Filling Blockmould by Tip Wagon
Image of workers pouring concrete from a small cart into moulds
Concreting Top Plug of No. 14 With Two Gear Driven Mixers Placed on Top of Well.
Image of workers concreting the top plug of the No. 14 well with two gear-driven concrete mixers
No. 12 Caisson Afloat
Image of the No. 12 caisson floating within a part of the bridge structure
Starting Masonry on No. 4 With Chambal Derrick
Image of cranes and workers doing masonry work on a portion of the Hardinge Bridge
Completing Sinking of No. 6 Well With Gallows 40 CFT Dredgers and Electric Hoists
Image of workers sinking the No. 6 well into the bed of the Padma River with gallows, 40 cubic foot dredgers, and electric hoists
Abutment Right Bank
Image of the right bank abutment under construction, with a crane lifting large blocks into place
[Ditto Ditto]
Image of workers concreting the top plug of the No. 14 well with two gear-driven concrete mixers
Cross River Transmission Line
Image of railroad tracks which are part of the cross-river transmission line