Jurnal Optimasi Sistem Industri

Jurnal Optimasi Sistem Industri
Not a member yet
    252 research outputs found

    Integrasi Frame Work Risk and Insurance Management Society (RIMS) dalam Analisis Kematangan Implementasi Manajemen Risiko (Studi Kasus: PLTA Maninjau)

    Get PDF
    Indonesia electrical energy consumption growth that reached 9.2% per year requires every plant to always pursue consistent and sustainable improvement to be able to cope with the growth. Maninjau Hydropower is one of the assets of strategic energy resources to meet the electrical energy supply, especially for the southern Sumatera region. Risk management in Maninjau hydropower take place without any standard of measurement standards, so management and risk management actors do not have an overview and guide to improve the performance of the risk management activities. In this study, a standard measure used is to measure the level of maturity of the risk management implementation using the framework of the Risk and Insurance Management Society (RIMS) for Enterprise Risk Management (ERM). Measurements carried out for the realization of the value and the expected value of risk management implementation in Maninjau hydropower, as well as designing the evaluation chart implementation of risk management by integrating Key Risk Indicators (KRI) from the expected value. Based on the results of the measurements made, it was found that the actual implementation of risk management in Maninjau hydropower located on the third level (repeatable), while the implementation of the expectation value is found to be at the highest level (leadership), and the percentage achieving overall expectation value has reached 62%. The draft also raises the risk evaluation chart 15 Key Risk Indicators to be achieved by Maninjau hydropower to achieve the expected value at the leadership level

    Pengembangan Model Economic Production Quantity (EPQ) dengan Sinkronisasi Demand Kontinu dan Diskrit Secara Simultan

    Get PDF
    The most popular inventory model to determine production lot size is Economic Production Quantity (EPQ). It shows enterprise how to minimize total production cost by reducing inventory cost. But, three main parameters in EPQ which are demand, machine set up cost, and holding cost, are not suitable to solve issues nowadays. When an enterprise has two types of demand, continue and discrete demand, the basic EPQ would be no longer useful. Demand continues comes from a customer who wants their needs to be fulfilled every time per unit time, while the fulfillment of demand discrete is at a fixed interval of time. A literature review is done by writers to observe other formulation of EPQ model. As there is no other research can be found which adopt this topic, this study tries to develop EPQ model considering two types of demand simultaneously

    Indikator Proses Utama pada Proses Grinding dengan Pendekatan Manajemen Pengetahuan

    Get PDF
    This study discusses about key process indicators in grinding with the knowledge management approach. Common/key indicators used in the machine are workpiece, grinding wheel, dressing tool and coolant. The resulting key processeswill benefit firms and their operators especially new ones in managing scienceson grinding process that will allow knowledge transferred to new operators quickly. Process indicators are described with IDEF0 diagrams which will define the inputs, outputs, mechanisms and controls

    Model Pemilihan Pemasok Bahan Baku Kelapa Parut Kering dengan Metode AHP (Studi Kasus PT. Kokonako Indonesia)

    Get PDF
    The selection of suppliers is a strategic activity, especially if the supplier will supply critical items and/ or will be used in the long term. Many factors need to be considered in the selection of suppliers. PT. Kokonako Indonesia is one of the companies of the Group are located in Medan Capella. There are weaknesses in the selection of suppliers conducted by PT. Indonesia Kokonako the decision maker for the purchase of raw materials which are not within specification diameter ≥ 10 cm. Therefore, this study aims to perform the selection of suppliers with the consideration of a more comprehensive and objective as needed. The first stage is carried out in order to represent the actual circumstances is to identify the criteria, sub-criteria, and alternatives that will be used in the selection of suppliers. There are 6 criteria, 13 subcriteria, and 4 alternatives used in the selection of suppliers for raw materials dried grated coconut. The second stage, the stage determines the method for the selection of suppliers. Based on the identification there are no dependencies between sub criteria. Therefore, the exact method used to determine the priority of suppliers to be selected is the method of analytical hierarchy process (AHP). By using the AHP, the priorities selected suppliers for raw materials are dried grated coconut and weighs 0.363 Tempuling District as a top priority. Followed by Sub Tembilahan with weights 0.268, third priority is the District Enoch with weights 0.213, and the last is the Sub Trunk Tuaka and weighs 0,157

    Identifikasi Risiko Kesehatan dan Keselamatan Kerja pada Pekerja Pengumpul Sampah Manual di Jakarta Selatan

    Get PDF
    Waste collection is one of the activities that should be performed on the waste management process. This activity can pose a potentially high risk given the dangers that may arise while direct contact with the garbage and activities conducted. This study aims to identify potential risks to the health and safety of workers garbage collector. The survey uses a structured questionnaire distributed to 25 the refuse collector randomly selected in Srengseng SawahJagakarsa, South Jakarta. Descriptive statistics were used to analyze the data collected. The garbage collectors who agreed on the use of personal protective equipment at work is approximately 64% or around 16 respondents. Musculoskeletal disorders suffered by respondents is around 19 people or roughly 76%. The Respondents who suffered puncture wounds as a result of did not use gloves were 23 respondents or approximately 92%. Wrist and lower back are the most common musculoskeletal disorder that affects approximately 23 respondents. Generally, workers require personal protective equipment in order to prevent and reduce accidents. Improvement measures should be always be done such as healthy behavior, use of personal protective equipment and the development of working methods based on ergonomic principles

    Penjadwalan Cement Mill Berbasis Minimasi Faktor Klinker dalam Proses Pembilasan dan Impor Klinker

    Get PDF
    PT Semen Padang is one of the cement companies in Indonesia. Cement production influenced by the number of demand, raw materials and the number of the available machine. The number of demand increases with a corporate capacity which keeps the company had to set an optimal production schedule. Scheduling production should be followed by the availability of raw materials (clinker). The number of clinkers required influenced by the number of demands and clinker elapsed to the flushing process. Flushing process happens if the transition products produced from Non-OPC to a product OPC, for one flushing process causes clinker consumption 7% more than the existing capacity decreases. Deficient in a capacity covered by importing clinker which causes high-cost production. So, it necessary to make cement mill schedule by minimizing flushing process, so clinker that will be used become optimized. Steps that will be done in this study began with the survey system, identify problems, and data collection. Data collected are machine cement mill and kiln capacity, demands, and flushing process. Then designed a formulation model that minimizes clinker factor and the number of clinker imports needed, so that obtained scheduling machine cement mill to produce OPC and Non-OPC. Results obtained by reducing the number of flushing process because the cement mill designed to produce one type of product per day, so the flushing process could happen if there is transition cement production Non-OPC on the day-i to cement OPC on the day i+1. Cement OPC produced by Indarung II, III, and V. Indarung IV only produced cement Non-OPC, so the flushing process happened in Indarung II, III, and V

    Usulan Strategi Pengembangan Industri Pengolahan Kelapa Skala IKM di Kabupaten Indragiri Hilir

    Get PDF
    The majority of the population in Indragiri Hilir (Inhil) already rely on palm plantations as the main income. They have already sold in the form of coconut oil and copra round with a relatively low price and is unable to provide a decent life. It is increasing because of the low level of productivity of coconut plantations and commercial systems that are less profitable for farmers. While in other areas of the coconut is a commodity that can be processed into a wide range of high-value products with simple technologies that can be done by small and medium industries. So, we need development strategies IKM-scale oil processing industry which is able to increase the income of coconut farmers in the district of Inhil. Based on the results of research conducted by the method of SWOT analysis produced 23 alternative strategies of the development of the SME scale oil processing industry in Kabupaten Inhil ie three strategies from SO, nine strategies from WO, seven strategies from ST, four strategies from WT. Based on the results of the weighting using Analytical Network Process (ANP) on any alternative strategy, Strategy SO-2 namely "Guaranteeing the purchase of products manufactured by the community or the SME by the government and the government must provide the processing industry continued to improve the quality standards that prompted the market to products produced by the community/SME "is a priority under the development strategy of IKM-scale oil processing industry in the District Inhil

    Analisis Ketidaksesuaian Produk Air Minum dalam Kemasan di PT Amanah Insanillahia

    Get PDF
    Nowadays, the development of industry is increasing very rapidly. It can be known as the high competition between companies. Not only large and international scaled companies, small and medium-sized companies are also facing the same challenges in the global competition. Therefore, the companies need to conduct a quality control to maintain the quality of products produced and to achieve the conformance to specifications of product that has standardized by the company policies in order to improve the customer satisfaction. PT Amanah Insanillahia is a company involved in the bottled water industry. Based on the preliminary study, it shown the quality control only conducted to check the number of defective products produced without further evaluation and analysis. Therefore, there is a need to analyze the data of defective products produced and evaluate the results. The purpose of this study is to analyze the nonconformity product of the bottled water 600 ml brand PRIM-A. The p-chart is used in this research to analyze the number of defective products. Then, the fishbone diagram is used to analyze the causes of defective products. The results show that there is no data out of the control limits and mostly the data near in the central line of the p-chart. Using the fishbone diagram, it concluded that factors of man, machines, materials, methods, and environment are the causes of nonconformity products of the bottled water 600 ml brand PRIM-A. It is hoped this study will beneficial for the company to improve the product quality as well as to increase the customer satisfaction.&nbsp

    Perancangan Sistem Penunjang Keputusan Investasi Daerah Berbasis Webgis di Provinsi Sumatera Barat (Studi Kasus Badan Koordinasi Penanaman Modal Provinsi Sumatera Barat)

    Get PDF
    The implementation of decision support system will be applied to support the regional investment of West Sumatera by providing a feasibility study analysis; exclusively the aspects of economic and financial criteria. This research was carried out in West Sumatera Regional Investment Coordinating Board as the authorities of regional investment licensing and controlling. The first step in designing a decision support system is conducting Pre – Study. It consists of literature study and pre–design study related to the field of study. Next step is using Unified Modeling Language (UML) method to provide, represent and visualize the system. The basic model of the financial feasibility study is implemented by using the predetermined assumption as the scope of the best system performance. The system design which is implemented uses the Web and GIS concept. Otherwise, the expected result from the research is the application is able to calculate the basic data from financial feasibility aspect into needed information in order to analyze the feasibility of any investments. The result should be converted into Net Present Value, Benefit Cost Ratio, Internal Rate of Returns, and Payback Period value. The last step of the research is verification and validation in order to make sure the ability of application accommodating the pre -design system requirements. The result of verification and validation is able to accommodate the pre -designsystem requirements conclusively

    Rancang Bangun Sistem Informasi Logistik

    Get PDF
    The purpose of this study to design a logistics management information system, which is able to overcome the problem of delay in sending information data items. This information system is designed to be easier to manage enterprise data, and makes all job become more effective and efficient. One of the conveniences one would be given through this information system is in search for an information about an item because all the data items will be recorded for inclusion into the database so that the information search an item will be easy and fast

    244

    full texts

    252

    metadata records
    Updated in last 30 days.
    Jurnal Optimasi Sistem Industri
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇