1,720,982 research outputs found
Going Beyond Counting First Authors in Author Co-citation Analysis
The present study examines one of the fundamental aspects of author co-citation analysis (ACA) - the way co-citation
counts are defined. Co-citation counting provides the data on which all subsequent statistical analyses and mappings
are based, and we compare ACA results based on two different types of co-citation counting - the traditional type that
only counts the first one among a cited work's authors on the one hand and a non-traditional type that takes into
account the first 5 authors of a cited work on the other hand. Results indicate that the picture produced through this non-traditional author co-citation counting contains more coherent author groups and is therefore considerably clearer. However, this picture represents fewer specialties in the research field being studied than that produced through the traditional first-author co-citation counting when the same number of top-ranked authors is selected and analyzed. Reasons for these effects are discussed
Variations on the Author
“Variations on the Author” discusses two of Eduardo Coutinho’s recent films (Um Dia na Vida, from 2010, and Últimas Conversas, posthumously released in 2015) and their contribution to the general question of documentary authorship. The director’s filmography is characterized by a consistent yet self-effacing form of authorial self-inscription: Coutinho often features as an interviewer that rather than express opinions propels discourses; an interviewer that is good at listening. This mode of self-inscription characterizes him as an author who is not expressive but who is nonetheless markedly present on the screen. In Um Dia na Vida, however, Coutinho is completely absent form the image, while Últimas Conversas, on the contrary, includes a confessional prologue that moves the director from the margins to the center of his films. This article examines the ways in which these works stand out in the filmography of a director who offers new insights into the notion of cinematic authorship
Appropriate Similarity Measures for Author Cocitation Analysis
We provide a number of new insights into the methodological discussion about author cocitation analysis. We first argue that the use of the Pearson correlation for measuring the similarity between authors’ cocitation profiles is not very satisfactory. We then discuss what kind of similarity measures may be used as an alternative to the Pearson correlation. We consider three similarity measures in particular. One is the well-known cosine. The other two similarity measures have not been used before in the bibliometric literature. Finally, we show by means of an example that our findings have a high practical relevance.information science;Pearson correlation;cosine;similarity measure;author cocitation analysis
Dispelling the Myths Behind First-author Citation Counts
We conducted a full-scale evaluative citation analysis study of scholars in the XML research field to explore just how different from each other author rankings resulting from different citation counting methods actually are, and to demonstrate the capability of emerging data and tools on the Web in supporting more realistic citation counting methods. Our results contest some common arguments for the continued
use of first-author citation counts in the evaluation of scholars, such as high correlations between author rankings by first-author citation counts and other citation
counting methods, and high costs of using more realistic citation counting methods that are not well-supported by the ISI databases. It is argued that increasingly available digital full text research papers make it possible for citation analysis studies to go beyond what the ISI databases have directly supported and to employ more
sophisticated methods
The concept of raised floor innovation for terrace housing in tropical climate
The ubiquitous terrace house is undeniably the most popular and affordable housing type in Malaysia. It has long been considered as one of the densest forms of property development and has become the common typology of accommodating the masses for this country. However, its design has been plague with various issues for decades. It has been associated, among others with bad design, thermal problems, safety issues and unsightly renovations. In contrary to the traditional tropical architecture that employs sun shading devices, openings with cross ventilation and the use of local material such as timber, terrace houses today have been designed as masonry and reinforced concrete boxes fitted with air conditioner. The modern day terrace house design has perhaps overlooked one of the most important components of a tropical house that is the raised floor. The traditional raised floor design implicated many issues such as ventilation, lighting, thermal comfort, safety and security as well as social aspects. Therefore, this research aims to explore the various issues mentioned above and proposes to uniquely develop a new design for in-house habitation as well as providing for aesthetically pleasing look. The methodology for this paper is a systematic review of existing literature and finds its relation to the raised floor innovation concept. The main finding reveals that the concept of raised floor innovation provides better design solution and gives insight to the existing Malaysian terrace housing design. It suggests a possible and promising way of increasing the livability of terrace housing by the means of a raised floor
Improving cost and time control in construction using Building Information Model (BIM): a review
The control of cost and time in construction projects is one of the most important issues in construction since the emergence of the construction industry. A successful project should meet not only quality output standards, but also time and budget objectives. The management and control of cost and time in construction is fundamental in every project. An effective cost and time management and control technique for construction projects is important in managing risk of cost overrun and delay in completion of projects. Construction projects are becoming more complex as they now involve many stakeholders from different disciplines. The emergence of Building Information Model (BIM), an alternative technology is believed to solve issues related to project cost and time control as it efficiently increases collaboration between stakeholders. The aim of this paper is to review and summarise the causes of delay and cost overrun in construction industries, which are the main causes of disputes and abandonment of projects in the industry. It was found that delays and cost overrun eat deep into the industry and leave the construction industry with a bad image for decades even with rapid advancement in technology. The review of the applications of BIM showed that most of the applications are geared towards minimising construction cost and time spent on projects. This means that the use of BIM in the management of construction projects has great impact on project cost and time
koamabayili/VECTRON-author-checklist: VECTRON author checklist
We have done our best to complete the author checklist relating to the use of animals in the hut study. Note that the objective for the hut study was to evaluate the IRS treatment applications for residual efficacy against Anopheles mosquitoes, including the local An. coluzzii mosquito population. Cows were only used to attract mosquitoes into the huts and no tests were carried out directly on the cows. The author checklist is intended for use with studies where experiments are carried out on animals, which is why we have had such difficulty in completing this for the hut study, as many of the questions do not relate to how the cows were used
Author-wise bibliometric analysis based on entropy.
Author-wise bibliometric analysis based on entropy.</p
- …
