Ike Skelton Combined Arms Research Library (CARL) Digital Library
Not a member yet
    8797 research outputs found

    Letter of instructions, 24 August 1944, First US Army.

    No full text
    Letter of Instructions, 24 August 1944, First US Army, directing British Second Army movements

    Ammo Joe's march from the Gothic Line to victory.

    No full text
    This historical report entitled "Ammo Joe's March from the Gothic Line to Victory" constitutes the final written chapter of the last of three principle phases in the twenty month long Italian campaign. Previous reports published by the Ammunition Section, Headquarters, Fifth Army, are: "Ammo Joe's Advance on Rome," and "Ammo Joe at Anzio." The report of the Rome campaign includes the three month period between 301800A April 1944 to 311800B July 1944. Since the Gothic Line campaign report covers the period between 241800A September 1944 to 251800B April 1945 there is a lapse of several weeks between the Rome report and this one. In these few weeks between "Ammo Joe" editions the Allied armies continued to move northward. The Arno River was bridged at Florence and after a six weeks siege the city fell to the Allies. This was also a period of reorganization, regrouping, and consolidation of freshly gained positions in the large area between Pisa and Florence. At this time, too, there was considerable redeployment of Fifth Army troops to help in the impending invasion of Southern France. These weeks saw the Germans continuing to retreat but with a growing intensity in their opposition. Our advance was being hampered by their energetic rear guard action, thus enabling the Germans to build strong fortifications in the almost impregnable fortress of the north—the Apennine Range

    Po River Bridge constructed by 175th Engineer Regiment, 30 April 1945 - 17 May 1945 (Ostiglia, Italy).

    No full text
    This document details design, supply, rehearsal, and construction of operation job #2880. The nature of the work was to prepare plans and assemble materials for the construction of a high level bridge across the Po River on route #12, in the vicinity of Ostiglia

    Photographs: history of Northern Combat Area Command, volume II.

    No full text
    Signal Corps photographs from the Burma-India Theater

    Traffic circulation diagram.

    No full text
    Traffic Circulation Diagram, prepared by Engineer, Third Army, to accompany Administrative Order No. 22, December 12, 1944

    ONI 222-J, the Japanese Navy: official United States Navy reference manual.

    No full text
    ONI 222-J is the standard reference manual on the Japanese Navy and is issued in two parts. The first part includes an operational design list, war loss list, and silhouette chart of principal combatant types, as well as drawings, statistics, and photographs. The second part covers minor combatant types, including information on hospital ships, and warships of other nations seized by the Japanese

    Summary of operations Omaha Beach Command for the week ending 281800 October 1944.

    No full text
    Parts: the shipping situation; tabular and graphical comparison of operations; dump operations; comparison of ports and beaches; special study - by 21st Weather Squadron; and special study

    Comments on the Rapido River crossing, January 1944.

    No full text
    A number of accounts have been written about the unsuccessful crossing of the Rapido River, in Italy, by the 36th Division, in January 1944. The program for allied military operations in the Italian Campaign was one of continual fighting and continual advance. There was no final geographic objective. The over-all mission was to hold as many German divisions as possible in Italy, away from the Western Front

    Engineer history, Mediterranean Theater, Fifth Army, appendices.

    No full text
    This is the story of the Fifth Army Engineers. No campaign in military history has presented more engineering problems than the battle of Italy. No one contributed more to the successful conclusion of this campaign than the Fifth Army Engineers. The section includes appendices on organizational charts, unit histories, bridge list and work orders, water supply operations, topographic operations, etc

    Operation Reduction of the Ruhr Pocket, 1 April, 1945 to 18 April, 1945.

    No full text
    Headquarters, XVIII Corps (Airborne) on 1 April 1945, was completing a move from the Wesel Area to Epernay, France following the successful conclusion of the airborne and ground operation in conjunction with British Second Army, from which the Corps was relieved 30 March 1945. Following the establishment of a bridgehead across the Rhine River, troops of XVIII Corps (Airborne) exploited rapidly to the East in the direction of Munster, and seized and secured defiles through which Ninth U.S. Army launched an armored and motorized infantry spearhead on 30 March 1945

    0

    full texts

    8,797

    metadata records
    Updated in last 30 days.
    Ike Skelton Combined Arms Research Library (CARL) Digital Library
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇