3 research outputs found
MAIN SCIENTIFIC AND METHODOLOGICAL ISSUES OF PSYCHOCRIMINOLOGY IN THE REPUBLIC OF MOLDOVA
The study of basic scientific and methodological problems of criminal psychology and criminology in Moldova. The author of the report presented an analysis of interdisciplinary connections and common research processes in the context of scientific data, as well as criminalistic and psychological concept of the crime mechanism
Annual Technical Progress Report - West Hackberry Tertiary Project
The West Hackberry Tertiary Project is a field test of the concept that air injection can be combined with the Double Displacement Process to produce a tertiary recovery process that is both low cost and economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. In reservoirs with pronounced bed dip such as those found in West Hackberry and other Gulf Coast salt dome fields, reservoir performance has shown that gravity drainage recoveries average 80% to 90% of the original oil in place while waterdrive recoveries average 50% to 60% of the original oil in place. The target for tertiary oil recovery in the Double Displacement Process is the incremental oil between the 50% to 60% waterdrive recoveries and the 80% to 90% gravity drainage recoveries. Air injection on the west flank began in November of 1994. Although west flank air injection has increased reservoir pressure by 500 pounds per square inch (psi), production response has not yet occurred. The gas cap on the west flank has not expanded sufficiently to push the oil rim down to the nearest downstructure well
Recommended from our members
Annual Technical Progress Report - West Hackberry Tertiary Project
The West Hackberry Tertiary Project is a field test of the concept that air injection can be combined with the Double Displacement Process to produce a tertiary recovery process that is both low cost and economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. In reservoirs with pronounced bed dip such as those found in West Hackberry and other Gulf Coast salt dome fields, reservoir performance has shown that gravity drainage recoveries average 80% to 90% of the original oil in place while waterdrive recoveries average 50% to 60% of the original oil in place. The target for tertiary oil recovery in the Double Displacement Process is the incremental oil between the 50% to 60% waterdrive recoveries and the 80% to 90% gravity drainage recoveries. Air injection on the west flank began in November of 1994. Although west flank air injection has increased reservoir pressure by 500 pounds per square inch (psi), production response has not yet occurred. The gas cap on the west flank has not expanded sufficiently to push the oil rim down to the nearest downstructure well
