Repositorio Institucional Universidad Nacional de Ingeniería
Not a member yet
    28561 research outputs found

    Dimensionamiento e implementación de un sistema de almacenamiento de alta disponibilidad para la empresa agrícola Challapampa

    Get PDF
    Agrícola Challapampa S.A.C. es una empresa agroexportadora que se dedica al proceso de la producción, procesamiento y exportación de la uva. Actualmente, los servidores virtuales en donde están instalados los servicios críticos trabajan sobre un sistema de almacenamiento, que no cuenta con soporte local, tiempo de garantía de los equipos expirado, no tiene suficiente espacio de almacenamiento en disco duro y no cuenta con un sistema de alta disponibilidad, que permita soportar fallos en los componentes de hardware lo que genera tiempos de inactividad de los servicios. Por otro lado, los procesos de backups o respaldos de los servidores críticos son guardados en un sistema de almacenamiento, que tiene las mismas condiciones descritas anteriormente; eso quiere decir, que cualquier falla en el hardware generará pérdidas económicas para la empresa. Ante ello, se propone el dimensionamiento e implementación de una nueva arquitectura de almacenamiento basada en el empleo de un sistema de alta disponibilidad denominada SAN (Storage Area Network), la cual asegure la continuidad de los servicios, una disminución en los tiempos de proceso de backup y una mayor velocidad de comunicación en la red LAN (Local Area Network). Se concluye que una implementación de una red SAN con equipos redundantes en componentes de hardware permite incrementar la disponibilidad de servicios de cualquier empresa.Agrícola Challapampa S.A.C. is an agro-export company that is dedicated to the production, processing and export of grapes. Currently, the virtual servers where the critical services are installed work on a storage system that does not have local support, the equipment's warranty period has expired, it does not have enough hard disk storage space and it does not have a backup system. high availability, which allows failures in hardware components to be supported, which generates downtime of services. On the other hand, the backup processes of critical servers are saved in a storage system, which has the same conditions described above; that means that any hardware failure will generate economic losses for the company. Given this, the sizing and implementation of a new storage architecture based on the use of a high availability system called SAN (Storage Area Network) is proposed, which ensures the continuity of services, a reduction in storage process times. backup and higher communication speed on the LAN (Local Area Network). It is concluded that an implementation of a SAN network with redundant equipment in hardware components allows increasing the availability of services for any company.Trabajo de suficiencia profesiona

    Dimensionamiento e implementación de una red de servicio celular 3G Indoor en la banda de 1900MHZ del operador Movistar en el edificio de la sede principal del Banco de la Nación

    Get PDF
    La actual indagación radica en el requerimiento de mejorar la calidad del servicio celular de voz y datos en el interior del edificio del Banco Nación. Este trata el dimensionamiento y acoplamiento de la red celular indoor de acceso 3G en la banda de 1900 Mhz del operador Movistar en el interior del edificio general del Banco de la Nación. Para esta labor se dimensionó la magnitud de sectores para cubrir toda la zona del edificio y se realizó el estudio de la propagación de la red celular dentro del edificio mediante el empleo del software Ibwave lo que permitió definir las ubicaciones de las diversas antenas para cubrir la totalidad del edificio. Posteriormente se realizó la fase de implementación del proyecto con la instalación de las antenas y se procedió a una etapa de testeos con el fin de validar la labor de lo implementado.The current indagation lies in the requirement to improve the quality of the cellular voice and data service inside the Banco Nación main headquarters building. This deals with the sizing and coupling of the indoor 3G access cellular network in the 1900 Mhz band of the Movistar operator inside the general building of the Banco de la Nación. For this task, the magnitude of sectors was sized to cover the entire area of the building and the study of the propagation of the cellular network within the building was carried out using the Ibwave software, which allowed defining the locations of the various antennas to cover the entire building. Subsequently, the implementation phase of the project was carried out with the installation of the antennas and a testing stage was carried out in order to validate the work of what was implemented.Trabajo de suficiencia profesiona

    Modernización de sistema de excitación y protección en motores síncronos de 3000 HP y 9000 HP; 6.9 kV en la Compañía Minera Southern Perú

    Get PDF
    El sistema de excitación y protección de los motores que accionan los molinos de la etapa de Molienda, ubicados en la planta concentradora de la mina Cuajone, tenían mucho tiempo de antigüedad y requerían un proyecto de mejora y modernización con la finalidad de mejorar la calidad y confiabilidad de la operación del proceso minero. Luego de una evaluación técnica y económica se opta por reemplazar los sistemas de excitación de los motores, así como los respectivos tableros de maniobra y protección para motores síncronos de 3000 Hp y 9000 Hp. Para ello se realizó la selección de los equipos, su integración al sistema de la mina y una adecuada configuración, para lograr los objetivos del proyecto. De esta manera se tendrá una operación con mayor seguridad y eficiencia en el funcionamiento de los motores.The excitation and protection system of motors that drive the mills of the Grinding stage, located in the concentrator plant of the Cuajone mine, were very old and required an improvement and modernization project in order to improve quality and reliability of the operation of the mining process. After a technical and economic evaluation, it was decided to replace the motor excitation systems, as well as the respective control and protection switchgears for 3000 Hp and 9000 Hp synchronous motors. For this, the selection of the equipment was carried out, its integration into the mine system and an adequate configuration, to achieve the project objectives. In this way there will be an operation with greater safety and efficiency in the operation of the engines.Trabajo de suficiencia profesiona

    Estudio espectro-electroquímico de catalizadores tipo espuma decorados con nanoestructuras de Ni y NiMo aplicados en la producción de hidrógeno verde

    Get PDF
    El almacenamiento de energía como un vector químico de alto impacto (e.g, H2 verde, CH3OH, NH3, H2O2, entre otros) representa una de las principales estrategias de descarbonización industrial en la actualidad. Específicamente, el H2 verde obtenido a partir de la electrólisis alcalina del agua (EAA) simboliza una de las principales rutas capaz de sustituir a los combustibles fósiles. Sin embargo, su desarrollo es limitado por los elevados costos de producción debido a la inclusión de metales nobles, por ej., Pt, Pd, Ru e Ir. Por ende, el desarrollo de sistemas catalíticos basados en metales de transición no nobles, tales como, el Ni, Fe, Mo, Cu y/o Co es prioritario para impulsar el escalamiento de las tecnologías a base de H2. En este sentido, la presente investigación doctoral desarrolla el diseño y estudio de matrices electroactivas tipo-espuma decoradas con nanoestructuras (NEs) de NiO(OH)x o NixMoy para promover la reacción de evolución de hidrógeno (HER). La investigación se divide en cinco etapas: (i) tratamiento por “decapado anhidro” de las matrices de tipo-espuma de Ni (NiF) en su activación superficial (NÍFA), (ii) análisis fisicoquímico y evaluación electroquímica ex-situ e in-situ de los electrodos NiF y NÍFA en la HER; (iii) decorado de los catalizadores NÍFA con NEs de NiO(OH)x o NixMoy; (iv) el estudio ex-situ e in-situ de los electrodos obtenidos en la HER mediante el uso de la espectroscopía Raman in-situ y la espectrometría de masas diferencial electroquímica (DEMS), y (v) prueba de estabilidad electroquímica de los sistemas mencionados. Entre los principales alcances se reporta que el “decapado anhidro” fragmenta la superficie de las matrices NiF, reduce la capa externa de a-Ni (OH)2, expone la capa interna metálica de Ni/NiO, y reduce el sobrepotencial de 45,7 a 6,2 mV en la HER. Por su parte, los electrodos NiO(OH)x/NiFA y NixMoy/NiFA registran partículas de 400 nm y 70 nm soportadas en la superficie NiFA. Particularmente, los electrodos NixMoy/NiFA revelan un ligero desplazamiento en los picos de difracción de Ni asociados a la expansión de la red cristalina de Ni por la inserción de átomos de Mo (agente dopante). Este efecto eleva la densidad de sitios activos, reduce el sobrepotencial de HER (~0,1 mV), promueve una electrocinética de dos etapas (Volmer-Heyrovsky) determinada por la electro-desorción de los hidronios anclados [M-H], y eleva la estabilidad electroquímica del NiFA en la HER. Con lo cual, los NixMoy/NiFA demuestran un carácter catalítico competitivo frente a los catalizadores comercial de Pt/C.Energy storage as a chemical vector with high energy and power density, e.g., ethanol, ammonia, hydrogen peroxide, or green hydrogen (GH2), represents a promising zero-carbon route to promote the energy transition at the industrial scale, nowadays. Specifically, GH2 gas obtained by the alkaline water splitting (AWS) has become the main energy vector able to replace fossil fuels, however, its extensive application is limited by the high cost of production, related to the use of noble metal-based catalysts (e.g., Pt, Pd, Ru and Ir) during the reaction. Thus, the development of catalytic systems based on non-noble transition metals, such as Ni, Fe, Mo, Cu, or Co, is a priority to the impulse of the H2-based technologies. Herein, the design and study of electroactive systems based on NiO(OH)x- or NixMoy-decorated Ni-foam materials able to promote the hydrogen evolution reaction (HER) towards green hydrogen production are performed. The doctoral research is carried out in 5 steps: (i) the chemical activation of Ni-foam electrodes by an ultrasound-assited anhydrous etching to obtain activated Ni-foams (NÍFA) as electroactive support, (ii) physicochemical characterization, and electrochemical testing of NiF y NÍFA electrodes at ex-situ and in-situ conditions towards the HER, (iii) Heterogeneous growth of Ni- or NiMo-based nanoestructures on NÍFA surface, (iv) ex-situ and in-situ study of Ni- or NiMo-decorated NÍFA electrodes by Raman in-situ spectroscopy and Differential Electrochemical Mass Spectrometry (DEMS), and (v) electrochemical stability test of the prepared electrocatalysts towards the GH2 production. Among the main results, our research reports that the anhydrous etching brings forth a controlled fragmentation of the NiF surface reduces the external cover of a-Ni (OH)2, exposes the metallic internal Ni-based surface, and reduces the HER overpotential from 45.7 to 6.2 mV at low-current density towards the HER. Also, Ni- or NiMo-decorated NÍFA electrodes display supported particles of 400 an-70 nm of mean diameter, respectively. Mainly, NixMoy/NiFA electrodes show a slight displacement on their X-ray diffraction peaks attributed to a lattice expansion of the Ni lattice by the insertion of Mo atoms (doping agent). This fact raises the active site density which reduces the HER overpotential close to the thermodynamic value (~0,1 mV). In addition, the electro-desorption reaction of [M-H] is registered as the rate-determining step on the HER, high electrochemical stability, and a competitive catalytic behavior is displayed for NiMo-decorated NÍFA catalysts in contrast to commercial Pt/C catalyst.Tesi

    Interacción entre dos solitones del flujo neutrónico térmico en un reactor térmico unidimensional infinito

    Get PDF
    Los reactores nucleares han jugado un papel importante en las diferentes áreas de la sociedad ya sea en la parte energética, medica, militar, etc; en términos generales los reactores nucleares se pueden dividir en reactores de potencia y de investigación, a medida que la ciencia y la ingeniería avanzan los modelos de los reactores nucleares sea han hecho más óptimos para aprovechar de la manera más eficiente la energía nuclear de las fisiones que ocurren dentro del núcleo del reactor y a la vez hacer reactores más seguros durante su operación. Uno de los modelos de reactores nucleares planteados a finales de la década de los 90 el cual une las bases de un reactor simple con una teoría de dinámica no lineal es el modelo del Reactor Solitón (Seifritz, 1997). En este modelo debido a los procesos de fisión se obtiene una onda de quemado el cual es impulsada autocatalíticamente, lo que hace especial a este modelo es que sus distribuciones espaciales que caracteriza a un reactor como son: el flujo de neutrones, densidad de potencia y densidad de las partículas asociadas tienen características de una onda solitón. La teoría de solitones en las épocas actuales ha tomado un gran interés ya que han servido como modelos de teorías no lineales que proponen nuevos enfoques para explicar la realidad. Las tres características que definen a un solitón son las siguientes: son ondas cuya amplitud es proporcional a la velocidad, son ondas que no obedecen el principio de superposición y la característica principal es que son ondas estables que pueden viajar sin cambiar su forma y su energía. En este trabajo de investigación se trabajará con un reactor térmico unidimensional de dimensión infinita en el cual se puede demostrar aproximadamente la existencia de una solución solitón para el flujo de neutrones al desarrollar la ecuación de difusión del reactor. En diferentes modelos en donde existe una solución solitón es posible encontrar la interacción de dos solitones del modelo que forman un estado ligado, el objetivo de este trabajo será hallar la interacción de dos solitones para el flujo de neutrones que forman un estado ligado, para ello será necesario encontrar la Densidad Lagrangiana que caracteriza a la ecuación de difusión y a partir de esta Densidad Lagrangiana encontrar su Tensor de Energía - Momento el cual nos ayudara a encontrar la interacción entre los solitones del modelo.Tesi

    Propuesta y aplicación metodológica de un mecanismo de obras menores por impuestos ante una situación de emergencia, para el sector educación

    Get PDF
    La presente investigación plantea una propuesta metodológica que sirva para ejecutar obras menores, en los centros educativos a nivel nacional, mediante obras por impuestos. Para ello, se ha planeado una hipótesis, la cual propone que se puede mejorar la productividad y el tiempo de respuesta ante una emergencia mediante la aplicación de un nuevo mecanismo de ejecución de obras de menor escala a través del pago de impuestos. Así mismo, el responsable de la investigación ha desarrollado un método de gestión de obras menores por impuestos, basándose en la teoría y técnica del “Manual de ejecución de obras por impuestos (OxI)”, con el propósito de extraer las buenas prácticas de una de las herramientas más dinámicas que nuestro país tiene para llevar a cabo proyectos de alto impacto social. Es preciso mencionar que, esta investigación ha logrado aplicar su propuesta técnica en un contexto real de emergencia, específicamente en la situación de “Suspensión Del Servicio Educativo 2022 para la Reducción de Contagios por Covid-19”. De esta manera, su aplicación se llevó a cabo en el Colegio Virgen del Morro, ubicado en el distrito de Chorrillos; con recursos dinerarios y materiales de empresas privadas interesadas en participar en la reducción de brechas en infraestructura escolar. Durante su implementación, se han empleado herramientas tecnológicas, tales como el análisis de macrodatos y el diseño y construcción por computador, lo que ha otorgado resultados importantes que sustentan la hipótesis planteada. Después de aplicado el modelo de gestión, se ha obtenido resultados relevantes que responden a la problemática, ya que el Tiempo Promedio De Ejecución De Obras Por Impuestos ha llegado a ser de 75 días calendario en comparación de los aproximadamente 945 días que tiene un proyecto de Obra por Impuestos regular. Así pues, el Tiempo De Respuesta De La Emergencia se ha logrado reducir a 6 días hábiles, lo que significa una reducción de 8 días el tiempo de respuesta promedio que es de aproximadamente 14 días. Finalmente, dos de los resultados conceptuales más valiosos que se han logrado con esta investigación han sido, en primer lugar, la Reducción De La Brecha De Infraestructura crítica, ya que se ha ejecutado una obra en la segunda región con mayor demanda de infraestructura educativa, Lima. Y, por último, con la aplicación de este modelo de gestión se ha conseguido aumentar el Porcentaje Anual De Obras Por Impuestos Para El Sector Educación.The present investigation proposes a methodological proposal that serves to execute minor works, in educational centers nationwide, through works for taxes. To this end, a hypothesis has been suggested: productivity and response time in the event of an emergency can be improved through the application of a new mechanism for the execution of smaller-scale works through tax payment. Likewise, the person responsible for the research has developed a method for managing minor works for taxes, based on the theory and technique of the “Manual for the Execution of Obras por Impuestos (OxI). The purpose is to extract good practices from one of the most dynamic tools that our country has to carry out projects of high social impact. It is necessary to mention that this research has managed to apply its technical proposal in a real-life emergency context. It was the “Suspension of the Educational Service 2022 for the Reduction of Infections Due to COVID-19.” In this way, its application was carried out at the “Virgen del Morro” School, located in the district of Chorrillos. It was achieved with monetary and material resources from private companies interested in participating in reducing gaps in school infrastructure. During its implementation, technological tools have been used, such as big data analysis and computer design and construction. After applying the management model, relevant results have been obtained that respond to the problem. The average execution time of Obras por Impuestos has been done in 75 calendar days, compared to the approximately 945 days that a project lasts with regular method of Obras por Impuestos. Thus, the emergency response time has been reduced to 6 business days, which means a reduction of 8 days in the average response time, which is approximately 14 days. Finally, this research helped to reduce the critical infrastructure gap in Lima, which is the second most essential area for education. Ultimately, through the implementation of this management approach, it has been feasible to enhance the annual percentage of Obras por Impuestos for the education sector.Tesi

    Implementación de un programa de SBC para minimizar los accidentes e incidentes en perforación diamantina de los proyectos de exploración minera

    Get PDF
    Con esta investigación propusimos el objetivo: Determinar la influencia de la implementación de un programa de seguridad basado en el comportamiento para la reducción de accidentes e incidentes en perforación diamantina de los proyectos de exploración minera. Es una investigación aplicada de enfoque cuantitativo, de nivel explicativo, con diseño experimental, transeccional. La población fue de 24 trabajadores, encontrando que la influencia del programa de seguridad analizado con una línea base, revisada desde 2018 hasta 2022 donde se reconoció las características del trabajo en el área de Exploraciones de la empresa Nexa Resources en las unidades mineras de Atacocha y El Porvenir en Cerro de Pasco. Los resultados indican una influencia directa entre la implementación del Programa SBC y una reducción significativa en los accidentes incidentes y mejora del comportamiento y conocimiento. La efectividad del SBC que el comportamiento seguro creció en un 13%, así como el conocimiento se incrementó en un 0.28 y la ratio de la emocionalidad en un 0.55. Se requiere el compromiso permanente de los directivos en la identificación de riesgos, la sugerencia de mejoras y la aplicación del Programa SBC.With this research we proposed the objective: Determine the influence of the implementation of a safety program based on behavior to reduce accidents and incidents in diamond drilling of mining exploration projects. It is applied research with a quantitative approach, at an explanatory level, with an experimental, transectional design. The population was 24 workers, finding that the influence of the safety program analyzed with a baseline, reviewed from 2018 to 2022 where the characteristics of the work in the Exploration area of the company Nexa Resources in the mining units of Atacocha and The Future in Cerro de Pasco. The results indicate a direct influence between the implementation of the SBC Program and a significant reduction in incident accidents and improvement in behavior and knowledge. The effectiveness of the SBC that safe behavior increased by 13%, as well as knowledge increased by 0.28 and the emotionality ratio by 0.55. The permanent commitment of managers is required in identifying risks, suggesting improvements and applying the SBC Program.Tesi

    Influencia del polvo de vidrio reciclado en la reducción del uso de cemento en los concretos de ultra alta resistencia (UHPC)

    No full text
    Uno de los grandes problemas existentes al momento de la elaboración de los concretos de ultra alta resistencia (UHPC) es la enorme cantidad de material cementante que estos requieren, este problema no está únicamente relacionado al costo de estos insumos, sino también, a la gran cantidad de CO2 que se genera al momento de su producción. A su vez, se observa en el mercado peruano una gran oportunidad para la generación de polvo de vidrio reciclado, debido a la gran cantidad de vidrio que se mueve en el mercado del reciclaje, esto junto a su alto contenido de sílice y su bajo costo, lo hace candidato para reemplazar a los materiales cementantes del UHPC. Por el problema antes expuesto la presente investigación plantea determinar la influencia del polvo de vidrio reciclado en la reducción del uso de cemento para los UHPC. Para este fin se realizó un diseño de mezcla patrón y otros adicionados con polvo de vidrio reciclado en reemplazo del cemento en porcentajes de 10 %, 20 % y 30 %. El proceso de diseño de mezcla se inició con la aplicación del Modelo Modificado de Andreasen y Andersen (MAA) junto con los ensayos previos para determinar la composición ideal de la mezcla de UHPC. Posteriormente se elaboraron todas las muestras para los ensayos a realizar, dentro de las cuales se tienen a los cubos para la resistencia a la compresión a las edades de 3, 7, 28 y 56 días; las vigas para la resistencia a la flexión a los 28 días; y los paralelepípedos rectangulares para los ensayos de absorción, densidad, porcentaje de vacíos y la medición de las propiedades térmicas de las muestras a los 28 días. Como resultado de los ensayos en concreto fresco y endurecido, se obtuvo que la adición de polvo de vidrio reciclado en reemplazo del cemento influyó en las propiedades de los UHPC tanto en estado fresco como endurecido. Para el ensayo de temperatura se determinó un aumento de 26.4ºC a 29ºC, 28.4ºC y 29.5ºC para los porcentajes de reemplazo de 10 %, 20 % y 30 % respectivamente, a su vez el ensayo de consistencia presentó un valor anómalo debido a que para el porcentaje de 10 % de reemplazo hubo una disminución del 41.2 % a 20.1 % mientras que para el 20 % y 30 % se lograron valores de 101.8 % y 111.6 %. Finalmente, el tiempo de fragua presentó una disminución empezando con 268 minutos para la muestra patrón y con los valores de 253, 235 y 218 minutos para las muestras con los porcentajes de reemplazo anteriormente especificados. Para el ensayo de compresión se obtuvo una curva cóncava hacia abajo con valores que fueron desde los 1219 kg/cm2 para la muestra patrón hasta los 1328 kg/cm2, 1231 kg/cm2 y 1100 kg/cm2 de resistencia para las muestras adicionadas respectivamente a los 28 días. La resistencia a la flexión varió desde 183 kg/cm2 para la muestra patrón, hasta 200 kg/cm2, 183 kg/cm2 y 168 kg/cm2 para las muestras adicionadas respectivamente. Seguidamente, se observó una reducción de la porosidad cercana al 15 % del valor patrón que fue de 2.85 %. Finalmente, se observó que el material perdía propiedades aislantes respecto del patrón.One of the significant challenges in the development of Ultra High-Performance Concrete (UHPC) is the substantial amount of cementitious material it requires. This issue is not only related to the cost of these inputs but also to the substantial CO2 emissions generated during their production. Simultaneously, there is a considerable opportunity in the Peruvian market for the utilization of recycled glass powder, given the large volume of glass in the recycling market, its high silica content, and low cost. These factors make it a viable candidate to replace the cementitious materials in UHPC. Due to the aforementioned problem, this research aims to determine the influence of recycled glass powder on reducing the use of cement in UHPC. To achieve this, a standard mix design was developed, along with additional mixes incorporating recycled glass powder to replace cement at percentages of 10 %, 20 %, and 30 %. The mix design process began with the application of the Modified Andreasen and Andersen (MAA) Model, along with preliminary tests to determine the ideal composition of the UHPC mix. Subsequently, all the samples were prepared for the planned tests, including cubes for compressive strength at 3, 7, 28, and 56 days; beams for flexural strength at 28 days; and rectangular prisms for absorption, density, void percentage, and thermal property measurements at 28 days. Results from tests on both fresh and hardened concrete revealed that the addition of recycled glass powder as a replacement for cement influenced the properties of UHPC in both states. In the temperature test, an increase from 26.4ºC to 29ºC, 28.4ºC, and 29.5ºC was determined for replacement percentages of 10 %, 20 %, and 30 %, respectively. Additionally, the consistency test exhibited an anomalous value, as the 10 % replacement resulted in a decrease from 41.2 % to 20.1 %, while values of 101.8 % and 111.6 % were achieved for 20 % and 30 % replacements. Finally, the setting time decreased from 268 minutes for the standard sample to 253, 235, and 218 minutes for samples with the specified replacement percentages. In the compression test, values described a concave downward curve ranging from 1219 kg/cm2 for the standard sample to 1328 kg/cm2, 1231 kg/cm2, and 1100 kg/cm2 for the respective replacement samples at 28 days. Flexural strength varied from 183 kg/cm2 for the standard sample to 200 kg/cm2, 183 kg/cm2, and 168 kg/cm2 for the replacement samples, respectively. Additionally, a reduction in porosity was observed, approaching 15 % of the standard value of 2.85 %. Lastly, it was noted that the material lost insulating properties compared to the standard.Tesi

    Gestión administrativa para la continuidad del proyecto "Construcción de la represa de Potaga" formulado en el marco del SNIP

    Get PDF
    El resumen de este trabajo es describir los procedimientos administrativos que se realizaron para darle continuidad al proyecto “Construcción de la represa Potaga”, meta III, formulado en el marco del SNIP, describiendo los documentos que se generaron para la actualización en el banco de inversiones del MEF y actualización en los formatos de seguimiento del invierte.pe para su incorporación como no prevista en la Programación Multianual de Inversiones (PMI), a fin de que se le asigne presupuesto para su reinicio. El presente trabajo de suficiencia profesional propone los procedimientos que se puede seguir para la reactivación y/o continuidad de un proyecto de inversión que haya sido formulado en el marco del SNIP y que a la fecha se encuentre paralizada siguiendo los lineamientos establecidos en el Directiva N°001-2019-EF/63.011 y conocimientos adquiridos en la práctica respecto a procedimientos que no están normados ni regulados que se obtuvo a través de reuniones con diferentes especialistas de inversiones y especialistas en registro en el banco de inversiones. Esta propuesta inicia con las actividades desarrolladas durante el periodo de paralización, con la búsqueda de información principalmente de las valorizaciones, cuaderno de obra y expediente técnico, con el fin de poder constatar la información que se tiene registrada en sistema para luego constatar in situ el estado real de la inversión el cual será fundamental ya que dependiendo del informe se constatará lo realmente ejecutado con el gasto realizado. Con la información real se realizó las gestiones administrativas para el financiamiento para su continuidad; se proyectó los informes para la actualización en el banco de inversiones y los aplicativos que es el formato 12°B e Infobras, asimismo, se elaboró el informe para la incorporación del proyecto en la Programación Multianual de Inversiones como inversión no prevista en el año 2020. Luego se describe las actividades que se realizaron cuando el proyecto reinicio, que consistió con la revisión de los informes mensuales de la valorización presentadas por el Supervisor de obra y el Contratista del proyecto, seguimiento a la actualización del Formato N°12b dentro de los 10 primeros días del mes siguiente que corresponde la valorización, seguimiento a la actualización del Infobras y los trámites administrativos para la conformación del comité de recepción del proyecto.The summary of this work is to describe the administrative procedures that were carried out to give continuity to the project "Construction of the Potaga Dam", goal III, formulated within the framework of the SNIP, describing the documents that were generated for the update in the MEF investment bank and update in the follow-up formats of invierte.pe for its incorporation as not foreseen in the Multiannual Investment Programming (PMI), so that a budget is assigned for its restart. This professional sufficiency work proposes the procedures that can be followed for the reactivation and/or continuity of an investment project that has been formulated within the framework of the SNIP and that is currently paralyzed following the guidelines established in Directive No. 001-2019-EF/63.011 and knowledge acquired in practice regarding procedures that are not regulated or standardized that was obtained through meetings with different investment specialists and specialists in registration at the investment bank. This proposal begins with the activities developed during the period of stoppage, with the search for information mainly on appraisals, work log and technical file, in order to verify the information that is registered in the system and then verify in situ the real status of the investment, which will be essential since depending on the report, it will be verified what was actually executed with the expense incurred. With the real information, the administrative procedures for financing for its continuity were carried out; The reports for updating in the investment bank and the applications, which are format 12°B and Infobras, were projected. Likewise, the report for the incorporation of the project in the Multiannual Investment Programming as an investment not foreseen in 2020 was prepared. The activities that were carried out when the project restarted are then described, which consisted of the review of the monthly reports of the valuation presented by the Construction Supervisor and the Contractor of the project, follow-up to the update of Format No. 12b within the first 10 days of the following month corresponding to the valuation, follow-up to the update of Infobras and the administrative procedures for the formation of the project reception committee.Trabajo de suficiencia profesiona

    Implementación del sistema primario de calibración de medidores de caudal de líquidos por el método de pesada estática, bajo el esquema de la ISO 17025:2017

    Get PDF
    El presente trabajo explica la implementación de la norma ISO/IEC 17025:2017 en el Sistema de Pesada estática para la calibración de medidores de caudal de líquidos en el Laboratorio de Flujo de Líquidos del INACAL, que sirvió de base para pasar con éxito la Revisión Par llevada a cabo por una reconocida experta del EURAMET, lo que se plasmó en la renovación de la competencia técnica del laboratorio ante el Sistema Interamericano de Metrología (SIM). Se desarrolla el enfoque de los mecanismos de aseguramiento de los resultados empleado por el laboratorio, en conjunto con los diversos aspectos técnicos, desde el equipamiento, hasta las comprobaciones intermedias de instrumentos. Adicionalmente, se estableció el modelo matemático y posterior implementación de las ecuaciones que rigen el error en calibración de las magnitudes de caudal másico y caudal volumétrico de líquidos con la proposición del modelo estándar de incertidumbre de la GUM y su validación numérica mediante el método de Monte Carlo. Al respecto, se presenta un análisis detallado del impacto de las magnitudes involucradas según las condiciones de medición y la respuesta del medidor calibrado. Finalmente, se completa el esquema con una mejor definición de la trazabilidad de la densidad del agua (la cual es empleada como líquido de trabajo) y la caracterización del sistema de desviación de caudal.This report explains the implementation of the ISO/IEC 17025:2017 standard in the Static Weighing System for the calibration of liquid flow meters at the INACAL Liquid Flow Laboratory, which served as the basis for successfully passing the Peer Review carried out by a recognized EURAMET expert, which resulted in the renewal of the laboratory’s technical competence before the Inter-American Metrology System (SIM). The approach to the results assurance mechanisms used by the laboratory is developed, in conjunction with the various technical aspects, from equipment to intermediate instrument checks. In addition, the mathematical model and subsequent implementation of the equations that govern the error in calibration of the magnitudes of mass flow and volumetric flow of liquids were developed with the proposal of the standard uncertainty model of the GUM and its numerical validation using the Monte Carlo Method. In this regard, a detailed analysis of the impact of the magnitudes involved is presented according to the measurement conditions and the response of the calibrated meter. Finally, the scheme is completed with a better definition of the traceability of the density of water (which is used as the working liquid) and the characterization of the flow diversion system.Trabajo de suficiencia profesiona

    5,116

    full texts

    28,561

    metadata records
    Updated in last 30 days.
    Repositorio Institucional Universidad Nacional de Ingeniería
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇