marshall TCM lebih besar dari 500 kg. Hasil uji coba di lapangan juga menunjukkan kinerja yang baik, dengan tidak terjadi pelepasan butir atau retak serta memiliki kedalaman alur yang relatif kecil, dengan nilai rata-rata 6 mm. Kata-kata kunci: jalan berlubang, kerusakan jalan, material penambala
THE RELATIONSHIP OF SAFETY AND COMPONENTS OF TOLL ROADS SERVICE
Abstract Indonesia uses Minimum Service Standard to provide the good service on toll road while Korea uses Level of Service and Information Technology System to measure the service on toll road. With a different implementation of service on a toll road, there is a different result on safety. This study shows exactly which component has a big effect to influence the road safety based on Korean and Indonesian experts, and shows the weight of those components in affecting the road safety. This study uses descriptive-quantitative method with questionnaire data collection techniques. An analysis was performed using the Structural Equation Modeling method. The result shows that the contribution of toll road service based on Korean expert data (24.1%) is larger compared to that of Indonesian expert data (21.4%) in improving the road safety. The most important component of toll road service to improve the road safety based on Korean expert data is toll road condition (90.8%), and the second is safety tools (85.6%). On the other hand, the most important component of toll road service to improve the road safety based on Indonesian expert data is safety tools (74.2%), and the second is toll road condition (54%). Based on both results, the component which has the biggest effect on the road safety is human factor and the second is the road. Keywords: toll road service, road safety, Structural Equation Modeling, human factor Abstrak Indonesia menggunakan Standar Pelayanan Minimal untuk memberikan pelayanan yang baik di jalan tol sedangkan Korea menggunakan Tingkat Layanan dan Information Technology System untuk mengukur layanan di jalan tol. Dengan implementasi layanan yang berbeda, terdapat hasil yang berbeda pada keselamatan di jalan tol. Penelitian ini menunjukkan secara tepat komponen yang memiliki pengaruh besar untuk mempengaruhi keselamatan jalan berdasarkan tenaga ahli Korea dan tenaga ahli Indonesia, serta menunjukkan bobot komponen yang mempengaruhi keselamatan jalan. Penelitian ini menggunakan metode deskriptif- kuantitatif dengan teknik pengumpulan kuesioner data. Analisis dilakukan dengan menggunakan metode Structural Equation Modeling. Hasil analisis menunjukkan bahwa kontribusi layanan jalan tol berdasarkan data tenaga ahli Korea (24,1%) lebih besar dibandingkan dengan data tenaga ahli Indonesia (21,4%) dalam meningkatkan keselamatan di jalan. Komponen yang paling penting dari layanan jalan tol untuk meningkatkan keselamatan di jalan berdasarkan data tenaga ahli Korea kondisi jalan tol (90,8%), dan yang kedua adalah alat pengaman (85,6%). Di sisi lain, komponen yang paling penting dari layanan jalan tol untuk meningkatkan keselamatan di jalan berdasarkan data tenaga ahli Indonesia adalah alat pengaman (74,2%), dan yang kedua adalah kondisi jalan tol (54%). Berdasarkan kedua hasil tersebut, komponen terbesar yang memiliki pengaruh pada keselamatan jalan adalah faktor manusia dan yang kedua adalah jalan. Kata-kata kunci: pelayanan jalan tol, keselamatan jalan, Structural Equation Modeling, faktor manusi
KONTRAK KERJA BERBASIS KINERJA DAN EVALUASI PENERAPAN PADA JALAN NASIONAL
Abstract Performance Based Contract is an innovation maintenance contract to improve the quality and value-added of the national road service. Under this contract, the performance of contractors is not evaluated by the input and processes, but by the output and outcome performance indicators which had already clearly been defined and measurable. Contractors are free to establish what, when, how, and where the maintenance work is performed. With its creativity and innovation, the contractor can increase the added value of maintenance work to more directly meet the road user expectations. Since 2011 the Directorate General of Highways has been trying to implement the Performance Based Contract, but the condition of the national road service is not ideal yet, characterized by the frequent of overloading, the provisions of program development and preservation are not yet firm, the design life, road damage, and construction failure that have not been applied resulting in the need for adjustment to the initial concept of the Performance Based Contract. This paper discusses the adjustments made, the deviation of the basic concepts of the Performance Based Contract, analysis of the problems faced, and the challenges to be overcome to enhance the concept of the Performance Based Contract for national road maintenance in the future. Keywords: Performance Based Contract, National Road, overloading, road maintenance Abstrak Performance Based Contract (PBC) merupakan kontrak inovasi pemeliharaan untuk meningkatkan mutu dan nilai tambah penyelenggaraan jalan nasional. Dalam kontrak ini, kinerja pemeliharaan kontraktor tidak dinilai dari input dan proses, tetapi melalui indikator kinerja output dan outcome yang telah lebih dulu didefinisikan dengan jelas dan terukur. Kontraktor bebas menetapkan apa, kapan, bagaimana, dan di mana pekerjaan pemeliharan dilakukan. Dengan kreativitas dan inovasinya, kontraktor dapat meningkatkan nilai tambah pekerjaan pemeliharaan untuk lebih langsung memenuhi harapan pengguna jalan. Ditjen Bina Marga semenjak tahun 2011 telah melakukan uji coba penerapan PBC, namun kondisi penyelenggaraan jalan nasional yang belum ideal ditandai oleh seringnya beban berlebih, ketentuan program pembangunan dan preservasi yang belum tegas, umur perencanaan, kerusakan, serta kegagalan bangunan yang belum diterapkan mengakibatkan perlunya dilakukan penyesuaian terhadap konsep initial PBC. Makalah ini membahas penyesuaian yang dilakukan, penyimpangannya terhadap konsep dasar PBC, analisis terhadap permasalahan yang dihadapi, dan tantangan yang masih harus diatasi untuk mengembangkan konsep PBC pemeliharaan jalan nasional di masa yang akan datang. Kata-kata kunci: Performance Based Contract, jalan nasional, beban berlebih, pemeliharaan jala
EVALUASI KEBUTUHAN LAHAN JALAN NASIONAL BERBASIS SISTEM INFORMASI GEOGRAFIS DI PULAU LOMBOK
Abstract Evaluation of land requirement for the national roads is needed because of issues related to land acquisition and compensation price. The purposes of this study are: (1) Identifying the characteristics of national roads in Lombok Island; (2) Analyzing graphics information for the distribution of the land requirement of national roads in Lombok Island; and (3) Providing policy recommendations for the planning of widening national road in Lombok Island. The research methods are based on geographic information system with analysis overlay, buffer, and geoprocessing. The result showed that the characteristics of the national roads in Lombok Island have not met requirement based on regulations. The largest land requirement for determined right of way are located in North Lombok and the smallest portion are located in West Lombok. Recommendations for national road planning need to consider regulations and policies, land acquisition, planning priorities, physical limitations, landuse, and spatial planning. Keywords: land requirement, national road, landuse, spatial planning Abstrak Evaluasi kebutuhan lahan untuk jalan nasional diperlukan karena adanya masalah yang berkaitan dengan pembebasan lahan dan harga ganti rugi. Tujuan penelitian ini adalah untuk: (1) Mengidentifikasi karakteristik jalan nasional di Pulau Lombok; (2) Menganalisis informasi grafis untuk distribusi kebutuhan lahan bagi jalan nasional di Pulau Lombok; dan (3) Memberikan rekomendasi kebijakan untuk perencanaan pelebaran jalan nasional di Pulau Lombok. Metode penelitian didasarkan pada sistem informasi geografis dengan analysis overlay, penyangga, dan geoprocessing. Hasil penelitian menunjukkan bahwa karakteristik jalan nasional di Pulau Lombok belum memenuhi persyaratan berdasarkan peraturan. Kebutuhan lahan terbesar untuk ruang milik jalan terletak di Lombok Utara dan bagian terkecil yang terletak di Lombok Barat. Rekomendasi untuk perencanaan jalan nasional perlu mempertimbangkan peraturan dan kebijakan, pembebasan lahan, prioritas perencanaan, keterbatasan fisik, penggunaan lahan, dan perencanaan tata ruang. Kata-kata kunci: kebutuhan lahan, jalan nasional, penggunaan lahan, perencanaan tata ruan
EVALUASI RENCANA PEMBANGUNAN JALAN LINGKAR DI KOTA BANDA ACEH
Abstract The population of the City of Banda Aceh in the disaster prone areas, after the tsunami disaster, are likely to increase. The development of the area and the level of population mobility in the city, especially in areas prone to tsunami, created a variety of transportation problems in the city center and its surrounding areas. Therefore, in response to these conditions, the Government plans solutions to overcome the transportation problems. One of the solutions is to construct a ring road for the City of Banda Aceh. In this study, the implementation of two different development scenarios for the ring road construction was evaluated. For the Do Something in scenario 1, the construction of the ring road will be in 2031, while for the Do Something scenario 2, the ring road will be built in 2026. The average reduction of the V/C ratio given by the Do Something scenario 1 is 9.0%, which is less than that given by the Do Something scenario 2 (9.6%). It is concluded that the Do Something scenario 2 gives better results than the Do Something scenario 1. Keywords: engineering, traffic, geometric, scenario Abstrak Jumlah penduduk Kota Banda Aceh di daerah rawan bencana, pascabencana tsunami, cenderung bertambah. Pengembangan wilayah dan tingkat mobilitas penduduk di dalam kota, terutama di daerah rawan bencana tsunami, menyebabkan berbagai permasalahan transportasi yang berfokus di pusat kota dan sekitarnya. Oleh karena itu, menanggapi kondisi ini, pemerintah merencanakan solusi untuk mengatasi permasalahan transportasi tersebut. Salah satu solusi yang bisa diberikan adalah melakukan pembangunan jalan lingkar di Kota Banda Aceh. Dalam studi ini dilakukan penerapan dua skenario pembangunan jalan lingkar. Pada skenario Do Something 1 pembangunan jalan lingkar dilakukan pada tahun 2031 sedangkan dalam skenario Do Something 2 jalan lingkar dibangun pada tahun 2026. Besar rata-rata penurunan V/C ratio terhadap kondisi do nothing untuk penerapan skenario Do Something 1 adalah 9,0% sedangkan untuk penerapan skenario Do Something 2 adalah 9,6%. Penerapan skenario Do Something 2 memiliki hasil yang lebih baik dibandingkan dengan penerapan skenario Do Something 1. Kata-kata kunci: rekayasa, lalulintas, geometrik, skenari
INOVASI PEMBIAYAAN TANAH UNTUK PROYEK JALAN TOL YANG TERMASUK DALAM PROYEK STRATEGIS NASIONAL DENGAN MEMPERGUNAKAN MEKANISME DANA TALANGAN
Abstract Then needs for prompt funding in land acquisition is important and urgently required for accelerating of the provision of infrastructure. By a funding through Badan Layanan Umum Lembaga Manajemen Aset Negara and a bailout scheme, this will assist to accelerate land acquisition process. The objective of this paper is to identify basic problems and obstacles in the implementation of bailout scheme and also provide recommendation to overcome the problems and obstacle. Poor supporting documents for procurement process is the main problem. According to Lembaga Manajemen Aset Negara, in June 2017 there are total 351 payment documents rejected due to lack of supporting documents. Lack of supporting documents can be divided into two types: (1) lack of documents related to the proof of payment as many as 142 documents, and (2) lack of documents related to the land rights as many as 269 documents. The result of this study shows that the delay will affect the amount of cost of fund that will be borne by the goverment. Keywords: bailout, land funding, Strategic National Projects Abstrak Kebutuhan pendanaan yang cepat dalam pengadaan tanah sangat dibutuhkan dalam percepatan penyediaan infrastruktur. Dengan adanya pembiayaan melalui Badan Layanan Umum Lembaga Manajemen Aset Negara dan skema dana talangan, hal ini akan mempercepat proses pembebasan lahan. Penulisan ini bertujuan untuk memahami permasalahan serta hambatan mendasar dalam pembiayaan kembali dana talangan dan juga memberikan saran untuk menanggulangi permasalahan yang terjadi. Kekurangan dokumen pembayaran menjadi penghambat utama dalam proses pembayaran. Menurut Lembaga Manajemen Aset Negara, sampai dengan Juni 2017 terdapat total 351 dokumen pembayaran yang ditolak akibat kekurangan dokumen pembayaran. Kekurangan atas dokumen tersebut dibagi menjadi dua jenis, yaitu: (1) kekurangan dokumen pembayaran sebanyak 142 dokumen, dan (2) kekurangan dokumen terkait hak atas tanah sebanyak 269 dokumen. Hasil penelitian memperlihatkan dengan adanya keterlambatan akan berdampak terhadap besar cost of fund yang ditanggung oleh negara. Kata-kata kunci: dana talangan, pembiayaan tanah, proyek strategis nasiona