1,731,972 research outputs found
Fermi National Accelerator Laboratory
Fermi National Accelerator Laboratory advances the understanding of the fundamental nature of matter and energy by providing leadership and resources for qualified researchers to conduct basic research at the frontiers of high energy physics and related disciplines. Fermilab's mission is to advance the understanding of the fundamental nature of matter and energy. Fermilab's world-class scientific research facility allows qualified researchers from around the world to conduct fundamental research at the frontiers of high-energy physics and related disciplines
Recommended from our members
An improved 8 GeV beam transport system for the Fermi National Accelerator Laboratory
A new 8 GeV beam transport system between the Booster and Main Ring synchrotrons at the Fermi National Accelerator Laboratory is presented. The system was developed in an effort to improve the transverse phase space area occupied by the proton beam upon injection into the Main Ring accelerator. Problems with the original system are described and general methods of beamline design are formulated. Errors in the transverse properties of a beamline at the injection point of the second synchrotron and their effects on the region in transverse phase space occupied by a beam of particles are discussed. Results from the commissioning phase of the project are presented as well as measurements of the degree of phase space dilution generated by the transfer of 8 GeV protons from the Booster synchrotron to the Main Ring synchrotron
Recommended from our members
Fermilab SRF cryomodule operational experience
Fermi National Accelerator Laboratory is constructing an Advanced Accelerator Research and Development facility at New Muon Lab. The cryogenic infrastructure in support of the initial phase of the facility consists of two Tevatron style standalone refrigerators, cryogenic distribution system as well as an ambient temperature pumping system to achieve 2K operations with supporting purification systems. During this phase of the project a single Type III plus 1.3 GHz cryomodule was installed, cooled and tested. Design constraints of the cryomodule required that the cryomodule individual circuits be cooled at predetermined rates. These constraints required special design solutions to achieve. This paper describes the initial cooldown and operational experience of a 1.3 GHz cryomodule using the New Muon Lab cryogenic system
News Release
Dr. Leon M. Lederman, Director of Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois, has been named one of three recipients of the 1988 Nobel Prize for physics. Sharing the prize with Dr. Lederman are Dr. Melvin Schwartz and Dr. Jack Steinberger. The three have been cited for their discovery, in 1962, of a second neutrino, an elementary subatomic particle. Fermilab is operated by the Universities Research Association, Inc., under contract with the United States Department of Energy (DOE)
Record-breaking luminosity boosts discovery potential at Fermilab's Tevatron collider
The record-breaking performance of the Tevatron colklider at the Department of Energy's Fermi National Accelerator Laboratory is pushing tje search fpr dark matter, supersymmetric particles and extra dimensions to new limits. Repeatedly smashing peak luminosity records, the Tevatron has created record numbers of proton-antiproton collisions that provide the means to unveil the secrets of the univers
A report on the design of the Fermi National Accelerator Laboratory superconducting accelerator
Recommended from our members
Initial Estimate of Transmission Line Effects in SSC Design D Magnets
The response of the SSC accelerator magnet string to transient excitation from the power supply is considered. Some criteria for the selection of the optimum damping resistors for the SSC magnets are discussed. Once the damping resistors are chosen, the transient response of the load to power supply transients, including the effect of the power supply filter is analyzed. A comparative analysis is made of the differences between two possible configurations in the distribution of the magnets (with and without a return bus)
Recommended from our members
Energy Saver A-Sector Power Test Results
The superconducting magnets and associated cryogenic components in A-sector represent the initial phase of installation of the Fermilab superconducting accelerator, designed to accelerate proton beams to energies of 1 TeV. Installation of the magnets, comprising one-eighth of the ring, was completed in December, 1981. Cooldown and power tests took place in the first half of 1982, concurrent with main ring use for 400 GeV high energy physics. The tests described in this paper involved 151 cryogenic components in the tunnel: 94 dipoles, 24 quadrupoles, 25 spool pieces, 3 feed cans, 4 turn-around boxes and 1 bypass. Refrigeration was supplied by three satellite refrigerators, the Central Helium Liquefier, and two compressor buildings. The magnets were powered by a single power supply
Recommended from our members
Experience with copper oxide production in antiproton source components at Fermi National Accelerator Laboratory
The Antiproton (Pbar) Source at Fermi National Accelerator Laboratory is a facility comprised of a target station, two rings called the Debuncher and Accumulator and the transport lines between those rings and the remainder of the particle accelerator complex. Water is by far the most common medium for carrying excess heat away from components, primarily electromagnets, in this facility. The largest of the water systems found in Pbar is the 95 degree Fahrenheit Low Conductivity Water (LCW) system. LCW is water which has had free ions removed, increasing its resistance to electrical current. This water circuit is used to cool magnets, power supplies, and stochastic cooling components and typically has a resistivity of 11--18 megaohms-cm. For more than ten years the Antiproton rings were plagued with overheating magnets due to plugged water-cooling channels. Various repairs have been tried over the years with no permanent success. Throughout all of this time, water samples have indicated copper oxide, CuO, as the source of the contamination. Matters came to a head in early 1997 following a major underground LCW leak between the Central Utilities Building and the Antiproton Rings enclosures. Over a span of several weeks following system turn-on, some twenty magnets overheated leading to unreliable Pbar source operation. Although it was known that oxygen in the system reacts with the copper tubing to form CuO, work to remedy this problem was not undertaken until this time period. Leaks, large quantities of make-up water, infrequent filter replacement, and thermal cycling also result in an increase in the corrosion product release rate. A three-pronged approach has been implemented to minimize the amount of copper oxide available to plug the magnets: (1) installation of an oxygen removal system capable of achieving dissolved oxygen concentrations in the parts per billion (ppb) range; (2) regular closed-loop filter/flushing of the copper headers and magnets and stainless steel header during down periods; and (3) installation of a full-flow filtration system designed to remove any CuO produced by the trace amounts of dissolved oxygen in the LCW system. All three items have been completed. The dissolved oxygen concentration is now routinely on the order of 15 ppb and returns to that level within 8--12 hours following an upset condition such as a leak. Prior to installation of the oxygen removal system, oxygen levels were approximately 3,000 ppb. Particle analysis of the water before-and-after filter and flushing of the LCW system indicates a cleaner system. Another round of filter/flushing occurred shortly before the scheduled start-up and will be performed during down periods when deemed necessary by newly-installed instrumentation. The full-flow filtration system has been recently commissioned. The system consists of two parallel filter housings, with a rated total flow capacity of 2,500 gpm at 300 psi, piping to the LCW supply header and associated instrumentation
Magnet Current Regulation in the SSC
This paper investigates the transient response, the stability and the regulation characteristics of a system designed to power the SSC magnets. Considering the magnet system as a transmission line, the performance of the regulation system was investigated under perturbations on the voltage power supply and changes in the current reference. The influence of the damping resistors on the transient reponse was included. Differential current transductors were included to minimize the tracking errors between the electrically isolated sectors. A comparison was made for the two cases, with and without the differential loops. System performance was investigated during ramping of the magnets and during steady state full field operation
- …
