Ames Research Center

NASA Technical Reports Server
Not a member yet
    550909 research outputs found

    Space Science and Technology Partnership Forum: Integration with Commercial In-Space Assembly Activities

    Get PDF
    The interagency Space Science and Technology (S&T) Partnership Forum was established in 2015 with participation from the United States Air Force, the National Aeronautics and Space Administration, and the National Reconnaissance Office. Seeking to leverage synergies and influence agency portfolios with a focus on key pervasive and game-changing technologies, the S&T Partnership Forum successfully identified and prioritized several collaboration topic areas with high potential for future cross-agency work. The S&T Partnership Forum determines the forum strategy, goals, and objectives, as well as the strategies and objectives specific to each collaboration topic area. In November 2018, the Partnership held a public open forum that focused on the topic area of in-space assembly (iSA). This open forum was coordinated to facilitate government and commercial dialogue, collect data, and perform data analysis to identify potential cross-agency collaboration between government and commercial participants for in-space assembly and promising technologies. This paper discusses the analysis performed on the commercially provided data in relation to previously identified government needs, observations on the correlation between technologies and capabilities between government and commercial industry, and recommendations for future government collaborations with commercial industry for iSA

    Passive Thermal Control of the Primordial Inflation Polarization Explorer (PIPER) Flight Electronics

    Get PDF
    The scientific balloon program at NASA offers an exciting and open area of opportunity for testing new technologies and for conducting meaningful experimentation at a fraction of the cost of a space mission. This paper outlines a simple thermal model developed and employed for the Primordial Inflation Polarization ExplorER (PIPER). The sub-orbital environment that PIPER operates in hosts an interesting mix of atmospheric and space thermal challenges. The work done was to mitigate thermal loads and passively cool the payload's exterior mounted electronics at an altitude of 36.6 km. This was done by characterizing the thermal environment and then designing solutions for the heat loads through a combined radiation and conduction passive cooling radiator system thermal model. Despite the simplicity and subsequent limitations of the model, as well as some unexpected payload operational events, the model produced results between 0.31% and 11.8% difference between the predicted values and measured average temperatures. From these results, the model was able to successfully provide estimates for the electronics temperatures. Additional flights will be needed to eliminate unknowns encountered in this flight in order to further refine the model for higher accuracy

    CA Risk Assessment Condensation

    Get PDF
    No abstract availabl

    Additive Manufacturing Machine/Process Qualification

    Get PDF
    No abstract availabl

    IV&V Assurance Case Design for Artemis II

    Get PDF
    As human-rated missions like those in NASA's Artemis program continue to grow in both size and complexity, and the role of software in achieving mission objectives expands dramatically, NASA's Independent Verification and Validation (IV&V) Teams face evolving challenges in assuring the safety and performance of the safety- and mission-critical embedded software that is essential to landing astronauts on the surface of the Moon by 2024. Key among these challenges is IV&V's desire to present a cohesive, integrated assurance statement to its stakeholders that encapsulates and summarizes our assurance positions across the integrated Artemis systems and their combined role in support of a safe and successful flight. In order to meet this challenge, the IV&V Teams have begun a transition to using formal assurance case concepts and documentation in the Goal Structuring Notation (GSN) to build an argument in support of software assurance. IV&V recognizes significant benefits to the logical argumentation structure provided by assurance cases and GSN over our current practices for documenting and managing assurance claims. In order to reap these benefits, IV&V is integrating the use of assurance case concepts with our paradigm of follow-the-risk capability based assurance. Because of this, assurance cases created and used by IV&V are distinct from the sort of assurance case created by a development project or embedded software assurance organization. IV&V's assurance cases depend much less upon standards and regulations, and more on evidence captured by IV&V regarding the environment, requirements, design, and implementation. IV&V constructs an independent network of claims based on an independent decomposition of arguments. Based upon the risk posture of these claims and their associated software and software artifacts, IV&V then develops and executes engineering analyses and testing, which provide evidence to either support or refute the claim. This emerging risk-informed assurance case methodology is being put into practice as IV&V plans for support of the Artemis II mission, the first flight of the Orion capsule and Space Launch System with astronauts on board

    NASA Electrified Aircraft Testbed (NEAT)

    Get PDF
    No abstract availabl

    Operational Techniques for Dealing with Long Eclipses During the MMS Extended Mission

    Get PDF
    Launch window design for the Magnetospheric Multiscale (MMS) mission ensured that no excessive eclipses would be encountered during the prime mission. However, no orbit solutions exist that satisfy the eclipse constraints indefinitely: most extended mission years contain 1-3 eclipses long enough to potentially damage either the spacecraft or its scientific instruments. Two steps were taken to improve the situation. Firstly, raising apogee radius from 25 to 29.34 Earth radii altered the Sun-Earth-MMS phasing, so efficiently achieving reductions in the long eclipse durations. These maneuvers were performed early this year, in preparation for the first pair of long eclipses in August 2019. Secondly, a set of operational steps were taken around the time of the eclipses to help maintain spacecraft and instrument temperatures while preventing power load shedding. These operational steps included raising key onboard temperatures through adjusting the spacecraft attitude to tilt the instrument deck towards the Sun, and engaging select heaters prior to going into eclipses. In addition, all scientific instruments were turned off, as well as high-power, non-critical spacecraft systems, to conserve energy.These steps each came with trade-offs which will be discussed in the paper. Finally, the results that were obtained when the spacecraft experienced the first extremely long eclipses will be discussed, as will lessons learned for future long eclipses

    Urban Air Mobility System Testbed Using CAVE Virtual Reality Environment

    Get PDF
    Urban Air Mobility (UAM) refers to a system of air passenger and small cargo transportation within an urban area. The UAM framework also includes other urban Unmanned Aerial Systems (UAS) services that will be supported by a mix of onboard, ground, piloted, and autonomous operations. Over the past few years UAM research has gained wide interest from companies and federal agencies as an on-demand innovative transportation option that can help reduce traffic congestion and pollution as well as increase mobility in metropolitan areas. The concepts of UAM/UAS operation in the National Airspace System (NAS) remains an active area of research to ensure safe and efficient operations. With new developments in smart vehicle design and infrastructure for air traffic management, there is a need for methods to integrate and test various components of the UAM framework. In this work, we report on the development of a virtual reality (VR) testbed using the Cave Automatic Virtual Environment (CAVE) technology for human-automation teaming and airspace operation research of UAM. Using a four-wall projection system with motion capture, the CAVE provides an immersive virtual environment with real-time full body tracking capability. We created a virtual environment consisting of San Francisco city and a vertical take-off-and-landing passenger aircraft that can fly between a downtown location and the San Francisco International Airport. The aircraft can be operated autonomously or manually by a single pilot who maneuvers the aircraft using a flight control joystick. The interior of the aircraft includes a virtual cockpit display with vehicle heading, location, and speed information. The system can record simulation events and flight data for post-processing. The system parameters are customizable for different flight scenarios; hence, the CAVE VR testbed provides a flexible method for development and evaluation of UAM framework

    Space Chicken: A Historical Look at How the Critical Path Changes over a Missions Development

    Get PDF
    The critical path in schedule analysis defines the series of tasks that have no schedule slack leading to the delivery of a system. The critical path for NASA science missions, which typically runs through a spacecraft subsystem or a scientific instrument, is dynamic and changes over the development lifetime of a project. Often the critical path at the start of preliminary design will be through a specific spacecraft subsystem while the final, delivered critical path item is often a scientific instrument that is delivered late. The research for this paper looks at the postulated critical path at different milestones, and the actual critical path item at final delivery, for a variety of NASA science missions to understand what elements are impacting the delivery schedule the most. Recommendations are made based on these quantitative results relative to what elements should potentially be considered more often in early development schedules to more robustly plan for development issues

    LunaNet: a Flexible and Extensible Lunar Exploration Communications and Navigation Infrastructure

    Get PDF
    NASA has set the ambitious goal of establishing a sustainable human presence on the Moon. Diverse commercial and international partners are engaged in this effort to catalyze scientific discovery, lunar resource utilization and economic development on both the Earth and at the Moon. Lunar development will serve as a critical proving ground for deeper exploration into the solar system. Space communications and navigation infrastructure will play an integral part in realizing this goal. This paper provides a high-level description of an extensible and scalable lunar communications and navigation architecture, known as LunaNet. LunaNet is a services network to enable lunar operations. Three LunaNet service types are defined: networking services, position, navigation and timing services, and science utilization services. The LunaNet architecture encompasses a wide variety of topology implementations, including surface and orbiting provider nodes. In this paper several systems engineering considerations within the service architecture are highlighted. Additionally, several alternative LunaNet instantiations are presented. Extensibility of the LunaNet architecture to the solar system internet is discussed

    253,828

    full texts

    550,909

    metadata records
    Updated in last 30 days.
    NASA Technical Reports Server
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇