ROAR: Repository for Open Access, Archives, and Research (Univ. of North Alabama)
Not a member yet
970 research outputs found
Sort by
Wilson Dam: High Water at Bridge from North Shore to Patton Island Gage below Dam
Depiction of high water at bridge from north shore to Patton Island Gage below the Wilson Dam in Florence, Alabama.https://roar.una.edu/mcdonald_images/1070/thumbnail.jp
Wilson Dam Lock Gate
View of the Wilson Dam lock gate.https://roar.una.edu/mcdonald_images/1082/thumbnail.jp
Wilson Dam: Temporary H.T. Switching Equipment East of O.C.B. Building
View of the temporary H.T. switching equipment east of O.C.B. building at Wilson Dam.https://roar.una.edu/mcdonald_images/1121/thumbnail.jp
Wilson Dam Lock Construction
View of the construction of Wilson Dam locks.https://roar.una.edu/mcdonald_images/1112/thumbnail.jp
Wilson Dam, September 22, 1928
View of railroad track and workers associated with the Wilson Dam.https://roar.una.edu/mcdonald_images/1133/thumbnail.jp
Wilson Dam: Water Through Spillway
View of water passing through spillway at Wilson Dam.https://roar.una.edu/mcdonald_images/1116/thumbnail.jp
Wilson Dam: Downstream Side of Powerhouse and Dam
General view of the downstream side of Wilson Dam and powerhouse.https://roar.una.edu/mcdonald_images/1100/thumbnail.jp
Wilson Dam: Upper End Lock #2, Bridge Raised to Pass First Boat
View of the upper end of Wilson Dam\u27s lock #2 with the bridge being raised to pass the first boat.https://roar.una.edu/mcdonald_images/1123/thumbnail.jp
Crane at Wilson Dam Construction
Enlarged photo of a crane used in the construction of Wilson Dam.https://roar.una.edu/mcdonald_images/1086/thumbnail.jp
Memorial Amphitheater, Florence State Teachers College
Construction on the Amphitheater began December 18, 1933, under the administration of Dr. Henry J. Willingham, and was completed in 1934. This work was completed by the Civil Works Administration.https://roar.una.edu/una_arch_images/1003/thumbnail.jp