Jurnal Manajemen Bisnis Transportasi dan Logistik
Not a member yet
    306 research outputs found

    PENGARUH JUMLAH BUS SIAP OPERASI DENGAN JUMLAH PENUMPANG DIANGKUT PADA PT. JAKARTA MEGA TRANS

    Full text link
    PT. Jakarta Mega Trans (PT. JMT) is a TransJakarta bus operator and formed of four transport companies consortium which are PT. Mayasari Bakti, PT. Steady Safe, Perum PPD, and PT. BPW Pahala Kencana. This study is aimed to find out and understand the relationship between the operated buses and the carried passengers. The method of the study is Spearman Rank correlation analysis and hypothesis test. Based on the result and analysis, there is a significant relationship between the operated buses and carried passengers which is ρ = 0.7824. The hypothesis test shown that ρhitung > ρtabel (0.7824 > 0.777) which support the previous result

    EFEKTIVITAS KERJA OPERATOR TOWING CARMELALUIPENENTUAN WAKTU BAKU

    Full text link
    Akebono Astra Indonesia Jakarta (AAIJ) is a manufacturing company with major product brake for vehicle wheels 2 and 4 as a main product. In distributing goods in plant 1, this company use material handling equipment such as towing car. Problems encountered is the lack of accurate measurement of working time although it has added rating factor and allowances. Because of the time in the field, car towing operator work time longer than the company expected. One way of measuring standard time (working time has been added rating factor and allowances) is the stopwatch method (clock stop). The purpose of writing is to know the amount of the actual car towing cycle time and standard time, how the elements of the work and standardizing the order of elements of the work and effectiveness of the towing car to the period of 2014. From this study, it is expected the company can improve operator effectiveness towing ca

    KESIAPAN ARMADA TRUK SIAP OPERASI TERHADAP JUMLAH UNIT BARANG

    Full text link
    PT. Dressage Logistics Indonesia is a company engaged in logistics, especially trucking. Allegedly there is a relationship between the use of Ready Truck Operations with Goods These Units Falkirk. The method of data analysis used a simple linear regression, correlation coefficient analysis, and hypothesis testing (correlation test). Results of analysis and discussion revealed that there is a relationship between the number of trucks ready for operation on the number of units of goods are shown with a simple regression line is: y = - 17705.3 + 65,15X, meaning that when the growing number of trucks ready for operation up 1 (one) units, the number of units of goods having a gain of 65.15 units of goods. The correlation coefficient r = 0.64 means that the relationship variable X (number of trucks ready for operation) and Y (number of units of goods) is strong and positive. Determinant coefficient test figures show 40.96%. Hypothesis test results tcount> t table (2.62> 0.81246), then Ho = rejected and Ha = acceptable, meaning terhadapat significant relationship between the number of trucks ready for operation and the number of units of goods

    AN OVERVIEW OF INDONESIAN LOGISTIC PERFORMANCE AND THE SISLOGNAS 2012

    Full text link
    Indonesian Logistic Performance Ranking is lower than other ASEAN Countries so it needs a lot of concerns, because  the economy is strongly influenced by the condition and system of the logistics. The purpose of this article is to find out Indonesian Logistics Performance by analyzing the World Bank indicators and description, compare it to the opinion of the practitioners in the logistics sector.  Indonesian government  is facing this logistic problem as a system to increase the national competitiveness and suport the implementation of  the Accelaration of Indonesian Economy  Development Masterplan 2011-2025.  By applying the “Wilcoxon Sign Test”, proofing that there are no significant differences between the World Bank and the logistic practitioners in scoring the logistics indicators

    KEPUASAN PELAYANAN PELANGGAN DENGAN MENINGKATKAN KETERAMPILAN DAN KESADARAN MENTAL SUMBER DAYA MANUSIA

    Full text link
    Human Resources Development is an organization's activities must be carried out, so that knowledge (knowledge), abilities (abilities) and skills (skills) they are in accordance with the demands of the job they do. In the field of services, especially transportation, in truth, in this section should be special attention which both the management and the employees have the mental awareness to focus, concentrate, development and innovate, given the mental attitude has to be in good condition, sometimes, can easily fade back

    Utilisasi Penumpukan Peti di Depo Peti Kemas

    Full text link
    Based on the analysis of Queing Theory, the utilisation of the first location A.04.1 shows that the crate box 2.21/day (λ1), the crate box 0.2217/day (m1), 4.75 % (r1) and the crate box of the second location A.04.2 is 5.93/day (λ2), 0,3788 the crate box/day (m2), and 7,45% (r2). These results show that the utilisation of the two locations are below of what is expected. In this case, the research has provided the solutions which are to increase the traffic or volume of the crate and increase the marketing of the location utilisations using 4P’s (Product, Price, Promotion, Place)

    302

    full texts

    306

    metadata records
    Updated in last 30 days.
    Jurnal Manajemen Bisnis Transportasi dan Logistik
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇