1,720,957 research outputs found

    Interaction Lean-BIM en phase exécution de projet de construction : Développement d’un outil de planification automatique basé sur les informations du bâtiment pour soutenir la démarche LPS®

    No full text
    In recent years, the construction sector has experienced a decline in productivity compared to other industries. This decrease is primarily due to the delayed and slow adoption of lean production methods and new technologies. To enhance its productivity, the construction sector must expedite its adoption of Lean Construction (LC) techniques and Building Information Modeling (BIM). These solutions have proven to be effective in improving collaboration among project stakeholders, optimizing design and construction processes, and consequently enabling faster, better, and more cost-effective construction. Despite the separate development and implementation of these solutions, research has shown a strong interest in their combined application.In order to contribute to the co-application of LC and BIM, based on a state-of-the-art review, our research has led to the identification of a promising interaction between these two approaches. This connection links the Last Planner System® (a collaborative planning method of LC) with the visualization functions of BIM. Furthermore, a detailed analysis of tools combining LPS® and BIM has shown that the utilization of data generated by these two approaches is not yet fully integrated. To enhance the integration between LPS® and BIM, we propose, through this thesis, to automate the generation of tasks in the collaborative planning of the LPS® approach using operational data from a construction project, including data from the BIM digital model. Automating the planning process allows decision-makers to eliminate tedious manual work, resulting in time and cost savings. Moreover, it leverages the project's operational data to create added value, demonstrating a leaner management approach to building information, known as "Lean Building Information Management."On a technological level, our work has allowed us to implement a tool (a web application) that automatically generates a spatio-temporal schedule using real construction project data of the HVAC (heating, ventilation, and air conditioning) discipline. These pieces of information include project estimation data generated during the tendering phase, data from the digital model created during the detailed design stage, the client’s milestones, as well as standards of equipments’ installation operations. The implementation of this solution required a preliminary analysis of user needs and input data, meticulous work to define and standardize the equipments’ installation operations as well as several developments, including software development.Finally, functional and analytical evaluations were conducted to verify the coherence of the results generated by the solution, as well as to assess to what extent its functionalities meet the needs of end users.The results obtained in this thesis pave the way for several future works, particularly in the field of continuous management of construction projects data throughout their life cycles, through the use of data warehouses.Ces dernières années, le secteur de la construction a connu une baisse de productivité par rapport aux autres secteurs d'activité. Cette chute est principalement due à l’adoption tardive et ralentie des méthodes de production allégées et des nouvelles technologies. Pour améliorer sa productivité, le secteur de la construction doit accélérer son adoption des techniques du Lean Construction (LC) et du BIM. Ces solutions s’avèrent être efficaces pour améliorer la collaboration entre les acteurs d’un projet, optimiser les processus de conception et de construction et par voie de conséquence construire vite, mieux et moins cher. Malgré le développement et la mise en œuvre séparés de ces solutions, des travaux de recherche ont montré un fort intérêt quant à leur application conjointe.Afin de contribuer à la co-application du LC et du BIM, et en se basant sur un état de l’art, nos travaux de recherche ont conduit à l’identification d’une interaction prometteuse entre ces deux approches. Celle-ci relie la méthode Last Planner System® (méthode de planification collaborative du LC) aux fonctions de visualisation du BIM. Par ailleurs, une analyse détaillée des outils combinant le LPS® et le BIM a montré que l’exploitation des données générées par ces deux approches ne fait pas encore l’objet d’une intégration complète. Pour améliorer l’intégration entre le LPS® et le BIM, nous proposons à travers cette thèse d’automatiser la génération des tâches du planning collaboratif de l’approche LPS® à partir des données opérationnelles d’un projet de construction, y compris les données de la maquette numérique BIM. L’automatisation de la planification permet aux décideurs de s’affranchir du travail manuel fastidieux, ce qui se traduit par un gain de temps et économique. De plus, elle capitalise sur les données opérationnelles du projet pour créer de la valeur ajoutée, ce qui témoigne d’une gestion plus légère des informations du bâtiment, c’est-à-dire d’une approche « Lean Building Information Management ».Sur le plan technologique, nos travaux ont permis de mettre en place un outil (une application Web) permettant de générer automatiquement un planning spatio-temporel en utilisant les données du génie climatique d’un projet de construction réel. Ces informations incluent les données de chiffrage du projet produites en phase avant-vente, les données de la maquette numérique modélisées en phase d’études d’exécution, les jalons imposés par le client ainsi que les données standards des opérations de mises en œuvre des équipements. La mise en œuvre de cette solution a nécessité une analyse préalable des besoins des utilisateurs, des données d’entrées, un travail rigoureux pour rédiger et standardiser les opérations de mise en œuvre des équipements, ainsi que plusieurs développements notamment informatiques.Enfin, des évaluations fonctionnelles et analytiques ont été menées afin de vérifier la cohérence des résultats générés par la solution, ainsi que pour évaluer dans quelle mesure ses fonctionnalités répondent aux besoins des utilisateurs finaux.Les résultats obtenus dans le cadre de cette thèse ouvrent la voie à plusieurs travaux futurs, notamment en matière de gestion continue des données des projets de construction tout au long de leurs cycles de vie, grâce à l’utilisation des entrepôts de données (DataWarehouse)

    Lean-BIM interaction in the execution phase of construction projects : Development of an automatic planning tool based on building information to support the LPS® approach

    No full text
    Ces dernières années, le secteur de la construction a connu une baisse de productivité par rapport aux autres secteurs d'activité. Cette chute est principalement due à l’adoption tardive et ralentie des méthodes de production allégées et des nouvelles technologies. Pour améliorer sa productivité, le secteur de la construction doit accélérer son adoption des techniques du Lean Construction (LC) et du BIM. Ces solutions s’avèrent être efficaces pour améliorer la collaboration entre les acteurs d’un projet, optimiser les processus de conception et de construction et par voie de conséquence construire vite, mieux et moins cher. Malgré le développement et la mise en œuvre séparés de ces solutions, des travaux de recherche ont montré un fort intérêt quant à leur application conjointe.Afin de contribuer à la co-application du LC et du BIM, et en se basant sur un état de l’art, nos travaux de recherche ont conduit à l’identification d’une interaction prometteuse entre ces deux approches. Celle-ci relie la méthode Last Planner System® (méthode de planification collaborative du LC) aux fonctions de visualisation du BIM. Par ailleurs, une analyse détaillée des outils combinant le LPS® et le BIM a montré que l’exploitation des données générées par ces deux approches ne fait pas encore l’objet d’une intégration complète. Pour améliorer l’intégration entre le LPS® et le BIM, nous proposons à travers cette thèse d’automatiser la génération des tâches du planning collaboratif de l’approche LPS® à partir des données opérationnelles d’un projet de construction, y compris les données de la maquette numérique BIM. L’automatisation de la planification permet aux décideurs de s’affranchir du travail manuel fastidieux, ce qui se traduit par un gain de temps et économique. De plus, elle capitalise sur les données opérationnelles du projet pour créer de la valeur ajoutée, ce qui témoigne d’une gestion plus légère des informations du bâtiment, c’est-à-dire d’une approche « Lean Building Information Management ».Sur le plan technologique, nos travaux ont permis de mettre en place un outil (une application Web) permettant de générer automatiquement un planning spatio-temporel en utilisant les données du génie climatique d’un projet de construction réel. Ces informations incluent les données de chiffrage du projet produites en phase avant-vente, les données de la maquette numérique modélisées en phase d’études d’exécution, les jalons imposés par le client ainsi que les données standards des opérations de mises en œuvre des équipements. La mise en œuvre de cette solution a nécessité une analyse préalable des besoins des utilisateurs, des données d’entrées, un travail rigoureux pour rédiger et standardiser les opérations de mise en œuvre des équipements, ainsi que plusieurs développements notamment informatiques.Enfin, des évaluations fonctionnelles et analytiques ont été menées afin de vérifier la cohérence des résultats générés par la solution, ainsi que pour évaluer dans quelle mesure ses fonctionnalités répondent aux besoins des utilisateurs finaux.Les résultats obtenus dans le cadre de cette thèse ouvrent la voie à plusieurs travaux futurs, notamment en matière de gestion continue des données des projets de construction tout au long de leurs cycles de vie, grâce à l’utilisation des entrepôts de données (DataWarehouse).In recent years, the construction sector has experienced a decline in productivity compared to other industries. This decrease is primarily due to the delayed and slow adoption of lean production methods and new technologies. To enhance its productivity, the construction sector must expedite its adoption of Lean Construction (LC) techniques and Building Information Modeling (BIM). These solutions have proven to be effective in improving collaboration among project stakeholders, optimizing design and construction processes, and consequently enabling faster, better, and more cost-effective construction. Despite the separate development and implementation of these solutions, research has shown a strong interest in their combined application.In order to contribute to the co-application of LC and BIM, based on a state-of-the-art review, our research has led to the identification of a promising interaction between these two approaches. This connection links the Last Planner System® (a collaborative planning method of LC) with the visualization functions of BIM. Furthermore, a detailed analysis of tools combining LPS® and BIM has shown that the utilization of data generated by these two approaches is not yet fully integrated. To enhance the integration between LPS® and BIM, we propose, through this thesis, to automate the generation of tasks in the collaborative planning of the LPS® approach using operational data from a construction project, including data from the BIM digital model. Automating the planning process allows decision-makers to eliminate tedious manual work, resulting in time and cost savings. Moreover, it leverages the project's operational data to create added value, demonstrating a leaner management approach to building information, known as "Lean Building Information Management."On a technological level, our work has allowed us to implement a tool (a web application) that automatically generates a spatio-temporal schedule using real construction project data of the HVAC (heating, ventilation, and air conditioning) discipline. These pieces of information include project estimation data generated during the tendering phase, data from the digital model created during the detailed design stage, the client’s milestones, as well as standards of equipments’ installation operations. The implementation of this solution required a preliminary analysis of user needs and input data, meticulous work to define and standardize the equipments’ installation operations as well as several developments, including software development.Finally, functional and analytical evaluations were conducted to verify the coherence of the results generated by the solution, as well as to assess to what extent its functionalities meet the needs of end users.The results obtained in this thesis pave the way for several future works, particularly in the field of continuous management of construction projects data throughout their life cycles, through the use of data warehouses

    Interaction Lean-BIM en phase exécution de projet de construction : Développement d’un outil de planification automatique basé sur les informations du bâtiment pour soutenir la démarche LPS®

    No full text
    In recent years, the construction sector has experienced a decline in productivity compared to other industries. This decrease is primarily due to the delayed and slow adoption of lean production methods and new technologies. To enhance its productivity, the construction sector must expedite its adoption of Lean Construction (LC) techniques and Building Information Modeling (BIM). These solutions have proven to be effective in improving collaboration among project stakeholders, optimizing design and construction processes, and consequently enabling faster, better, and more cost-effective construction. Despite the separate development and implementation of these solutions, research has shown a strong interest in their combined application.In order to contribute to the co-application of LC and BIM, based on a state-of-the-art review, our research has led to the identification of a promising interaction between these two approaches. This connection links the Last Planner System® (a collaborative planning method of LC) with the visualization functions of BIM. Furthermore, a detailed analysis of tools combining LPS® and BIM has shown that the utilization of data generated by these two approaches is not yet fully integrated. To enhance the integration between LPS® and BIM, we propose, through this thesis, to automate the generation of tasks in the collaborative planning of the LPS® approach using operational data from a construction project, including data from the BIM digital model. Automating the planning process allows decision-makers to eliminate tedious manual work, resulting in time and cost savings. Moreover, it leverages the project's operational data to create added value, demonstrating a leaner management approach to building information, known as "Lean Building Information Management."On a technological level, our work has allowed us to implement a tool (a web application) that automatically generates a spatio-temporal schedule using real construction project data of the HVAC (heating, ventilation, and air conditioning) discipline. These pieces of information include project estimation data generated during the tendering phase, data from the digital model created during the detailed design stage, the client’s milestones, as well as standards of equipments’ installation operations. The implementation of this solution required a preliminary analysis of user needs and input data, meticulous work to define and standardize the equipments’ installation operations as well as several developments, including software development.Finally, functional and analytical evaluations were conducted to verify the coherence of the results generated by the solution, as well as to assess to what extent its functionalities meet the needs of end users.The results obtained in this thesis pave the way for several future works, particularly in the field of continuous management of construction projects data throughout their life cycles, through the use of data warehouses.Ces dernières années, le secteur de la construction a connu une baisse de productivité par rapport aux autres secteurs d'activité. Cette chute est principalement due à l’adoption tardive et ralentie des méthodes de production allégées et des nouvelles technologies. Pour améliorer sa productivité, le secteur de la construction doit accélérer son adoption des techniques du Lean Construction (LC) et du BIM. Ces solutions s’avèrent être efficaces pour améliorer la collaboration entre les acteurs d’un projet, optimiser les processus de conception et de construction et par voie de conséquence construire vite, mieux et moins cher. Malgré le développement et la mise en œuvre séparés de ces solutions, des travaux de recherche ont montré un fort intérêt quant à leur application conjointe.Afin de contribuer à la co-application du LC et du BIM, et en se basant sur un état de l’art, nos travaux de recherche ont conduit à l’identification d’une interaction prometteuse entre ces deux approches. Celle-ci relie la méthode Last Planner System® (méthode de planification collaborative du LC) aux fonctions de visualisation du BIM. Par ailleurs, une analyse détaillée des outils combinant le LPS® et le BIM a montré que l’exploitation des données générées par ces deux approches ne fait pas encore l’objet d’une intégration complète. Pour améliorer l’intégration entre le LPS® et le BIM, nous proposons à travers cette thèse d’automatiser la génération des tâches du planning collaboratif de l’approche LPS® à partir des données opérationnelles d’un projet de construction, y compris les données de la maquette numérique BIM. L’automatisation de la planification permet aux décideurs de s’affranchir du travail manuel fastidieux, ce qui se traduit par un gain de temps et économique. De plus, elle capitalise sur les données opérationnelles du projet pour créer de la valeur ajoutée, ce qui témoigne d’une gestion plus légère des informations du bâtiment, c’est-à-dire d’une approche « Lean Building Information Management ».Sur le plan technologique, nos travaux ont permis de mettre en place un outil (une application Web) permettant de générer automatiquement un planning spatio-temporel en utilisant les données du génie climatique d’un projet de construction réel. Ces informations incluent les données de chiffrage du projet produites en phase avant-vente, les données de la maquette numérique modélisées en phase d’études d’exécution, les jalons imposés par le client ainsi que les données standards des opérations de mises en œuvre des équipements. La mise en œuvre de cette solution a nécessité une analyse préalable des besoins des utilisateurs, des données d’entrées, un travail rigoureux pour rédiger et standardiser les opérations de mise en œuvre des équipements, ainsi que plusieurs développements notamment informatiques.Enfin, des évaluations fonctionnelles et analytiques ont été menées afin de vérifier la cohérence des résultats générés par la solution, ainsi que pour évaluer dans quelle mesure ses fonctionnalités répondent aux besoins des utilisateurs finaux.Les résultats obtenus dans le cadre de cette thèse ouvrent la voie à plusieurs travaux futurs, notamment en matière de gestion continue des données des projets de construction tout au long de leurs cycles de vie, grâce à l’utilisation des entrepôts de données (DataWarehouse)

    Going Beyond Counting First Authors in Author Co-citation Analysis

    Get PDF
    The present study examines one of the fundamental aspects of author co-citation analysis (ACA) - the way co-citation counts are defined. Co-citation counting provides the data on which all subsequent statistical analyses and mappings are based, and we compare ACA results based on two different types of co-citation counting - the traditional type that only counts the first one among a cited work's authors on the one hand and a non-traditional type that takes into account the first 5 authors of a cited work on the other hand. Results indicate that the picture produced through this non-traditional author co-citation counting contains more coherent author groups and is therefore considerably clearer. However, this picture represents fewer specialties in the research field being studied than that produced through the traditional first-author co-citation counting when the same number of top-ranked authors is selected and analyzed. Reasons for these effects are discussed

    Variations on the Author

    Get PDF
    “Variations on the Author” discusses two of Eduardo Coutinho’s recent films (Um Dia na Vida, from 2010, and Últimas Conversas, posthumously released in 2015) and their contribution to the general question of documentary authorship. The director’s filmography is characterized by a consistent yet self-effacing form of authorial self-inscription: Coutinho often features as an interviewer that rather than express opinions propels discourses; an interviewer that is good at listening. This mode of self-inscription characterizes him as an author who is not expressive but who is nonetheless markedly present on the screen. In Um Dia na Vida, however, Coutinho is completely absent form the image, while Últimas Conversas, on the contrary, includes a confessional prologue that moves the director from the margins to the center of his films. This article examines the ways in which these works stand out in the filmography of a director who offers new insights into the notion of cinematic authorship

    Appropriate Similarity Measures for Author Cocitation Analysis

    Get PDF
    We provide a number of new insights into the methodological discussion about author cocitation analysis. We first argue that the use of the Pearson correlation for measuring the similarity between authors’ cocitation profiles is not very satisfactory. We then discuss what kind of similarity measures may be used as an alternative to the Pearson correlation. We consider three similarity measures in particular. One is the well-known cosine. The other two similarity measures have not been used before in the bibliometric literature. Finally, we show by means of an example that our findings have a high practical relevance.information science;Pearson correlation;cosine;similarity measure;author cocitation analysis

    Dispelling the Myths Behind First-author Citation Counts

    Get PDF
    We conducted a full-scale evaluative citation analysis study of scholars in the XML research field to explore just how different from each other author rankings resulting from different citation counting methods actually are, and to demonstrate the capability of emerging data and tools on the Web in supporting more realistic citation counting methods. Our results contest some common arguments for the continued use of first-author citation counts in the evaluation of scholars, such as high correlations between author rankings by first-author citation counts and other citation counting methods, and high costs of using more realistic citation counting methods that are not well-supported by the ISI databases. It is argued that increasingly available digital full text research papers make it possible for citation analysis studies to go beyond what the ISI databases have directly supported and to employ more sophisticated methods

    Author Index

    No full text
    Nao informado

    koamabayili/VECTRON-author-checklist: VECTRON author checklist

    No full text
    We have done our best to complete the author checklist relating to the use of animals in the hut study. Note that the objective for the hut study was to evaluate the IRS treatment applications for residual efficacy against Anopheles mosquitoes, including the local An. coluzzii mosquito population. Cows were only used to attract mosquitoes into the huts and no tests were carried out directly on the cows. The author checklist is intended for use with studies where experiments are carried out on animals, which is why we have had such difficulty in completing this for the hut study, as many of the questions do not relate to how the cows were used
    corecore