Civil Engineering Dimension (E-Journal)
Not a member yet
443 research outputs found
Sort by
ANALISA FAKTOR-FAKTOR YANG DIPERTIMBANGKAN KONSUMEN DALAM PEMBELIAN PROPERTI DI CITRARAYA SURABAYA
Since June 2003, CitraRaya Surabaya Housing was developed by means of Singaporean City concept that was a reposition of the old concept namely Autonomous City. Along with the new concept, the development and management were adjusted to Singaporean appearances and standards. Factor analysis of property attributes consisting of; location, price, physical appearance, image of the developer, and concept of Singaporean City, shows that CitraRaya’s consumers primary consideration to purchase a house is not the Singaporean City Concept, but the price factor; while the primary consideration to purchase a parcel of land is indeed the Singaporean City concept.
Abstract in Bahasa Indonesia :
Sejak Juni 2003 perumahan CitraRaya Surabaya dikembangkan dengan konsep Kota Singapura yang merupakan reposisi dari konsep lama yaitu Kota Mandiri. Dengan konsep baru ini, pengembangan dan manajemen kota disesuaikan dengan penampilan dan standar Singapura. Dengan menggunakan analisa faktor terhadap atribut-atribut properti yang terdiri dari lokasi, harga, tampilan fisik properti, image developer, dan konsep Kota Singapura, diperoleh bahwa yang merupakan pertimbangan utama konsumen CitraRaya di Surabaya dalam pembelian rumah bukanlah konsep Kota Singapura namun faktor harga, sedangkan pertimbangan utama konsumen dalam pembelian kavling adalah faktor konsep kota Singapura
HARAPAN DAN REALITA SISTEM MANAJEMEN MUTU ISO 9000 DALAM PENERAPANNYA DI PERUSAHAAN KONTRAKTOR
The opening of free market in 2003, leads into the stridently escalating business competition both in domestic and global market. The company, therefore, is trying to win the competition by obtaining ISO 9000 certification which can be applied in the construction business. The purpose of the research is to investigate the reason, the obstacles, the gap between expectation and reality of using ISO 9000, as well as the main priority to be implemented in the company. This research uses survey on contractor companies in Surabaya and Gresik which has implemented ISO 9000. The statistical results show that the main reason to implement ISO 9000 is to increase consistency and to improve its quality. Meanwhile, the main obstacle is time constraint to complete the implementation. Companies still need to increase customer satisfaction and attend on customer focus principle to increase the quality of their outcomes.
Abstract in Bahasa Indonesia :
Akibat terbukanya perdagangan bebas di tahun 2003, persaingan bisnis makin meningkat tajam baik di pasar domestik (nasional) maupun global (internasional). Salah satu upaya perusahaan untuk memenangkan persaingan dengan peningkatan mutu produk atau jasa adalah mendapatkan sertifikasi ISO 9000 yang dapat diterapkan juga dalam bisnis konstruksi. Adapun tujuan penelitian ini untuk mengetahui alasan, hambatan, perbedaaan antara harapan dan realita, dan prioritas utama ISO 9000 yang harus diterapkan oleh perusahaan. Penelitian ini menggunakan survei terhadap perusahaan-perusahaan kontraktor di Surabaya dan Gresik yang sudah menerapkan ISO 9000. Hasil analisa statistik menunjukkan bahwa perusahaan menerapkan ISO 9000 terutama agar mencapai konsistensi dalam pelaksanaan dan memperbaiki mutu. Sedangkan hambatan terbesar yaitu waktu yang diperlukan untuk melengkapi penerapan. Perusahaan-perusahaan kontraktor tersebut masih perlu meningkatkan kepuasan pelanggan dan menerapkan prinsip fokus pelanggan sebagai prioritas utama untuk meningkatkan mutu perusahaan
PROPOSED PROCEDURE FOR ASSESSMENT OF EXISTING PLATFORMS IN INDONESIA
Off-shore platforms were built since the 1970’s in Indonesia, but there is no local code or recommended practice for their design or assessment procedure. The common practice is to use the recommended practice issued by the American Petroleum Institute, API RP2A. The off-shore platforms built in the 1970’s must be re-qualified due to exceedance of the design life. This paper discuss the assessment procedure given in the API RP2A WSD 21th edition, API RP2A LRFD, dan ISO 19902 (draft E – 2001). Problems usually arise due to the fact that the original design was based on API RP2A 10th edition and assessment is done using the new edition which is the 21th edition.
Abstract in Bahasa Indonesia :
Sejak tahun 1970-an di Indonesia terdapat banyak anjungan lepas pantai, tetapi sampai saat ini belum ada peraturan atau tata cara untuk perencanaan dan penelaahannya. Anjungan lepas pantai biasanya direncanakan berdasarkan Recommended Practice yang diterbitkan oleh American Petroleum Institute, API RP2A. Pada saat ini dirasakan adanya kebutuhan untuk melakukan penelaahan kelayakan struktur anjungan lepas pantai yang telah dibangun sejak tahun 1970-an tersebut. Makalah ini membahas prosedur cara penelaahan anjungan lepas pantai yang diatur dalam API RP2A WSD edisi 21, API RP2A LRFD, dan ISO 19902 (draft E – 2001). Masalah biasanya akan timbul karena perencanaan didasarkan kepada API RP2A edisi 10 sedangkan penelaahan kelayakan didasarkan kepada edisi yang terbaru (edisi 21
TINGKAT KEMATANGAN MANAJEMEN PROYEK: SURVEI DI BEBERAPA TEMPAT DI INDONESIA
This paper presents the results of a pilot survey aimed at ascertaining the level of project management maturity in Indonesian companies. Kerzner’s Level 2 assessment tool was used, which basically assesses maturity levels throughout the various phases of an organization’s project management life cycle. This study compare maturity of current situation and expectation of 70 respondents working in 6 different types of organizations in Indonesia. Differences were identified between types of organisations, with the Financial Institutions, Consultants and Manufacturers belonging to a group with higher current maturity scores, while Consultants, Manufacturers and Service Providers belonging to a group with higher expected future maturity scores. There were no significant differences between the results for the various stages of the project life cycle. The results indirectly confirm that the organisations of the participants of the survey are less effective/excellent than they could be.
Abstract in Bahasa Indonesia :
Makalah ini menyajikan hasil survei awal yang bertujuan untuk menentukan tingkat kematangan perusahaan-perusahaan di Indonesia dalam menggunakan metodologi manajemen proyek. Alat ukur yang digunakan adalah Kerzner Tingkat 2, yang mengukur tingkat kematangan melalui berbagai tahapan dari siklus manajemen proyek sebuah organisasi. Studi ini membandingkan tingkat kematangan saat ini dan harapan di masa mendatang terhadap 70 responden yang bekerja di enam jenis organisasi di Indonesia. Hasil survei menunjukkan adanya perbedaan antara berbagai jenis organisasi. Institusi financial, konsultan dan industri barang termasuk dalam kelompok yang nilai kematangannya lebih tinggi untuk kondisi saat ini, sedangkan konsultan, industri barang dan industri jasa termasuk kelompok yang mengharapkan kematangan lebih tinggi di masa mendatang. Tidak ada perbedaan yang signifikan antara tingkat kematangan pada berbagai tahapan pada siklus proyek. Hasil penelitian ini secara tidak langsung menegaskan bahwa organisasi yang disurvei kurang efektif dari yang seharusnya bisa dicapai
HUMAN RESISTANCE TO THE USE OF INFORMATION TECHNOLOGY IN CONSTRUCTION COMPANIES
The process of implementing information technology (IT) often fails to bring the intended result because the human dimension is not given adequate consideration. Yet despite some evidence of failure, little has been written on the nature of human performance, compared to abundant resources about technical and procedural aspects, as it applies to the ideals of the IT philosophy. To combat people’s deficiencies, this paper focuses mainly on the question why people resist IT. It explores sources of human resistance to the use of IT. A survey is the conducted to personnel working for construction companies to examine the resistance sources. The result reveals personal money, habit, and threat to information security as most dominant sources for such resistance, instead of fear of employment instability as many previous researches have discussed. The paper discusses the resistances and suggests possible solutions to deal with them
STUDI TENTANG PENGAJUAN KLAIM KONSTRUKSI DARI KONTRAKTOR KE PEMILIK BANGUNAN
Claim in construction industry is a problem leading to request of additional cost or time extensions, which can lead to a dispute between the owner and contractor. This paper discusses claims submitted by the contactor to the owner. Causes of claim, types, proposal submitted by the contractors, and dispute resolution methods are observed. This research shows that design changes and additional work by owner are the major cause of claims. The contractors’ claim mostly is in additional costs, the proposal submitted by the contractors includes an explanation of the cause of claim, and the claim resolution method used is engineering judgment.
Abstract in Bahasa Indonesia :
Klaim dalam industri konstruksi merupakan masalah yang dapat mengarah kepada permohonan tambahan biaya atau tambahan waktu serta perselisihan antara pemilik bangunan dan kontraktor. Paper ini mendiskusikan klaim yang diajukan kontraktor ke pemilik bangunan, dilihat dari penyebab, bentuk, dan proses pengajuan klaim, serta metode penyelesaian perselisihan dari klaim. Hasil penelitian menunjukkan bahwa penyebab utama klaim adalah perubahan desain dan pekerjaan tambah yang dilakukan pemilik bangunan, sedangkan klaim kontraktor sering berupa penambahan biaya, proses pengajuan klaim dengan menyertakan penjelasan terhadap penyebab klaim, dan metode penyelesaian klaim yang sering digunakan oleh para pihak adalah engineering judgmen
STUDI AWAL APLIKASI TEORI FUZZY SET PADA PERUSAHAAN READYMIX CONCRETE DALAM MEMILIH PEMASOK MATERIAL BETON
Material supply has a very important role in construction process. Material supply process require suitable and reliable supplier. In this study, fuzzy set theory is used as the appraisal and selection process of material suppliers to supply materials needed to produce concrete mix in a ready mix company. Sinusoidal, Blockley, and Baldwin models are used. This research uses three variables as qualifications, which are quality, performance, and payment. With these qualifications, ready mix concrete company can appraise material suppliers to be selected. It is shown that quality can be represented by Sinusoidal model, performance by Blockley model, and payment by Baldwin model, while the appropriate defuzzification method is maximum composite method.
Abstract in Bahasa Indonesia :
Aktivitas yang mempunyai peranan penting dalam proses pelaksanaan proyek konstruksi adalah penyediaan material. Proses penyediaan material memerlukan pemasok yang sesuai dan dapat diandalkan. Dalam studi ini dicoba untuk menggunakan teory fuzzy set dalam proses penelitian dan pemilihan pemasok material untuk adonan beton suatu perusahaan readymix concrete. Model yang dipergunakan adalah model Sinusoidal, Blockley dan Baldwin. Kualifikasi yang digunakan dipengaruhi oleh tiga variabel penentu yaitu variabel kualitas, performa dan pembayaran. Dengan kualifikasi tersebut perusahaan readymix concrete bisa menilai para supplier material yang akan dipakai perusahaan. Penelitian ini menunjukkan bahwa penilaian melalui variabel kualitas dapat diwakili oleh model Sinusoidal, untuk variabel performa diwakili oleh model Blockley dan variabel pembayaran diwakili oleh model Baldwin, sedangkan metode defuzifikasi yang sesuai adalah metode maksimum komposit
FAKTOR-FAKTOR PENYEBAB REWORK PADA PEKERJAAN KONSTRUKSI
Rework cannot be separated from construction projects. The direct and indirect cost resulting from it are quite significant. This research aims to identify the causes of rework and to propose effective ways to reduce it. It is conducted using questionnaire, which was targeted to consultants and contractors in Surabaya. The results show that defective designs, changes in design, and coordination problems among design documents were the most influencing factors causing reworks. In order to reduce rework, the most effective ways according to the respondents are enhancing and improving communication and coordination among participants during design and construction phases, and also predicting and solving design problems before construction works begin.
Abstract in Bahasa Indonesia :
Rework tidak dapat dipisahkan dari dunia konstruksi. Dampak biaya langsung maupun tidak langsung yang diakibatkannya cukup signifikan. Penelitian ini bertujuan mengetahui penyebab utama dari rework dan juga memberikan cara yang efektif untuk menguranginya. Penelitian dilakukan dengan menggunakan kuesioner yang ditujukan kepada konsultan dan kontraktor di Surabaya. Hasil penelitian menunjukkan bahwa kesalahan dan perubahan desain, serta buruknya koordinasi antar dokumen desain adalah faktor yang utama penyebab rework. Untuk dapat mengurangi rework, cara yang paling efektif menurut responden adalah meningkatkan dan memperbaiki komunikasi dan koordinasi pada fase desain dan konstruksi, serta memperkirakan dan mengatasi masalah-masalah desain sebelum masuk ke fase konstruksi
KETERLAMBATAN WAKTU PELAKSANAAN PROYEK KLASIFIKASI DAN PERINGKAT DARI PENYEBAB-PENYEBABNYA
Successfully executing construction project within schedule is one of the most important aims, both for the owner and the contractor. Construction delay is a condition which is completely unwanted, because it will cause lost of money and time for both parties.
Research in finding factors which are dominant or having great influences as the causes of delay, is intended to prepare and build the construction planning and scheduling more complete and accurate; so that delay can be avoided or controlled.
Confirmation to the founded causes by site surveys using questionaire distributed to contractors, have shown that problems arisen from inaccurate workplan, lack of resources. lack of communication/coordination, were dominant factors for causing construction delay from contractor side. On the other hand, the owner side, problems arisen from incomplete and unclear design and scope of works, inspection and control system of the project were dominant for causing delay.
Abstract in Bahasa Indonesia :
Keberhasilan melaksanakan proyek konstruksi tepat pada waktunya adalah salah satu tujuan terpenting, baik bagi pemilik maupun kontraktor. Keterlambatan adalah sebuah kondisi yang sangat tidak dikehendaki, karena akan sangat merugikan kedua belah pihak dari segi waktu dan biaya.
Penelitian ini bertujuan menemukan faktor-faktor yang sangat berperan atau mendominasi sebagai penyebab keterlambatan, dengan maksud agar proses perencanaan dan penjadwalan proyek konstruksi dapat dilakukan dengan lebih lengkap dan cermat; sehingga keterlambatan sedapat mungkin dihindarkan atau dikendalikan.
Temuan penyebab-penyebab keterlambatan, yang dikonfirmasikan dengan sigi lapangan menggunakan kuesioner yang didistribusikan kepada kontraktor, menunjukkan bahwa masalah-masalah tidak seksamanya rencana kerja, tidak tersedianya sumber daya dan kurangnya komunikasi/koordinasi, merupakan faktor-faktor yang dominan sebagai penyebab keterlamabatan dari sisi kontraktor. Dari sisi pemilik proyek, masalah ketidaklengkapan dan ketidakjelasan desain dan lingkup pekerjaan, masalah sistim pengawasan dan pengendalian proyek, merupakan faktor yang dominan sebagai penyebab keterlambatan.
Kata kunci : keterlambatan pelaksanaan, penyebab keterlambatan, perencanaan dan penjadwalan, kontraktor, pemili
DEVELOPMENT OF FINITE DIFFERENCE METHOD APPLIED TO CONSOLIDATION ANALYSIS OF EMBANKMENTS
This study presents the development of the finite difference method applied to consolidation analysis of embankments. To analyse the consolidation of the embankment as real as possible, the finite difference method in two dimensional directions was performed. Existing soils under embankments have varying stresses due to stress history and geological background. Therefore, Skempton’s parameter “A” which is a function of vertical stresses was taken into account in this study. Two case studies were chosen to verify the proposed method. It is found out that results obtained from the proposed method agree with either recorded data or results solved using another solution