1,721,031 research outputs found

    THE EUROSDR GEOBIM PROJECT - DEVELOPING CASE STUDIES for the USE of GEOBIM in PRACTICE

    Full text link
    Although the use of location-based data (location coupled with semantic information) within Geographical Information Systems (GIS) and from Earth Observation (e.g. satellite) sources has been long established for decision makers, this has only recently been reflected in the construction sector with a more recent move from Computer Aided Design (CAD) to Building Information Modelling. BIM has opened up an additional source of valuable location-based data, with particular focus on the architecture, structural and engineering detail of both buildings and infrastructure projects. As with most if not all location data, while BIM can be used on its own, major benefits are to be derived from integration with other data sources. When this is done with GIS, the result is known as GeoBIM and although there are some similarities between the two, challenges to integration are both technical and non technical, in particular the need for clear case studies to motivate both developers and senior management. There are synergies to be gained from a multi-national, coordinated approach when addressing these challenges, where participants can benefit from each-others' experience and where the needs of users and the National Mapping and Cadastral Agency (NMCA) perspective underpin the research. This paper summarises final outcomes and findings of the EuroSDR GeoBIM research project, which was set up to provide the required multi-national, user-centric collaborative framework, which had as its overall aim the development of best practice guidelines for GeoBIM, and due to its situation within EuroSDR has an NMCA focus. The paper updates information with regard to GeoBIM projects and maturity in the participant countries, and provides an overview of the two case studies developed

    3RD BIM/GIS INTEGRATION WORKSHOP and 15TH 3DGEOINFO CONFERENCE 2020 - PREFACE

    Full text link
    Abstract. The interest in and use of 3D models in built environments is rapidly increasing, and they are now a key component of decision-making in areas including climate change mitigation (e.g., calculating solar panel potential, flood modelling, modelling housing age for retrofitting of thermal insulation), urban planning and cadastral systems (modelling rights, restrictions and responsibilities in complex buildings, streamlining the process to issue planning permits, design of existing or new developments) and infrastructure (construction, transport, utility management and modelling, asset management). 3D models are also an integrator for the data underpinning smart cities – knowing where a sensor is in 3D space allows the data to be integrated with the surrounding context – for example, noise data could be integrated with traffic information. Reflecting this interest, national mapping and cadastral agencies (NMCA) including Ordnance Survey (GB) are now increasingly generating 3D mapping at national scale, and there is extensive research as to how this data can be integrated with another emerging source of 3D models such as building information modelling (BIM).These trends were evident during the 3rd BIM/GIS Integration Workshop and 15th 3DGeoInfo 2020 events, which were co-hosted by University College London and Ordnance Survey (GB) in September 2020. The workshop and conference brought together international researchers from academia, industry, government and national mapping and cadastral agencies in the field of 3D geoinformation, in an interdisciplinary gathering of researchers in the fields of data collection, data management, data quality, data analysis, advanced modelling approaches, applications, users, visualisation, augmented reality, artificial intelligence and many more.This year’s theme was Users and Use Cases. The workshop and conference covered a wide range of topics including 3D data acquisition and processing, 3D city modelling and related standards, visualisation and dissemination of 3D data, augmented and virtual reality, 3D and Artificial Intelligence/Machine Learning. Three sessions of the BIM/GIS Integration Workshop were dedicated to Applications of BIM/GIS Integration, and an entire day of 3DGeoInfo 2020 to Users and Use Cases within 3DGeoInfo. Additionally, two sessions were specifically aimed at NMCA participants.Although initially intended to be a face-to-face event in London, the team rapidly adjusted to the emerging COVID-19 situation, identifying an online solution that facilitated and encouraged participant interaction. This meant that the events could still provide a platform for learning, discussion, and exchange of ideas that they have been able to in previous years, as well as providing opportunities to promote international collaboration in these topics. This special issue of the ISPRS International Archives of Photogrammetry, Remote Sensing and Spatial Information Sciences contains 23 papers selected by a double-blind peer review involving a minimum of two reviewers, presenting research on topics including visualisation, point cloud management, virtual reality, data interoperability, data quality, generating national 3D datasets, indoor 3D, urban planning/permits and underground data management

    Going Beyond Counting First Authors in Author Co-citation Analysis

    Full text link
    The present study examines one of the fundamental aspects of author co-citation analysis (ACA) - the way co-citation counts are defined. Co-citation counting provides the data on which all subsequent statistical analyses and mappings are based, and we compare ACA results based on two different types of co-citation counting - the traditional type that only counts the first one among a cited work's authors on the one hand and a non-traditional type that takes into account the first 5 authors of a cited work on the other hand. Results indicate that the picture produced through this non-traditional author co-citation counting contains more coherent author groups and is therefore considerably clearer. However, this picture represents fewer specialties in the research field being studied than that produced through the traditional first-author co-citation counting when the same number of top-ranked authors is selected and analyzed. Reasons for these effects are discussed

    Variations on the Author

    Full text link
    “Variations on the Author” discusses two of Eduardo Coutinho’s recent films (Um Dia na Vida, from 2010, and Últimas Conversas, posthumously released in 2015) and their contribution to the general question of documentary authorship. The director’s filmography is characterized by a consistent yet self-effacing form of authorial self-inscription: Coutinho often features as an interviewer that rather than express opinions propels discourses; an interviewer that is good at listening. This mode of self-inscription characterizes him as an author who is not expressive but who is nonetheless markedly present on the screen. In Um Dia na Vida, however, Coutinho is completely absent form the image, while Últimas Conversas, on the contrary, includes a confessional prologue that moves the director from the margins to the center of his films. This article examines the ways in which these works stand out in the filmography of a director who offers new insights into the notion of cinematic authorship

    Appropriate Similarity Measures for Author Cocitation Analysis

    Full text link
    We provide a number of new insights into the methodological discussion about author cocitation analysis. We first argue that the use of the Pearson correlation for measuring the similarity between authors’ cocitation profiles is not very satisfactory. We then discuss what kind of similarity measures may be used as an alternative to the Pearson correlation. We consider three similarity measures in particular. One is the well-known cosine. The other two similarity measures have not been used before in the bibliometric literature. Finally, we show by means of an example that our findings have a high practical relevance.information science;Pearson correlation;cosine;similarity measure;author cocitation analysis

    BIM AND GIS INTEGRATION FOR INFRASTRUCTURE ASSET MANAGEMENT: A BIBLIOMETRIC ANALYSIS

    Full text link
    The integration of Building Information Modelling (BIM) and Geographical Information Systems (GIS) is gaining momentum in digital built Asset Management (AM), and has the potential to improve information management operations and provide advantages in process control and delivery of quality AM services, along with underlying data management benefits through entire life cycle of an asset. Work has been carried out relating GeoBIM/AM to buildings as well as infrastructure assets, where the potential financial savings are extensive. While information form BIM maybe be sufficient for building-AM; for infrastructure AM a combination of GIS and BIM is required. Scientific literature relating to this topic has been growing in recent years and has now reached a point where a systematic analysis of current and potential uses of GeoBIM in AM for Infrastructure is possible. Three specific areas form part of the analysis – a review of BIM and Infrastructure AM and GIS and Infrastructure AM leads to a better understanding of current practice. Combining the two, a review of GeoBIM and Infrastructure AM allows the benefits of, and issues relating to, GeoBIM to be clearly identified, both at technical and operational levels. A set of 54 journal articles was selected for in-depth contents analysis according to the AM function addressed and the managed asset class. The analysis enabled the identification of three categories of issues and opportunities: data management, interoperability and integration and AM process and service management. The identified knowledge gaps, in turn, underpin problem definition for the next phases of research into GeoBIM for infrastructure AM

    Dispelling the Myths Behind First-author Citation Counts

    Full text link
    We conducted a full-scale evaluative citation analysis study of scholars in the XML research field to explore just how different from each other author rankings resulting from different citation counting methods actually are, and to demonstrate the capability of emerging data and tools on the Web in supporting more realistic citation counting methods. Our results contest some common arguments for the continued use of first-author citation counts in the evaluation of scholars, such as high correlations between author rankings by first-author citation counts and other citation counting methods, and high costs of using more realistic citation counting methods that are not well-supported by the ISI databases. It is argued that increasingly available digital full text research papers make it possible for citation analysis studies to go beyond what the ISI databases have directly supported and to employ more sophisticated methods

    Author Index

    No full text
    Nao informado

    EuroSDR GeoBIM project a study in Europe on how to use the potentials of BIM and GEO data in practice

    Full text link
    In both the Geo and BIM domains, it is widely acknowledged that the integration of geo-data and BIM-data is beneficial and a crucial step in facing the multi-disciplinary challenges of our built environment. The result of this integration - broadly termed as GeoBIM - has a range of potential uses from district study to road safety. However, from the data perspective, this integration raises the question of how to integrate very detailed design and construction data from the BIM domain with contextual geospatial data (both 2D and 3D) that model a very diverse range of aspects of the wider built and natural environment. This paper reports work carried out during the second phase of the EuroSDR GeoBIM project, which sets out to understand the general status of GeoBIM across Europe with particular focus from a National Mapping and Cadastral Agency perspective. The first phase of the project reviewed the current status of GeoBIM in participating countries and identified the need for specific detailed use cases to overcome both the lack of awareness and the lack of understanding of the potential of GeoBIM. We present both an update on the current status of GeoBIM, and additional details of one of the selected use cases relating to planning/development permits. For the latter, we have been able to develop a detailed workflow highlighting specific data exchange points within the process to issue a development permit, allowing a more in-depth identification of both the roles and data needs at each stage
    corecore