Comillas

Comillas
Not a member yet
    32532 research outputs found

    TRABAJO DE FIN DE MÁSTER ACCESO A LA ABOGACÍA

    Get PDF
    Máster Universitario en Acceso a la AbogacíaEn este documento se harán dos informes: el primero a petición del Consejo de Administración de la Sociedad CIRTRONIC, el segundo solicitado por la Sra. Lidón y la Sra. Amparo, socias de la misma sociedad. En estos informes se analizarán las diferentes operaciones que la empresa realizará para ver cuáles son las mejores alternativas. Concretamente, la mejor forma de adquirir la marca de una empresa italiana (CIRCERÁMICA) y la posibilidad de trasladarse a Holanda para posteriormente fusionarse con una filial del socio VULTURE.In this paper two reports will be made: the first one attending the request of the Board of Directors of the Company CIRTRONIC, the second requested by Ms. Lidón and Ms. Amparo, partners of the same company. In these reports will be analyzed different operations that the company will carry out to see which are the best alternatives. Specifically, the best way to acquire the brand of an Italian company (CIRCERÁMICA) and the possibility of moving to the Netherlands to later merge with a subsidiary of the partner VULTURE

    Trabajo final de master. Especialidad empresa.

    No full text
    Máster Universitario en Acceso a la AbogacíaEl propósito del siguiente trabajo, que se encuentra dividido en dos dictámenes jurídicos, abordar diversas cuestiones societarias y mercantiles, desde dos puntos de vista diferentes. Por un lado, desde la posición de la propia sociedad para llevar a cabo los objetivos planteados por el órgano de administración y, por otro, de los socios minoritarios que se oponen a estas operaciones. Todo ello, en aplicación del ordenamiento jurídico español y la interpretación de la normativa de los Juzgados y Tribunales nacionales, pero sin soslayar la importancia que tiene la normativa europea y la interpretación que realiza el Tribunal de Justicia de la Unión Europea, dado que también forma parte del ordenamiento jurídico español. Entre las operaciones planteadas por el órgano de administración se encuentra la adquisición de una sociedad extranjera y la modificación internacional de domicilio social, se presentan diversas modalidades de articular estas operaciones, analizando las mismas en el primer dictamen. Por lo que respecta al segundo dictamen, nos centramos en las posibilidades de oposición de los socios minoritarios a las operaciones societarias y mercantiles que desea llevar a cabo la administración social, en específico, la oposición al traslado internacional de la sede societaria y la posibilidad de la existencia de un abuso por parte de la mayoría en la adopción de estos acuerdos.The purpose of the following work, which is divided into two legal opinions, is to address various corporate and commercial issues, from two different points of view. On the one hand, from the position of the company itself to carry out the objectives set by the administrative body and, on the other, from the minority partners who oppose these operations. All of this is in application of the Spanish legal system and the interpretation of the regulations of the national Courts and Tribunals, but without ignoring the importance of the European regulations and the interpretation made by the Court of Justice of the European Union, given that it also forms part of the Spanish legal system. Among the operations proposed by the administrative body are the acquisition of a foreign company and the international modification of the registered office, various ways of articulating these operations are presented, analyzing them in the first report. With regard to the second opinion, we focus on the possibilities of opposition by minority shareholders to corporate and commercial transactions that the corporate administration wishes to carry out, specifically opposition to the international transfer of the corporate headquarters and the possibility of the existence of an abuse by the majority in the adoption of these agreements

    Francisco Padialli Vega - TFM Especialidad Empresa

    No full text
    Máster Universitario en Acceso a la Abogacía.

    Proyecto de Ejecución de un Parque Eólico

    No full text
    Grado en Ingeniería en Tecnologías IndustrialesEJECUCIÓN DE UN PARQUE EÓLICO TERRESTRE – P.E. BUFADERO Autor: Cuñado Rodríguez, Laura. Director: Alonso Alonso, Consolación. Entidad Colaboradora: ICAI – Universidad Pontificia Comillas. RESUMEN DEL PROYECTO 1. Introducción Este proyecto se basa en el diseño y estudio de la ejecución de un parque eólico terrestre, el cual se sitúa en la isla de Gran Canaria y que abarca desde el análisis del recurso eólico y elección de la tecnología de aerogenerador más adecuada según el punto de vista de máxima producción de energía, hasta el diseño de las infraestructuras de obra civil e instalaciones eléctricas y el estudio de su impacto social y viabilidad económica. El proyecto consta de cuatro apartados diferenciados, entre los que se incluyen una Memoria descriptiva, Planos, Pliego de condiciones y Presupuesto, que además van acompañados de cuatro Anexos donde se detallan el estudio completo de micrositing, los cálculos para el diseño de la red de Media Tensión, el estudio de viabilidad económico y los objetivos de desarrollo sostenible. 2. Definición del Proyecto Tras realizar un amplio estudio de la normativa vigente para la implantación de parque eólicos en el territorio español y del recurso eólico disponible, se ha elegido como emplazamiento para realizar el estudio objeto de este proyecto un terreno llano que se encuentra en la isla de Gran Canaria, muy próximo a los barrios de Vecindario y Arinaga, pertenecientes a los municipios de Santa Lucía de Tirajana y Agüimes. El primer paso ha sido realizar el estudio completo del recurso eólico, para lo que se ha utilizado el software “Windographer”, que realiza un análisis estadístico-descriptivo de los datos de viento brutos recogidos mediante una torre anemométrica situada en el emplazamiento y cedidos por la empresa Vortex, para obtener una serie de datos de viento a la altura de buje deseada, en este caso 120m. Posteriormente, se ha implementado el software “WAsP”, que ha permitido realizar la simulación del campo de viento, en cada una de las posiciones de los aerogeneradores y para cada tipo de tecnología estudiada (Vestas, Siemens Gamesa y General Electric), y el cálculo energético del parque eólico. Una vez seleccionada la tecnología que se implantará en el parque, aquella que muestre un mayor compromiso entre la cantidad de energía inyectada a la red y el coste, se ha realizado la descripción detallada de las características del parque eólico, así como el diseño de la obra civil (cimentación de aerogeneradores, viales y zanjas para cableado) y el de la instalación eléctrica (red de puerta a tierra, red de Media Tensión, dimensionado de cables y diseño del Centro de Control), para permitir la conexión de las distintas líneas de generación del parque con el Centro de Control (CC). Desde el CC, la energía será transportada, en este caso a 30 kV, a la Subestación de conexión a la red más cercana. Todo este proceso se ha hecho siguiendo la normativa pertinente para cada apartado y descrita en el Documento 3 – “Pliego de Condiciones”. También, se ha realizado un presupuesto de la ejecución del proyecto y su análisis de viabilidad económica pertinente, junto con el desarrollo de planos descriptivos de la instalación eléctrica y obra civil presente en el parque eólico. Por último, se ha desarrollado una valoración de la implantación de los objetivos de desarrollo sostenible en el proyecto, los cuales se han detallado en el Anexo IV. 3. Descripción del modelo/sistema/herramienta En este proyecto se han empleado dos softwares. En primer lugar, se ha utilizado la herramienta “Windographer” para realizar un análisis estadístico-descriptivo del recurso eólico, a través de datos de dirección y velocidad del viento a diferentes alturas. Este programa permite conocer parámetros estadísticos de la distribución del viento en el emplazamiento, así como la dirección dominante y frecuencia del viento a la altura de buje del aerogenerador y sus intensidades de turbulencia. El otro software utilizado en la realización del proyecto es “WAsP” que, conociendo el modelo orográfico del emplazamiento y los datos de viento, calcula el viento geostrófico, aquel libre de perturbaciones debidas a la orografía u obstáculos presentes en el emplazamiento y que permite realizar una simulación completa del comportamiento del viento en el emplazamiento y la estimación de la energía producida por el parque eólico. 4. Resultados y Conclusiones Del análisis estadístico descriptivo de los datos de viento se ha obtenido que la dirección predominante del viento en el emplazamiento es noreste y que la velocidad media del viento extrapolada a la altura de buje es de 8.29 m/s. Tras la simulación del campo de vientos y el cálculo energético del parque eólico se ha concluido que la mejor tecnología a implantar es Vestas, con el modelo de aerogenerador V162 y 5.6MW de potencia nominal, por ser la tecnología que mayor cantidad de energía inyecta a la red. El parque eólico Bufadero, estará formado, por tanto, por siete aerogeneradores Vestas. La inyección anual de energía a la red se estima en 152.720 kWh, con los aerogeneradores funcionando 3896 horas equivalentes a plena y un factor de capacidad del 44.47%.DEVELOPMENT OF AN ONSHORE WIND FARM – P.E. BUFADERO Author: Cuñado Rodríguez, Laura. Supervisor: Alonso Alonso, Consolación. Collaborating Entity: ICAI – Universidad Pontificia Comillas. ABSTRACT 1. Introduction This project is based on the design and study of the execution of an onshore wind farm, which is located on the island of Gran Canaria. The project covers from the analysis of the wind resource and the choice of the most appropriate wind turbine technology according to the point of view of maximum energy production, until the design of the civil infrastructures, electrical installations, the study of their social impact and economic viability. The project is divided into four differentiated sections, including a descriptive report, plans, legal terms, and budget. It also includes four annexes which contains the complete Micrositing study, the calculations for the design of the Medium Voltage grid, the economic feasibility study, and the sustainable development objectives. 2. Project definition After carrying out an extensive study of the current law for the implementation of wind farms in Spain and of the available wind resource, a flat land located on the island of Gran Canaria has been chosen as the location of the wind farm. This location is placed very close to the neighborhoods of Vecindario and Arinaga, belonging to the municipalities of Santa Lucía de Tirajana and Agüimes. The first step has been to carry out the complete study of the wind resource using the Windographer software, which performs a statistical-descriptive analysis of the raw wind data collected by an anemometric tower located on the site and provided by the company Vortex, to obtain wind data at the desired hub height, in this case 120m. Subsequently, the “WAsP” software has been implemented to create a simulation of the wind field, in each of the wind turbine positions and for each type of technology studied (Vestas, Siemens Gamesa and General Electric), and to calculate the energy generated by the wind farm. Once the technology to be implemented in the wind farm is determined, the one that shows a greater compromise between the amount of energy injected into the power grid and the cost, a detailed description of the characteristics of the wind farm has been made, as well as the design of the civil works (foundations of wind turbines, roads, and cable trenches) and electrical installation (gate-to-ground grid, Medium Voltage grid, cable sizing and design of the Control Center). The electrical installation is going to allow the connection of the different lines of generation of the wind farm with the Control Center, from where the energy will be transported, in this case at 30 kV, to the nearest Electrical Substation. All this process has been done following the pertinent conditions for each section and described in Document 3 – Legal terms. Moreover, a budget and an economic feasibility analysis for the execution of the project has been made. It has been also developed descriptive plans of the electrical installation and civil works at the wind farm. Finally, an assessment of the implementation about sustainable development objectives has been made. This assessment has been developed in Annex IV. 3. Description of the model/system/toll Two specific software have been used in this project. In the first place, the Windographer tool has been used to carry out a statistical-descriptive analysis of the wind resource, through wind direction and speed data at different heights. This program allows to know statistical parameters of the wind distribution at the wind farm location, as well as the dominant direction, frequency, and turbulence intensities of the wind at hub height. The other software used to develop the project is WasP, which, knowing the orographic model of the wind farm location and the wind data, calculates the geostrophic wind. This type of wind it´s known as free from disturbances due to the orography or obstacles located at the wind farm and allows the development of the complete simulation of the wind behavior and the estimation of the energy produced. 4. Results & Conclusions From the descriptive statistical analysis of the wind data, it has been obtained that the northeast direction is the one that predominate the wind behavior, and the average wind speed extrapolated at hub height is 8.29 m/s. After the simulation of the wind field and the energy calculation with the WAsP program, it has been concluded that the best technology to implement is Vestas with the V162 wind turbine model and 5.6MW of nominal power, as it is the technology that injects the greatest amount of energy into power grid. The Bufadero wind farm will therefore consist of seven Vestas wind turbines. The annual injection of energy into power grid is estimated at 152.72 GWh, with the wind turbines operating 3,896 equivalent hours at full capacity and a capacity factor of 44.47%

    Los abuelos como referentes en el proceso de acogida

    No full text
    Grado en Trabajo SocialLa familia es el ámbito de protección y cuidado fundamental de las niñas y los niños, cubriendo sus necesidades físicas, psíquico-afectivas y sociales, procurando un desarrollo personal integral y ofreciendo unas relaciones seguras y confiables. Sin embargo, en ocasiones, los padres no ejercen el rol correspondiente para el cuidado de sus hijos, generando situaciones de riesgo para los niños que deben ser amparadas por el sistema de protección a los menores. El acogimiento familiar es una medida de protección fundamental en este sentido, configurándose los abuelos como referentes fundamentales en los acogimientos que se producen en familia extensa de la familia de origen. En este trabajo se definen qué es el acogimiento familiar y sus tipos, se cuantifica y se muestra el protagonismo del acogimiento familiar por parte de los abuelos, y se describe el desempeño profesional de los trabajadores sociales en estos procesos de acogimiento a partir del diseño de casos y la aplicación de sus respectivos informes sociales, diagnósticos técnicos y propuestas de intervención.The family is the responsible of protection and fundamental care of girls and boys, meeting their physical, psychic-affective and social needs, seeking comprehensive personal development and offering safe and reliable relationships. Sometimes, however, parents do not play the corresponding caring role, creating risky situations for children that must be protected by the child protection system. Family placement is a fundamental measure of protection in this regard. And the grandparents are the fundamental references figures when children are welcomed in extended family. This work defines what family placement is and its types, quantifies and shows the prominence of foster care by grandparents, and describes the professional performance of social workers in these processes, using cases design and implementation of their respective social reports, technical diagnoses and intervention proposals

    Predictive models at service of churn rate reduction

    No full text
    Artículos en revistasEl estudio del porcentaje de clientes o suscriptores que dejan de utilizar sus servicios durante un período determinado, conocido como churn rate, está permitiendo a las empresas detectar patrones de comportamiento asociados al deseo de permanencia de sus clientes. Una de las técnicas para la detección de patrones es la aplicación del Machine Learning asociado al uso de modelos de aprendizaje supervisados. Esta técnica se encarga de reconocer patrones en conjuntos de datos y extraer información o decidir acciones que realizar en base a dichos patrones. En el caso de la detección de abandono permite a la compañía abordar las estrategias de retención que considere pertinentes con el objetivo de evitar pérdidas económicas no deseadasThe study of the churn rate by companies, as a percentage of customers or subscribers who stop using their products or services during a certain period, is a common practice within a company. This study allows detecting behaviour patterns associated with whether the customer wants to stay or not. This detection of patterns can be done by using Machine Learning techniques related to the use of supervised learning models. This detection of abandonment will allow the company to address the retention strategies it considers relevant in order to avoid unnecessary economic losses.info:eu-repo/semantics/publishedVersio

    Observabilidad de las dinámicas de la multiplicadora de un aerogenerador basado en un generador de inducción doblemente alimentado

    Get PDF
    Grado en Ingeniería en Tecnologías IndustrialesEn los aerogeneradores basados en generadores de inducción doblemente alimentados, la turbina eólica y el generador de inducción están acoplados mecánicamente mediante una multiplicadora. La turbina eólica gira típicamente entre 10 y 40 revoluciones por minuto mientras que el rotor del generador de inducción gira alrededor de 1500 revoluciones por minuto. La caja multiplicadora es uno de los componentes mecánicos del aerogenerador más vulnerables y más sujetos a fallos. El fallo de una caja multiplicadora tiene gran impacto en la disponibilidad de un aerogenerador debido a la complejidad de su substitución. La detección incipiente del fallo en una caja multiplicadora es de gran relevancia económica. Y se realiza en la actualidad por medida de vibraciones mecánicas con sensores mecánicos apropiados. La instalación de sensores mecánicos de vibraciones es costosa. Una alternativa a la medida mecánica de vibraciones es analizar las corrientes del rotor tal y como son utilizadas por el control de los convertidores electrónicos. Este proyecto investiga la factibilidad de la monitorización de las vibraciones de las cajas multiplicadoras de los aerogeneradores basados en generadores de inducción doblemente alimentados analizando las corrientes del rotor utilizadas por el control de los convertidores electrónicos. Las dinámicas asociadas a la caja multiplicadora estarán caracterizadas por uno o varios modos de oscilación (autovalores del modelo lineal). La observabilidad de las dinámicas de la caja multiplicadora se estudiará mediante la respuesta en el dominio del tiempo y los residuos (producto de los factores de controlabilidad y observabilidad modal) de dichos autovalores desde las corrientes de rotor.In wind generators based on doubly fed induction generators, the wind turbine and the induction generator are mecanically coupled through a gear box. The rotation speed of the wind turbine is between 10 and 40 revolutions per minute whereas the rotation speed of the induction generators isa round 1500 revolutions per minute. The gear box is one of the most vulnerable mechanical components. The failure of the gear box has great impact on the availability of wind generators due to the complexity of the repair and even substitution process. The early detection of the failure of a gear box is economically very relevant. Currently, the early detection of the failure of gear box is addressed by measurement of mechanical vibrations with appropriate sensors. The installation of vibration sensors is very costly. An alternative to the use of vibration sensors is analyzing the rotor currents using in the converters control system. This project investigates the feasibility of monitoring vibrations in gear boxes of wind generators based on doubly fed induction generators by analyzing the rotor currents as they are used by the control systems of the power electrónico converters. The dynamics of the gear box are characterized by one or several modes (eigenvalues of the linear model). The observability of the gear box dynamics will be studied using the time response and the residues (expressed as the producto of the modal observability and modal controllability factors) of such modes from the rotor currents

    Se me escucha? En remoto, Aquí estamaos

    No full text
    Artículo en PeriódicoInfluencia de las plataformas digitales en la vida profesional y personal actualThe influence in the professional and personal live actuallyinfo:eu-repo/semantics/publishedVersio

    Espiritualidad de los libros sapienciales

    Get PDF
    Bachiller en Teología (Grado en Teología), Bachiller en Teología (Grado en Teología) – TU

    Diaconado de mujeres en el cristianismo primitivo Oriente, siglos I al V dC

    Get PDF
    Artículos en revistasLas mujeres tuvieron un gran protagonismo en el cristianismo primitivo. Entre las diferentes maneras en que se manifestó, destaca sobre todo el diaconado por su carácter transversal y por su duración, pues aparece ya en sus inicios. Éste alcanzará su mayor esplendor en los siglos IV y V, comenzará a desaparecer progresivamente a partir del siglo VI y quedará reducido a un fenómeno marginal a partir del siglo XII. En este artículo, después de una breve introducción a esas otras formas de participación, se estudiarán las principales referencias a este ministerio (situando el estudio en la parte oriental del Imperio romano hasta el siglo V) para así descubrir su desarrollo, funciones y características.Women played a leading role in Early Christianity. Among other kinds of protagonism, the diaconate stands out for its transversal nature and its duration. Women deacons have existed since the beginnings of diaconates, an office that reached its greatest splendor in the fourth and fifth centuries AD. Female-led diaconates would gradually disappear from the sixth century on and would be reduced to a marginal phenomenon by the 12th century. In this article, after a brief introduction to diverse forms of female protagonism, we study the main references to this ministry in the Eastern part of the Roman Empire from the first to the fifth centuries AD, in order to discover its development, functions, and characteristics.info:eu-repo/semantics/publishedVersio

    18,948

    full texts

    32,532

    metadata records
    Updated in last 30 days.
    Comillas is based in Spain
    Access Repository Dashboard
    Do you manage Comillas? Access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard!