1,765,976 research outputs found
M.V. Bonne Bay. Photograph of the M.V. Bonne Bay
A black-and-white photograph of the M.V. Bonne Bay. The ferry has a cabin structure and has cars on the deck. The hills of Bonne Bay are visible in the background. 1960s
M.V. Bonne Bay. Photograph of the M.V. Bonne Bay
A black-and-white photograph of the M.V. Bonne Bay, dated July 1957. It captures the wooden ferry boat with a cabin, carrying a few people on deck, moving through still waters of Bonne Bay. There is a dory on top of the cabin, presumably used as a lifeboat. The shoreline in the background features rocky terrain and the distant mountains of Bonne Bay
Desain Konstruksi Kapal Penumpang M.V Putri Hijau Penyebrangan Kecamatan Belawan-Desa Batang Serai
ABSTRACT
Construction is an activity to build facilities and infrastructure. In addition, construction can also be interpreted as buildings or infrastructure units in one or several areas. In the final project of Delta Liona Aritonang with the title Planning of Passenger Ship Design as a Means of Transportation in Batang Serai Village, the author has made a passenger ship design under the name M.V. Putri Hijau. The author has previously designed a line plan and general arrangement. The author's goal is to get construction calculations from the passenger ship M.V. Putri Hijau, get a construction profile picture on the passenger ship M.V. Putri Hijau.
Keywords : Ship Construction, M.V Putri Hijau, Construction Profil
Desain Konstruksi Kapal Wisata M.V. Sitoba Berbahan Dasar Fiberglass
Construction can be interpreted as a building or infrastructure unit in one or several areas. In Dony Damara's final assignment with the title Planning for
Tourism Ship Design to Support Tourism on Lake Toba, the author has created a tourist ship design with the name M.V. Sitoba. The previous author has designed the lines plan and general arrangement. The results of this study are to get the modulus calculation of each component on the M.V. Sitoba, Transverse Frame = 17,57 cm³, Side Longitudinal = 21,36 cm³, Side Girder = 20,76 cm³, Tunnel Longitudinal = 18,99 cm³, Bottom Longitudinal = 25,737 cm³, Deck Girder =
13,183 cm³, than obtain the thickness of the fiberglass layer on all sides, and obtain a 3D construction drawings on the M.V. Sitoba tourist ships uses autocad software
with a distance of 0,5 meters for each component
M.V. McMullen
Photograph of district manager M.V. McMullen making a final check of the district Bermuda sprigger
- …
