Exploring the Use of Building Information Modeling (BIM) in Construction Projects in Gaza Strip
Ismail Al Daoor
Faculty of Applied Engineering and Urban Planning,
University of Palestine, Gaza, Palestine,
[email protected] Information Modeling (BIM) is a
process for designing and collaborating using an
intelligent 3D model across the planning, design
and construction of buildings and infrastructure.
It is one of the most promising recent
developments in the Architecture, Engineering,
and Construction (AEC) industry. The objectives
of this study are to investigate and explore the
knowledge implementation of BIM technology
in Gaza Strip (GS) among contracting
companies. To achieve this aim, the research
reviews the literature related to BIM includes;
definition of BIM technology, its benefits and
disadvantages implementation in construction
industry. The study used a questionnaire that was
administered by contracting companies classified
at the Palestinian Contractors Union. Fifty-five
questionnaires were distributed in Gaza strip and
40 questionnaires were received which makes
the response rate 72.7%. The results confirm the
existence of several reasons for challenges in
implementing BIM in construction projects in
the Gaza Strip: (1) Unawareness of BIM
benefits, (2) Lack of training, (3) Lack of
qualified staff to work with the software.
Furthermore, results explored key factors that
can promote applying BIM in the Gaza Strip
construction projects, including; (1) Training of
construction staff, (2) Workshops about
importance of applying BIM, (3) Provide free
and trial versions of the software. Finally, the
study recommended several suggestions on the
use of BIM technology by contractors in the
Gaza Strip construction industry.University of Palestine
Simulation of labor evacuation: The case of housing construction projects
AbstractConstruction sites occupy of the labors who are engaged in many different activities that can expose them to dangerous conditions. During emergencies and extreme events of natural or manmade origin in construction sites, saving labors lives is the primary objective. Therefore, the contractors are required to establish effective emergency plans which have to be improved to aid for rapid egress from construction sites. To support emergency evacuation planning, it is critical to estimate labor evacuation times during project execution. This paper presents a framework that utilizes building information modeling (BIM) and computer simulation to plan the evacuation of labors in construction sites during project execution and to visualize evacuation times of labors at emergency conditions at any time from project duration. The proposed framework utilizes MassMotion software as the simulation platform that enables predicting the labor evacuation times under various conditions. In addition, the evacuation time calculated from computer simulation is used to develop and evaluate the plan. A case study is worked out to demonstrate a simulation of emergency evacuation from a housing building during its construction to demonstrate the use of the proposed framework. Finally, the paper presents the simulation results of labors evacuation in the housing building construction sites
Going Beyond Counting First Authors in Author Co-citation Analysis
The present study examines one of the fundamental aspects of author co-citation analysis (ACA) - the way co-citation
counts are defined. Co-citation counting provides the data on which all subsequent statistical analyses and mappings
are based, and we compare ACA results based on two different types of co-citation counting - the traditional type that
only counts the first one among a cited work's authors on the one hand and a non-traditional type that takes into
account the first 5 authors of a cited work on the other hand. Results indicate that the picture produced through this non-traditional author co-citation counting contains more coherent author groups and is therefore considerably clearer. However, this picture represents fewer specialties in the research field being studied than that produced through the traditional first-author co-citation counting when the same number of top-ranked authors is selected and analyzed. Reasons for these effects are discussed
Variations on the Author
“Variations on the Author” discusses two of Eduardo Coutinho’s recent films (Um Dia na Vida, from 2010, and Últimas Conversas, posthumously released in 2015) and their contribution to the general question of documentary authorship. The director’s filmography is characterized by a consistent yet self-effacing form of authorial self-inscription: Coutinho often features as an interviewer that rather than express opinions propels discourses; an interviewer that is good at listening. This mode of self-inscription characterizes him as an author who is not expressive but who is nonetheless markedly present on the screen. In Um Dia na Vida, however, Coutinho is completely absent form the image, while Últimas Conversas, on the contrary, includes a confessional prologue that moves the director from the margins to the center of his films. This article examines the ways in which these works stand out in the filmography of a director who offers new insights into the notion of cinematic authorship
Appropriate Similarity Measures for Author Cocitation Analysis
We provide a number of new insights into the methodological discussion about author cocitation analysis. We first argue that the use of the Pearson correlation for measuring the similarity between authors’ cocitation profiles is not very satisfactory. We then discuss what kind of similarity measures may be used as an alternative to the Pearson correlation. We consider three similarity measures in particular. One is the well-known cosine. The other two similarity measures have not been used before in the bibliometric literature. Finally, we show by means of an example that our findings have a high practical relevance.information science;Pearson correlation;cosine;similarity measure;author cocitation analysis
Dispelling the Myths Behind First-author Citation Counts
We conducted a full-scale evaluative citation analysis study of scholars in the XML research field to explore just how different from each other author rankings resulting from different citation counting methods actually are, and to demonstrate the capability of emerging data and tools on the Web in supporting more realistic citation counting methods. Our results contest some common arguments for the continued
use of first-author citation counts in the evaluation of scholars, such as high correlations between author rankings by first-author citation counts and other citation
counting methods, and high costs of using more realistic citation counting methods that are not well-supported by the ISI databases. It is argued that increasingly available digital full text research papers make it possible for citation analysis studies to go beyond what the ISI databases have directly supported and to employ more
sophisticated methods
koamabayili/VECTRON-author-checklist: VECTRON author checklist
We have done our best to complete the author checklist relating to the use of animals in the hut study. Note that the objective for the hut study was to evaluate the IRS treatment applications for residual efficacy against Anopheles mosquitoes, including the local An. coluzzii mosquito population. Cows were only used to attract mosquitoes into the huts and no tests were carried out directly on the cows. The author checklist is intended for use with studies where experiments are carried out on animals, which is why we have had such difficulty in completing this for the hut study, as many of the questions do not relate to how the cows were used
Author-wise bibliometric analysis based on entropy.
Author-wise bibliometric analysis based on entropy.</p
- …