Jurnal Perangkat Nuklir
Not a member yet
109 research outputs found
Sort by
RANCANGAN PEMBANGKIT SINYAL UNTUK SIMULASI MASUKAN MODUL ANTARMUKA KAMERA GAMMA
A Signal Generator has designed for input simulation of Gamma Camera interface modul. Generated signals are 2 position signal X and Y with amplitude about ± 5 Volt randomize and logic signal Z. Signal amplitudo is limited by form and position offset parameter, then the signals will be appearing to a square or a circular image form.The system is designed using DT 51 microcontroler module series with it's software. Thedesign has tested using trainer board, and a test results has find a non linearity of DACat 3 bits LSBTelah dirancang pembangkit sinyal untuk simulasi masukan modul antarmuka Kamera Gamma. Sinyal yang dibangkitkan 2 buah sinyal posisi X dan Y dengan amplitudo ± 5 Volt secara random dan sebuah sinyal logik Z. Amplitudo sinyal dibatasi oleh parameter pola dan offset posisi sehingga jika sinyal ini dicitrakan akan terjadi citra bentuk kotak atau lingkaran. Sistem dirancang menggunakan keluarga modul mikrokontroler DT 51 beserta perangkat lunaknya. Rancangan diuji coba menggunakan board pelatihan, sedangkan hasil pengujian didapat adanya ketidak linieran konversi DAC pada 3 bit LS
SISTEM MONITORING MULTI REMOTE-SENSOR NIRKABEL: STUDI KASUS MONITORING TEMPERATUR DAN KELEMBABAN 01 RUANG TERBUKA/TERTUTUP
The system which was arranged is for telemetry system with two ways communication bet-ween "master" which acts as a "supervisor" and "slave" which acts as "executor" every commands from master. The communication use radio frequency radio (RF) which range between 2.3 - 2.5 GHz, and the vital components in this system are sensor, transceiver, microprocessor and computer. When the system is turn-on, the master and slave initially act as receiver and that condition is idle as long as master doesn't give or send a command to the slave. Master acts as a transmitter after from computer receiving a command to send a message to the slave in purpose to measure temperatur and humidity through the sensor, and then master - at once - directly change character as a receiver after the message was sent. The slave after receiving the message from master directly - at once - change itself to be a transmitter and sends or transmits the temperature and humidity data from sensor, then after the data transmission completed the slave sends a special message in purpose to tell the master that the all data were sent. During the data transmission from the slave to master, the data directly send to the computer in real time mode for displaying and after the transmission completed the data save in the database, and in the database system any slave having a special file to keep the data. After the data completely saved master sends Sistem yang dibangun ini merupakan sistem telemetri dengan komunikasi dua arah antara "etesen" atau "master" dan "pelaksana" atau "slave"yang menggunakan frekwensi radio (RF) dengan komponen yang terpenting adalah sensor, mikroprosesor dan transceiver termasuk battery yang memberikan daya kepada slave untuk bekerja. Dalam sistem ini slave bekerja mengikuti perintah dari master untuk mengirimkan data baik secara insidentil maupun secara bergilir, pada saat tidak ada perintah atau "idle" slave tetap bersikap sebagai penerima atau receiver namun ketika menerima perintah dari master langsung mengambil data dari sensor yaitu temperatur dan kelembaban. Setelah data diperoleh slave meng-inisialisasi dirinya menjadi pemancar atau trans-mitter untuk mengirim data temperatur dan kelembaban, pengiriman terdiri dari dua tahap yaitu pengiriman data integer kemudian tahap kedua pengiriman data desimal yang semuanya dilakukan secara berulang- ulang untuk memperoleh nilai yang akurasi. Data yang dikirim oleh slave kepada master langsung diteruskan secara real-time ke komputer untuk ditayangkan (displaying), dan ketika slave mengirim pesan bahwa pengiriman data se/sesai maka komputer yang kemudian memutuskan untuk sementara hubungannya dengan mikrokontroler di pihak master untuk menjaga keamanan data. Data yang sudah diperoleh langsung disimpan dalam da-tabase komputer sementara master dan slave semua dalam keadaan idle kembali sebagai penerima dan siap menanti tugas berikutnya untuk proses meminta dan menerima data
KETAHANAN PANAS PADUAN ALUMINIUM SEBAGAI BAHAN KONSTRUKSI
The analysis of aluminum alloy for boarding ways, curtain laboratory in nuclear activity, several laboratory, and others, after fire resistance test was investigated. Aim of this test is to understand short aluminum alloys resist to the fire. A rolling door material by a local product is used as a sample in these experiment. The experiment method was investigated according to NFPA417: Standard on construction and protection of aircraft loading walkways 1985 edition, where the sample is suddenly heated by 650°C temperature. The visual activity was carried out for physics observation, and mechanical characteristic was observed by cutting of the samples in which before. and after fire resistance test. The microstructure was investigated by Scanning Electron microscope, that analysis for structure and composition of surfaces were understood. Result of these observation show that sample color were change firm white to brown, mechanical characteristic were change from tough to brittle, but the samples shape as a construction material and surface microstructure relative constant conclusion of these experiment is that the sample resistance to fire test to it suitable for construction material. Telah dilakukan analisa paduan aluminium untuk bahan konstruksi boarding ways, sekat pada laboratorium bidang nuklir maupun laboratorium yang lain atau sejenis, setelah dilakukan fire test. Kegiatan ini dimaksudkan untuk mengetahui kemampuan bahan tersebut terhadap pengaruh suhu akibat kebakaran (fire resistance). Bahan paduan aluminium berupa lembaran yang digunakan sebagai rolling-door, produksi loka/. Metoda pelaksanaan kegiatan dilakukan dengan memberikan suhu pada sampel setinggi sekitar eso«: secara mendadak, sesuai dengan standar NFPA 417: Standard on Construction and Protection of Aircraft Loading Walkways, edisi 1985. Pengamatan fisik dilakukan secara visual, dan pengamatan sifat mekaniknya dilakukan dengan memotong sampel sebelum dan sesudah dipanasi, perubahan struktur mikro dianalisa dengan Scanning Electron Microscope dan perubahan komposisi kimia permukaan dianalisa dengan Energy Diffraction X-ray. Hasil pengamatan menunjukkan adanya perubahan warna sampel dari putih ke coklat, sifat mekanis berubah dari liat menjadi getas (brit/e), namun bentuk fisik dan struktur mikro relatif tetap. Dari hasil uji ini dapat disimpulkan bahwa paduan aluminium tahan terhadap uji kebakaran dan layak digunakan sebagai bahan konstruksi
PEREKAYASAAN PENCACAH RIA IP10.1 UNTUK DIAGNOSIS KELENJAR GONDOK
A development of Radioimmunoassay (RIA) IP10.1 equipment for Thyroid Diagnosis as an innovation of PRPN BATAN has been done in year 2011, especially for the mechanic module and the software acquisition. By adding the casing around the body of the mechanic module and the user friendly software acquisition, the prototype becomes perfect. Like its predecessor, the RIA IP10.1 still uses 5 detectors for 50 sample counting process. Perekayasaan perangkat Radioimmunoassay (RIA) IP10.1 untuk diagnosis kelenjar gondok merupakan inovasi yang dilakukan oleh Pusat Rekayasa Perangkat Nuklir (PRPN) – BATAN pada tahun 2011. Inovasi yang dilakukan pada perangkat RIA IP10.1 adalah pada modul mekanik dan perangkat lunak. Pada kegiatan kali ini perangkat Radioimmunoassay (RIA) IP10.1 telah disempurnakan dengan penambahan Casing dan perangkat lunak yang lebih mudah dioperasikan. Seperti pendahulunya, perangkat RIA IP10.1 juga menggunakan 5 buah detektor untuk proses pencacahan 50 (Lima Puluh) sample
ANALILIS PENGARUH GESEKAN TUMPUAN TERHADAP SISTEM PERPIPAAN REAKTOR NUKLIR
ANAL YSIS OF THE INFLUENCE OF FRICTION SUPPORT ON THE PIPING SYSTEM OF NUCLEAR REACTOR. has done an model analysis of the primary pump system nuclear reactor at with caesar /I software. analysis done on the support of the friction force that supports the pipe on the primary pump system. enetysis of friction on the support in the main piping system at the pump system is very difficult, due to the rotating system must follow the code and standards of API 610. to overcome this it is necessary to set the support and model analysis using the friction on the support with the material of steel. From the running of the program the pump piping system is obtained stress does not occur and the system can be recommended in a safe condition. ANALISIS PENGARUH GESEKAN TUMPUAN TERHADAP SISTEM PERPIPAAN REAKTOR NUKLIR. Telah dilakukan anallsis terhadap model sistem pompa primer. reaktor nuklir dengan software Caesar /I. Analisis dilakukan pada tumpuan terhadapgaya gesek yang mendukung pipa pada sistem pompa primer. Analisis gesekan pada tumpuan dalam Sistem perpipaan utamanya pada sistem pompa sangat sulit dilakukan, dikarenakan pada sistem yang berputar harus mengikuti standard dan CODE, API 610. Untuk mengatasi hal tersebut dipasang tumpuan dan analisis model menggunakan friksi pada tumpuan dengan material dari Baja. Dari hasil run program didapatkan hasil sistem perpipaan pompa tidak terjadi stress dan sistem dapat direkomendasikan dalam keadaan aman
Simulasi Distribusi Tegangan Sisa Dalam Proses Pengelasan Plat Dengan Metode Elemen Hingga
Simulation of Residual Stress Distribution on Welding Process For Plate Using Finite Element Method. Simulation and modeling were performed to calculate the residual stress on plate welding. The calculation was carried out on the 3 kinds of butt welding types of I, V and Y type. The steel plate St E460 with 16 mm thick, and the welding material standard with the heat conductivity of k = 12 x106 WI °K.m2 and thermal expansion of a = 1 Ox1 0-6 mm/mm were used as a model. The residual stress was calculated by iteration of the strain which was obtained from the temperature distribution during the cooling process on the welding temperature of 25000C to the room temperature by the transient calculation model. The calculation was done by the finite element method using the 2 dimension modeling of ANSYS 5.4. program. The stress distribution showed the residual stress on the welded area was 100 to 550 MPa, depends on the welded junction type. Simulasi dan pemodelan dilakukan untuk menghitung distribusi tegangan sisa dalam proses pengelasan pelat. Perhitungan dilakukan untuk 3 macam tipe sambungan tumpu (butt welded joint) yaitu tipe I, tipe V dan tipe Y. Untuk model perhitungan ditentukan pelat dari baja St E460 dengan tebal sama 16 mm, sedangkan material standard las dengan data koefisien konduksi panas, k = 12 x106 WI °K.m2, dan angka muai termal, a = 10 x10-6 mm/mm. Tegangan sisa dihitung berdasarkan iterasi regangan yang timbul akibat distribusi suhu selama pendinginan dari suhu pengelasan sebesar 2500°C menuju temperatur ruang dengan model perhitungan kondisi transient. Perhitungan berdasarkan metode elemen hingga dengan program ANSYS 5.4. model 2 dimensi. Distribusi tegangan menunjukkan harga tegangan total pad a bahan las berkisar antara 100 sampai dengan 550 MPa, bergantung pada tipe sambungan la
SISTEM MONITORING MATERIAL CLOGGING PADA REAKTOR LOW LINIER DENSITY POLYETHYLENE DENGAN RADIASI GAMMA
MATERIAL CLOGGING MONITORING SYSTEM IN LOW LINIER DENSITY POLYETHYLENE REACTOR USING GAMMA RADIATION. The clogging monitor system of LLDPE (Low linier density polyehilene) has been constructed using absorption gamma radiation methode. The gamma source 137Cs puts in the centre of the proces LLDPE Reactor and the detectors system (12 detectors) install serounding outside of the LLDPE Reactor process. The detectors system are connected to data acqusition and a computer system, is used to produce two dimentional topography profile. The advantage of this system is both non contact and on line clogging mesurement of reactor process. So it can predict clogging material in advance SISTEM MONITORING MATERIAL CLOGGING PADA REAKTOR LOW LINIER DENSITY POLYETHYLENE DENGAN RADIASI GAMMA. Telah dikonstruksi sistem monitor clogging reaktor proses pada pembuatan biji plastik jenis LLDPE (low linier density polyethilene) menggunakan metoda absorpsi radiasi gamma. Dengan menempatkan sumber radiasi gamma tepat ditengah bejana (reaktor) proses, sedangkan pancaran radiasi gamma yang keluar dari sumber gamma jenis 137Cs itu, dideteksi oleh detektor yang berada disekeliling luar bejana proses, yang berjumlah 12 unit detektor, hasil dari pengolahan signal dari ke duabelas detektor oleh komputer memberikan informasi dinamis keadaan material proses didalam bejana (reaktor) proses, Sedangkan profil tampilan monitor hasil pengukuran berbentuk topografi dua dimensi. Keunggulan sistem ini bila dibandingkan sistem yang lain yaitu dapat digunakan secara on line untuk memonitor fluktuasi meterial didalam bejana proses tanpa kontak langsung dengan material proses dan sekaligus dapat digunakan untuk memprediksi kemungkinan terjadinya clogging pada saat proses berlangsun
PRARANCANGAN PENGOLAHAN LlMBAH RESIN BEKAS TANPA BAHAN MATRIKS DARI PLTN TIPE PWR 1000 MW
PRE DESIGN PROCESSING OF WASTE of EX-RESIN WITHOUT MATERIALS MATRIX FROM NUCLEAR POWER PLANT TYPE PWR 1000 MW Have been done pre design processing of waste ex-resin without capacities matrix materials from nuclear power plant type PWR 1000 MW During the time radioactive waste of ex-resin processed to use process of immobilization use matrix materials like mixture cement and epoxy resin and then conditioning. This process is not effective and efficient because end result volume of end product bigger than volume early operation system and maintenance of its installation more difficult. To overcome this created a design of technology processing of waste of ex- resin without matrix materials through process of strainer, drying and conditioning represent technological innovation newly processing of radioactive waste of ex-resin. Besides this process more effective and efficient, volume of end product waste much more small from volume early and operation system and maintenance of its easier installation. Pre design is expected to be used as a basis to make conceptual of pre design installation of strainer, drying and conditioning for the processing of waste of ex- resin from nuclear power plant type PWR 1000 MW PRARANCANGAN PENGOLAHAN LlMBAH RESIN BEKAS TANPA BAHAN MA TRIKS DARI PL TN TlPE PWR 1000 MW Telah dilakukan prarancangan pengolahan limbah resin bekas tanpa bahan matriks dari PL TN tipe 1000 MW Selama ini limbah radioaktif resin bekas diolah menggunakan proses immobilisasi menggunakan bahan matriks seperti campuran semen dan resin epoksi kemudian dikondisioning. Proses ini kurang efektif dan efisien karena volume hasil akhir olahan lebih besar dari volume awal limbah dan sistem pengoperasian dan perawatan instalasinya lebih sulit. Untuk mengatasi hal ini dibuat suatu prarancangan teknologi pengolahan limbah resin tanpa bahan matriks melalui proses penirisan, pengeringan dan kondisioning merupakan inovasi teknologi baru pengolahan limbah radioaktif resin bekas. Selain proses ini lebih efektif dan efisien volume hasil akhir olahan jauh lebih kecil dari volume awal limbah dan sistem pengoperasian dan perawatan instalasinya lebih mudah. Prarancangan ini diharapkan dapat digunakan sebagai dasar untuk membuat konsepsual prarancangan instalasi penirisan, pengeringan dan kondisioning untuk pengolahan limbah resin bekas dari PL TN PWR 1000M
RANCANG BANGUN PERANGKAT LUNAK SIMULATOR REAKTOR NUKLIR
DEVELOPMENT OF SOFTWARE PACKAGE OF NUCLEAR REACTOR SIMULATOR FOR NPP SOCIALIZATION. Development of software package of nuclear reactor simulator for socialization of nuclear power plant has been carried out. This work used RSG GA Siwabessy as a model reactor. The choice of RSG GAS to be simulated is based on consideration of its complete physical characteristic and operation data. To simulate processes occurring in the reactor, the simulator program simulates them as many as possible through a compact display. This simulator is developed using a programming software package LabVIEW to describe process computation in the reactor. Dynamic displays demonstrating any dynamic processes occuring in RSG GAS have been simulated. The result of this development is a software package that is able to simulate RSG GAS operational system. The development of this simulator including its neutronik and thermohidraulic aspects is outlined in this paper. RANCANG BANGUN PERANGKAT LUNAK SIMULATOR REAKTOR NUKLIR UNTUK SOSIALISASI PLTN. Telah dilakukan rancang bangun perangkat lunak simulator reaktor nuklir untuk sosialisasi PLTN. Pada kegiatan ini, RSG GA Siwabessy digunakan sebagai suatu model. Pemilihan RSG GAS untuk disimulasikan berdasarkan pertimbangan kelengkapan data karakteristik fisis dan data operasi. Rancang bangun perangkat lunak ini dilakukan dalam bentuk visualisasi proses operasi yang ada di dalam RSG GA Sywabessy dan dibuat dengan menggunakan perangkat lunak Labview. Untuk menyimulasikan proses yang terjadi di dalam reaktor, simulator menampilkan sebanyak mungkin proses yang terjadi melalui tampilan yang kompak. Perangkat lunak simulator ini dirancang-bangun dengan memanfaatkan paket program LabVIEW untuk menyimulasikan perhitungan proses yang ada di dalam teras reaktor. Tampilan yang dinamis yang menunjukkan segala dinamika yang terjadi di dalam RSG GA Siwabessy berhasil disimulasikan. Hasil dari rancang bangun ini adalah sebuah perangkat lunak simulator yang mampu menyimulasikan sistem operasi RSG GA Siwabessy. Pembuatan perangkat lunak simulator dengan aspek neutronik dan thermohidrolik diuraikan dalam makalah ini
PERHITUNGAN KETEBALAN BAHAN KOMPOSIT KARET ALAM TIMBAL OKSIDA UNTUK PROTEKSI RADIASI SINAR - X 100 Kev
The Thickness Calculation Of Lead Oxide Natural Rubber Composite For X-Ray Rodietion Protection. The thickness calculation of lead oxide natural rubber composite for x-ray radiation protection has been done for 100 kev energy x-ray. The calculation is to obtain the thickness of reaietiou protection that was safe for environment or worker who works in radiation field. The calculation of absorption strength of lead oxide natural rubber composite is started by lead oxide composite 550 part per one hundred rubber (pphr) until 1000 part per one hundred rubber. the lead okside natural rubber composite thickness to be calculated is 2.5 mm. The result of calculation shows that the thickness of substance lead oxide natural rubber composite was safe for environment or worker who works in radiation field, if the 550 part per one Iwndrecl rubber lead oxide was mixed with natural rubber. The value of absorption strength on 550 pert per one hundred rubber is standart permitted. Perhitungan ketebalan Bahan Komposit Karet Alam Timbal Oksida Untuk Proteksi Radiasi Sinar-x 100 K