University of America

Lumieres - Repositorio institucional Universidad de América
Not a member yet
    3877 research outputs found

    Evaluation of the partial replacement of raw materials of the “desinfect & clean” product for the company C.I. Liansa S.A.S.

    No full text
    The company C.I. LIANSA S.A.S. (Bio2Eco), commercializes a line of industrial disinfectant products, which are intended to be affordable, ecological and of quality. The company is in the commercialization of a product called "Desinfect & Clean"; this product is sold to a shopping center in the city of Medellin, but it is not yet freely available in the market. One of the challenges of this project is to ensure that by making changes to the product, quality is maintained. A physical or chemical improvement is sought to obtain a final product that competes with the products that are already on the market, complying with the characteristics of a disinfectant that acts on gram positive and gram negative bacteria.La empresa C.I. LiansaS.A.S. (Bio2Eco), comercializa una línea de productos desinfectantes industriales, los cuales, se busca que sean asequibles, ecológicos y de calidad. La empresa se encuentra en la comercialización de un producto denominado “Desinfect & Clean”; este producto se vende a un centro comercial de la ciudad de Medellín, pero aún no está disponible libremente en el mercado. Uno de los desafíos de este proyecto es asegurar que, al realizar modificaciones en el producto, se mantenga la calidad. Se busca realizar una mejora física o química, para obtener un producto final que compita con los productos que ya están en el mercado, cumpliendo con las características de un desinfectante que actúe sobre bacterias gram positivas y gram negativas.C.L. Liansa S.A.S

    Development of a proposal for improvement in the preparation of molded cones on the production lines (mta i and ii) in the Soluciones Omega Plant (Mosquera)

    No full text
    A verification of the raw materials to verify that the Colombian standard complies with the grammages of each of the raw materials with respect to the formulation of each cookie was made and in turn the measurement systems used in the manufacture of the mixtures were evaluated to determine if any of these points were influential in the variation of the mixture's elaboration; The physicochemical and microbiological characterization of each of the raw materials and the finished product was carried out, in order to guarantee the quality and nutritional grade of these. A description of the environmental variables of the plant was carried out, step by step, the verification of the current formulations, the analysis of the fermentation process of the mixtures, the comparison between the fermentation conditions and the environmental conditions of the plant, the use of some of the raw materials, the identification of some critical points and critical control points were verified. All this to carry out the design of a robust proposal where three problems present in the plant will be mitigated, which were the variation in the manufacture of mixtures due to lack of standardization of the process, the rejection of mixtures, which is one of the largest problems present in the molded biscuit production line; Finally, the lack of controls that allow determining the real state of the mixture and the remaining time before cleaning the pipe.Se realizó una verificación de las materias primas para corroborar que se cumple con la norma Colombiana los gramajes de cada una de las materias primas con respecto a la formulación de cada galleta y a su vez se evaluaron los sistemas de medida utilizados en la fabricación de las mezclas para determinar si alguno de estos puntos eran influyentes en la variación de la elaboración de la mezcla; se realizó la caracterización fisicoquímica y microbiológica de cada una de las materias primas y del producto terminado, con el fin de garantizar la calidad y el grado alimenticio de éstas. Se llevó a cabo una descripción de las variables ambientales de la planta, etapa por etapa, la comprobación de las formulaciones actuales, el análisis del proceso de fermentación de las mezclas, la comparación entre las condiciones de fermentación y las condiciones ambientales de la planta, se verificó el uso de algunas de las materias primas, la identificación de algunos puntos críticos y puntos críticos de control. Todo esto para realizar el diseño de una propuesta robusta donde se logrará mitigar tres problemas presentes en la planta, los cuales eran la variación en la fabricación de mezclas por falta de estandarización del proceso, el rechazo de mezclas, el cual es uno de los mayores problemas presentes en la línea de producción de galletas moldeadas; por último, la falta de controles que permitan determinar el estado real de la mezcla y el tiempo remanente antes de realizar el aseo a la tubería.Planta de soluciones Omeg

    Comparative analysis between the primary Half Pensional Regime (phpr) and the Individual Savings Regime with Solidarity (isrs) in Colombia

    No full text
    Pensioning in Colombia is considered a privilege, factors such as the increase in unemployment and the deterioration of job stability, do not facilitate the process to access a pension allowance. Although reform is necessary, one should not fall into the belief that there is no pension future for the country. In the current pension systems (RPM and RAIS), more than 22 million Colombians are affiliated, which are the result of joint work by the State, pension administrators (Colpensiones, Porvenir, Proteccion Colfondos and Old Mutual) and workers.El pensionarse en Colombia es considerado un privilegio, factores como el aumento del desempleo y el deterioro de la estabilidad laboral, no facilitan el proceso para acceder a una mesada pensional. Aunque si es necesaria una reforma, no se debe caer en la creencia de que no hay un futuro pensional para el país. En los regímenes pensionales actuales (RPM y RAIS) se encuentran afiliados más de 22 millones de colombianos, los cuales son resultado de un trabajo conjunto por parte del Estado, las administradoras de pensiones (Colpensiones, Porvenir, Protección Colfondos y Old Mutual) y los trabajadores

    Administrative technical restructuring in the company Productos Limpieza Fácil S.A.S.

    No full text
    The present degree work carried out a proposal of administrative technical restructuring for the company Productos Limpia Fácil S.A.S., with the objective of improving productivity and profitability of the company, this focused on its internal processes.El presente trabajo de grado realizó una propuesta de reestructuración técnico administrativa para la empresa Productos Limpia fácil S.A.S., con el objetivo de mejorar productividad y rentabilidad de la empresa, esto enfocado en sus procesos internos.Productos Limpia Fácil S.A.S

    Manual de buenas prácticas de manufactura en empresa Tejada Trading y Cia S.A.S línea cosméticos

    No full text
    Due to the growing need of organizations to guarantee the quality of their products, Good Manufacturing Practices-BPM are born as a solution to this requirement. For the realization of the present monograph we worked in the collaboration of the company Tejada Trading & Cia SAS, who when wanting to venture into the market with their cosmetics line, saw the need to implement the BPM in order to ensure the quality of their products.Debido a la creciente necesidad de las organizaciones de garantizar la calidad de sus productos, las Buenas Prácticas de Manufactura-BPM nacen como solución a este requerimiento. Para la realización de la presente monografía se trabajó en colaboración de la empresa Tejada Trading & Cia S.A.S., quienes, al querer incursionar en el mercado con su línea de cosméticos, vieron la necesidad de implementar las BPM con el fin de asegurar la calidad de sus productos

    New market strategies for the equipment and tools inspection service of SAIS S.A.S.

    No full text
    This is a project which seeks to provide a market alternative for the company SAIS S.A.S to not only dependent on the oil and gas industry as it currently does, but it comes to venture into new sectors looking for the necessary strategy to make it and turn resulting in further expansion market.Este es un proyecto en el cual se busca ofrecer una alternativa de mercado, para que la empresa SAIS S.A.S no solo dependa del sector petrolero como lo hace actualmente, sino que llegue a incursionar en nuevos sectores buscando la estrategia necesaria para hacerlo y a su vez tener como resultado una mayor ampliación en el mercado

    Internship in international projects with the company KUBO Architecture & Engineering, Málaga, Spain

    No full text
    The international internships offered by the University of America Foundation in agreement with foreign companies, seek to provide students with an opportunity to expand their work horizons, linking them with international companies in other countries, with the aim of enriching their cultural heritage and establishing connections type of work for the future. Since 2017 they are the second degree option of the Faculty of Architecture, an option in which students can test the knowledge acquired in the university during the five years of training and at the same time acquire knowledge in the areas of design, planning and execution of projects.Las pasantías internacionales ofrecidas por la Fundación Universidad de América en convenio con empresas extranjeras, buscan brindar a los estudiantes una oportunidad para ampliar sus horizontes de trabajo, vinculándolos con empresas internacionales en otros países, con el objetivo de enriquecer su acervo cultural y establecer conexiones de tipo laboral para el futuro. Desde el año 2017 son la segunda opción de grado de la Facultad de Arquitectura, opción en la que los estudiantes pueden poner a prueba los conocimientos adquiridos en la universidad durante los cinco años de formación y al mismo tiempo se adquieren conocimientos en las áreas de diseño, planeación y ejecución de proyectos.KUBO Architecture & Engineering, S.L.P

    Design of Cleaning Machine for Motors and Components, by ultrasound, for the grinding company of Motors Sierra LTDA

    No full text
    This project was carried out in order to satisfy the need of the grinding company of Engines Sierra LTDA, to carry out a washing of engines and their components, allowing you to increase the quality of your services by effectively cleaning them. In order to achieve this task, specific requirements were defined as regards the needs of the company, alternatives were established and relevant calculations were developed, selecting components and conclusions and recommendations.Este proyecto se realizó con el fin de satisfacer la necesidad de la empresa Rectificadora de Motores Sierra LTDA, de realizar una lavado de motores y sus componentes, permitiendo aumentar la calidad de sus servicios por medio de una limpieza efectiva de estos. Para lograr este cometido, se definieron los requerimientos específicos en cuanto a las necesidades de la empresa, se establecieron alternativas y se desarrollaron los cálculos pertinentes, seleccionando los componentes y por último las conclusiones y recomendaciones.Empresa Rectificadora de Motores Sierra LTD

    Implementation of the work safety and health management system, according to the guidelines established by decree 1072 of 2015, resolution 1111 of 2017, law 1562 of 2012 and decree 052 of 2017 for the company Invotecsa SAS

    No full text
    The objective of this degree project is to implement the Occupational Health and Safety Management System based on the guidelines established in Decree 1072 of 2015 and Resolution 1111 of 2017 in the company Invotecsa Innovaciones Tecnológicas SAS, located in the Bogotá City in the neighbourhood of Teusaquillo, which has as its main activity "Computer consulting activities and facilities management activities", among others. This in order to minimize the hazards and risks associated with each of the activities that workers are exposed to on a daily basis and in this way to achieve an adequate work environment and likewise can perform their functions in optimal, safe, reliable conditions, in addition to comply fully with the requirements demanded by current legal regulations.El presente proyecto de grado tiene como objetivo implementar el Sistema de Gestión de la Seguridad y Salud en el Trabajo con base en los lineamientos establecidos en el Decreto 1072 de 2015 y la Resolución 1111 de 2017 en la empresa Invotecsa Innovaciones Tecnológicas S.A.S., ubicada en la ciudad de Bogotá en la localidad de Teusaquillo, la cual tiene como actividad principal “Actividades de consultoría informática y actividades de administración de instalaciones”, entre otras. Esto con el fin de minimizar los peligros y riesgos asociados a cada una de las actividades que los trabajadores se encuentran expuestos a diario y de esta manera lograr un ambiente laboral adecuado y así mismo puedan cumplir sus funciones en condiciones óptimas, seguras, confiables, además de cumplir a cabalidad con los requisitos exigidos por la normatividad legal vigente.Compañía Invotecsa SAS

    Design of a mobile heated chamber for the transport of flowers

    No full text
    For the project, a feedback with the flower growers begins, resulting in a problem in the product's cold chain, subsequently determining the most important functional parameters of the mobile heated chamber for the transport of flowers. Once the parameters and concepts needed for the design are determined, the selection of the best cooling system is made, as well as other components that will allow the best chamber performance. Subsequently, the detailed design of the refrigeration, storage, power and mobile systems is carried out, achieving an appropriate result for its operation. Then the assembly drawings of each of the fundamental parts in case of construction are made using Autodesk Inventor software.Para el proyecto se comienza con una retroalimentación de información con los cultivadores de flores dando como resultado una problemática en la cadena de frío del producto, posteriormente se determinan los parámetros funcionales más importantes de la cámara climatizada móvil para el transporte de flores. Una vez determinado los parámetros y conceptos que se necesitan para el diseño, se hace la selección del mejor sistema de refrigeración, al igual que otros componentes que permitirán el mejor desempeño de la cámara. Posteriormente se realiza el diseño detallado de los sistemas de refrigeración, almacenamiento, alimentación y móvil, logrando un resultado apropiado para su funcionamiento. Después se realizan los planos de ensamble de cada una de las piezas fundamentales en caso de construcción mediante el software Autodesk Inventor

    141

    full texts

    3,877

    metadata records
    Updated in last 30 days.
    Lumieres - Repositorio institucional Universidad de América
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇