Ike Skelton Combined Arms Research Library (CARL) Digital Library
Not a member yet
    8797 research outputs found

    Operation instruction no. 1/1942, Allied Air Forces.

    No full text
    All standing instructions on operational matters will be issued in the form of operation instructions, of which this is the first. These instructions are to apply to all units over which this Headquarters exercises operational control

    Op-16-FE, translation no. 101, 17 December 1944.

    No full text
    This document consists of three general diagrams (illustrations/maps and a key for each). General diagram, February 17-20, 1942. General diagram of progress of fighting on Timor by main force of Eastern Detachment, February 20-23rd, 1942. General diagram of progress of fighting in the vicinity of Desaoe by the right attack force of the Eastern Detachment (February 22, 1942)

    Outline charts- South East Asia Command and India-Burma Theater.

    No full text
    South East Asia has been defined as an area of British strategic responsibility. As such, the chain of command from the combined Chiefs of Staff is through the British Chiefs of Staff. Charts outline the chain of responsibility, outline the organization for operations, address coordination, how directives are governed, etc. There is also a list of abbreviations used throughout the document

    Field expedient- treaty at St. Lo.

    No full text
    Source: Lt. Colonel Fredrick Barrow, stationed at McGuire General Hospital, Richmond, Virginia, formerly divisional surgeon for the 29th Division in France. There is one illustration, Diagram "A", detailing a cloth identification device agreed upon in conference between American and German staff officers at St. Lo. Summary of report: an operational pact, developed by American and German officers of converse forces in action at St. Lo, France, materially improved field identification procedure through the design of a specific symbol for use during an evacuational armistice

    Military government field report no. 42, "Naval civil affairs in France, August and September 1944".

    No full text
    Field report, August 1 – September 23, 1944: the mission of the Task Group has been to support the naval mission of Commander, U.S. Ports and Bases, France, by rendering services to and coordinating naval civil affairs activities in France. This document details the task group, mission, personnel, reconnaissance parties, fishing, small ports, liaison with the Army, French liaison, field reports, plans for assignment of personnel, and provides conclusions. COMUSBASFRANCE order no. 47-44, subject: fishing. This order is issued for the purpose of providing a framework within which local naval commands will operate in order to insure some degree of uniformity between different areas under this command (security, operations, fuel and supplies, personnel, and phase)

    The armor-airborne team in action. A research report prepared at The Armored School, Fort Knox, Kentucky 1952-1953.

    No full text
    The concepts governing armored forces and airborne troops have always been surrounded with an aura of enthusiasm and excitement. By their very nature these two types of units call for actions that possess dash and drive. Armor, with its constant emphasis on mobility and shock action, sees itself as the decisive arm on the battlefield, capable of combat maneuvers that can resolve battles and even wars. The airborne, with its inherently dangerous aspects and its disregard of space factors, sees itself as capable of actions far beyond the battlefield and fixed lines. Thus when consideration is given to these two units we are liable to find ourselves confronted with a combination of tremendous potential. TOC: Introduction; the German experience; other foreign experience; the American experience-the Mediterranean; the American experience-France and Belgium; the American experience-Germany and Holland; current military thought on the team; general answers to specific questions; conclusions and recommendations; bibliography

    Report of planning and training for Forager. III Amphibious Corps report on Guam operation, planning.

    No full text
    The III Amphibious Corps captured and occupied Guam during the period 21 July 1944 to 10 August 1944. The assigned task was successfully accomplished with a minimum of difficulty. Enclosures A to M describe the details of the operation. Planning, training, tactical rehearsals, and movement to the objective are addressed

    Naval gunfire support, STEVEDORE. III Amphibious Corps report on Guam operation, naval gunfire.

    No full text
    The III Amphibious Corps captured and occupied Guam during the period 21 July 1944 to 10 August 1944. The assigned task was successfully accomplished with a minimum of difficulty. Enclosures A to M describe the details of the operation. The size and nature of the terrain at Stevedore together with lack of knowledge as to the enemy's exact disposition of troops presented a problem in the employment of naval gunfire. To furnish a study of gunfire support that may be of use in future operations of like nature, the complete report of gunfire support follows and is divided into five phases: planning and rehearsal; preliminary operations; W-Day bombardment; call fires and night programs; and deep support

    Communications during Guam operation, report of. III Amphibious Corps report on Guam operation, signal.

    No full text
    The III Amphibious Corps captured and occupied Guam during the period 21 July 1944 to 10 August 1944. The assigned task was successfully accomplished with a minimum of difficulty. Enclosures A to M describe the details of the operation. Enclosure A- copy of CG, ex troops letter 001453 of 9 May 1944. Topics include planning and execution of plans, problems affecting signal communications, attachment of miscellaneous elements of Fighter Director, etc., communication equipment/personnel, Headquarters ship procedure and operation, task force, the Corps signal system, initial supplies, the Signal battalion, wire communications, garrison forces/engineers/logistic establishments, DUKW, CentCom Two, and conclusion of the Guam operation. Completing the document is a 4-page question and answer section from the Signal Section

    G-4 periodic reports for Africa-Middle East Theater, for quarter ending 30 September 1944.

    No full text
    The G-4 periodic reports, United States Army Forces in Africa-Middle East are a compilation of data regarding the supply lines and material to be disposed of or used in these areas. 1. Supply Organization; 2. Supply Establishments; 3. Service Troops; 4. Transportation; 5. Current Supply and Maintenance Procedures; 6. Equipment; 7. Hospitalization and Evacuation; 8. Construction; 9. Local Resources; 10. Salvage; 11. Captured Supplies and Materiel; 12. Remarks and Recommendations

    0

    full texts

    8,797

    metadata records
    Updated in last 30 days.
    Ike Skelton Combined Arms Research Library (CARL) Digital Library
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇