3 research outputs found
THE SERVICE OF SOCIAL WELFARE INFORMATION SYSTEM-NEXT GENERATION (SIKS-NG) SOCIAL WELFARE INTEGRATED DATA (DTKS)
This study examines the implementation of the Social Welfare Information System–Next Generation (SIKS-NG) as an electronic-based public service for managing Integrated Social Welfare Data (DTKS) at the Bengkulu City Social Service. Using a qualitative descriptive approach, the research analyzes SIKS-NG services through six key dimensions: technology focus, operators’ technical skills, operators’ personal skills, organizational commitment, system integration, and the continuity of the Electronic-Based Government System (SPBE). Data were collected through interviews, observations, and document analysis, guided by the Regulation of the Minister of Social Affairs Number 3 of 2021. The findings indicate that while SIKS-NG has enhanced data standardization, transparency, and accountability in social assistance targeting, its effectiveness is constrained by limited human resources, uneven digital competencies among operators, and inadequate technological infrastructure. These constraints affect the timeliness and accuracy of DTKS updates, which are critical for ensuring equitable social protection. The study concludes that strengthening institutional capacity, expanding operator training, improving infrastructure, and reinforcing multi-level coordination are essential to optimize SIKS-NG performance and support sustainable digital welfare governance at the local level
Building Analysis of the Lill Hajj Wall Umrah Building Based on Functionality of the Building for Umrah and Hajj Pilgrims
PT Lill Hajj Wall Umrah is targeted to get 5,226 consumers per year or equivalent to 436 people per month by 2030. The old office in the form of a shophouse with a building area of 119.75 m² for a capacity of 99 people is considered inadequate to serve 436 consumers per month, so PT Lill Hajj Wall Umrah needs a new office with a meeting room of at least 523.2 m². A new office will be planned based on SNI 2847-2019, SNI 1726-2019, SNI 1727-2020, and PBI 1983. The planning results are in the form of an analysis of the new office structure with building dimensions of 28.30 x 23.35m, four floors with a building area of 4,503 m². The material specifications of the building structure are concrete quality (fc') 41.5 MPa, melted reinforcing steel quality (fy) 400 MPa (BJTS), and 280 MPa (BJTP). Basement floor column dimensions 0.6 x 0.6 m, first to fourth floor columns 0.5 x 0.6 m, rooftop columns 0.4 x 0.4 m, main beam dimensions 0.25 x 0.35 m, child beams 0.25x0.5 m, stair beams 0.25 x 0.35 m, roof deck beams 0.25 x 0.3 m and 0.3 x 0.4 m, concrete slab thickness 0.15 m. The results of structural modeling using the Etabs application showed that there was no over-strength (O/S) in the column and beam structure elements. The results of the design of the new office building Lill Hajj Wall Umrah in the form of a basement floor equipped with prayer room facilities covering an area of 14 m2, a generator room covering an area of 15.28 m2, a pump room covering an area of 15.28 m2, parking covering an area of 781.53 m2. The first floor is equipped with VIP room facilities covering an area of 33.33 m2, a prayer room covering an area of 25.87 m2, a toilet covering an area of 44.93 m2, and a boutique room covering an area of 55.22 m2, and a warehouse covering an area of 12.3 m2. The second floor is equipped with a meeting room covering an area of 47.9 m2, a manager's room covering an area of 36.7 m2, a toilet covering an area of 30.9 m2, a prayer room covering an area of 16.08 m2, a boardroom covering an area of 80.59 m2 and a waiting room covering an area of 45 m2. The third and fourth floors are equipped with toilets covering an area of 25.75 m2, a prayer room covering an area of 23.95 m2, and a ballroom of 383.75 m2. The estimated budget for the construction of lill Hajj Wall Umrah's new office is Rp 7.612.645.721.- and takes 406 working days for construction
LAPORAN INDIVIDU PRAKTIK LAPANGAN TERBIMBING (PLT)
Magang III terintegrasi dengan mata kuliah Praktik Lapangan Terbimbing
(PLT) mempunyai kegiatan yang terkait dengan pembelajaran maupun kegiatan yang
mendukung berlangsungnya pembelajaran. Mata kuliah PLT diharapkan dapat
memberikan pengalaman belajar bagi mahasiswa, terutama dalam hal pengalaman
mengajar, memperluas wawasan, pelatihan dan pengembangan kompetensi yang
diperlukan dalam bidangnya, peningkatan keterampilan, kemandirian, tanggung
jawab, dan kemampuan dalam memecahkan masalah.
Secara umum, pelaksanaan PLT meliputi empat tahapan yaitu tahap
persiapan, pelaksanaan, evaluasi dan penyusunan laporan. Tahapan pelaksanaan PLT
meliputi tahap pembekalan, penerjunan, dan praktik mengajar. Pelaksanaan program
PLT dimulai dari tanggal 15 September 2017 sampai dengan 15 November 2017
yang diisi dengan observasi kelas dan lembaga, konsultasi, pembuatan Rencana
Pelaksanaan Pembelajaran, pembuatan materi ajar dan media pembelajaran, praktik
mengajar, dan evaluasi. Dalam praktik mengajar, kelas yang diampu adalah kelas X
Teknik Pemesinan 1 dan X Teknik Pemesinan 2. Mata pelajaran yang diampu adalah
teknologi mekanik dan praktik kerja bangku.
Penyelenggaraan PLT untuk mendukung pengembangan kompetensi
mahasiswa sebagai calon guru atau tenaga pendidik. Melalui program ini, praktikan
diharapkan memiliki keterampilan dalam mengelola kelas sehingga kegiatan
pembelajaran dapat berjalan dengan baik dan menghasilkan lulusan yang
berkompeten. Pelaksanaan PLT di SMK Muhammadiyah 1 Bantul ini juga
diharapkan dapat menjadi salah satu fungsi kehumasan mahasiswa sehingga sekolah
dapat menjadi mitra Universitas Negeri Yogyakarta untuk melaksanakan PLT tahun berikutnya
