Arizona State Museum

The University of Arizona Library Digital Collections
Not a member yet
    226894 research outputs found

    S. 294 In the Senate of the United States

    No full text
    Document: 89th Congress, 1st Session, S.294, January 6, 1965, page 2525 1 judgment, to recover, without interest, costs allocated under 2 section 803 (b) to irrigation to the extent that such costs 3 exceed the irrigators' ability to pay, and further increments, 4 consistent with the fair value of such power and energy, to 5 be accumulated in the development fund to the credit of the 6 transmountain division, for repayment of the cost of con- 7 struction of works to augment the water supply of the Colo- 8 rado River Basin. 9 SEC. 806. CONTRACTS.-(a) The Secretary is author- 10 ized to enter into contracts for the storage and delivery of 11 water, for irrigation and municipal and industrial use, and 12 repayment of the cost of works allocated to such functions, 13 meeting the revenue requirements of section 805, in accord- 14 ance with the Reclamation Project Act of 1939: Provided, 15 That contracts for the storage and delivery of water shall 16 provide for permanent service, subject to compliance with 17 this Act and other applicable Federal laws. 18 Provided further, That contracts for the delivery of water by 19 means of the cenral Arizona aqueduct for irrigation use may 20 contains provisions for transition to municipal and industrial 21 use, with appropriate provisions subjecting such uses, in that 22 event, to the terms of the Act which relate to water fur- 23 nished for municipal and industrial uses. 24 (b) The Secretary is authorized to enter into contracts 25 for the sale of elecrtic power and energy, meeting theEpson Perfection 4870 Photo, 400 dpi, 8 bit, 1,924,915 byte

    S. 294 In the Senate of the United States

    No full text
    Document: 89th Congress, 1st Session, S.294, January 6, 1965, page 2929 1 VADA, AND MOAPA PROJECTS IN ASSISTANCE FROM THE 2 DEVELOPMENT FUND.-The Secretary of the Interior is au- 3 thorized and directed to report to the Congress the amounts 4 of the construction costs of the Dixie project, Utah (hereto- 5 fore authorized for construction), and of the proposed south- 6 ern Nevada water supply project and Moapa Valley pumping 7 project, as those two proposed projects are described in the 8 Bureu of Reclamation's supplemental information reports 9 dated January 1964, which are in excess of the repayment 10 capacity of the respective water users, and which, in his 11 judgment, may appropriately be repaid to the Treasury out of 12 revenues to accrue in the development fund. Upon approval 13 of his recommendations by resolutions of the Committee on 14 Interior and Insular Affairs of both the Senate and House of 15 Representatives, the accounts of those projects, and of the 16 development fund, shall be adjusted accordingly to effectuate 17 the recommended assistance. This direction, with respect to 18 the proposed southern Nevada project and Moapa project, 19 respectively, shall terminate at the end of five years after the 20 enactment of this Act if the Congress shall not have author- 21 ized such project prior thereto. 22 TITLE IX-PACIFIC SOUTHWEST REGIONAL WATER 23 COMISSION 24 SEC. 901. COMMISSION CREATED.-(a) There is hereby 25 created the Pacific Southwest Regional Water CommissionEpson Perfection 4870 Photo, 400 dpi, 8 bit, 2,236,526 byte

    Memorandum to the Six Agency Committee and Counsel

    No full text
    Memorandu: From Northcutt Ely, to the Six Agency Committee and counsel, December 16, 1964 (thermofax), page 2ELY, DUNCAN AND BENNETT 12-16-64 2.5 million acre feet into the main stream below Lee Ferry, from sources outside the natural drainage area of the Colorado River System which are adequate, in the President's judgment, to permanently supply such quantities, the Secretary shall administer Article II (B) (3) of the Supreme Court's decree (which relates to the insufficiency of water to supply 7.5 million acre feet in consumptive use), as follows: diversions for the Central Arizona Project shall be limited to the extent necessary to assure the availability of water to satisfy 4.4 million acre feet of consumptive use in California, plus the satisfaction of present perfected rights in Arizona and Nevada and the satisfaction of the government's contracts with water users in those two states made before passage of the Act. This is the substance of the Mosk amendment. Comment 1. These suggestions would cure the three primary defects (from the viewpoint of California water users) in the Udall Plan as submitted to Congress: (i) The original plan would authorize the Central Arizona Project, which would increase the overdraft on present main stream supplies, but the plan would not authorize importation works to cure the overdraft or even meet the additional overdraft that the Central Arizona Project would cause. (ii) It failed to protect California's existing uses (now 5.1 million acre feet) even to the extent of the 4.4 million acre feet referred to in the California Limitation Act. (iii) It contemplated the abandonment or reduction of existing California diversions from the Colorado to the extent that California projects receive from Northern California sources 1.2 million acre feet of water which they in fact need in addition to, not in replacement of, 4.4 million acre feet of their present Colorado River supplies, and which they expect to get anyhow through the State Water Plan. 2. Delivery of the specified quantity into the main stream, not at some place of use in the interior of California, is essential for at least four reasons: (i) At least 1.5 million acre feet, plus an appropriate share by carriage losses, can then be identified with shortages occasined by the Mexican Treaty burden, with possible financial advantages to the regional plan, and with positive advantages to 2.Epson Perfection 4870 Photo, 400 dpi, 24 bit, 2,014,419 byte

    A Plan to Transport Surplus Columbia River Basin Water to the Arid Pacific Northwest

    No full text
    Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, title pageSNAKE - COLORADO PROJECT A Plan to Transport Surplus Columbia River Basin Water to the Arid Pacific Southwest Department of Water and Power City of Los Angeles Samuel B. Nelson General Manager and Chief Engineer October-1963Epson Perfection 4870 Photo, 400 dpi, 8 bit, 563,280 byte

    A Plan to Transport Surplus Columbia River Basin Water to the Arid Pacific Northwest

    No full text
    Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, page 18D. Project Costs As shown on the attached Table 4, the cost of initial construction for the Snake-Colorado Project would be 945.7millionandthecostofthedeferredexpansionprogram945.7 million and the cost of the deferred expansion program 346.8 million, for a total construction cost of 1.293billion.Theoveralcost,including1.293 billion. The overal cost, including 104.9 million for interest during construction, would be 1.397billion.AsummaryofallannualcostsfortheSnakeColoradoProjectisshownontheattachedTable5.Theannualcapitalcostof1.397 billion. A summary of all annual costs for the Snake-Colorado Project is shown on the attached Table 5. The annual capital cost of 44.2 million per year is based on capital recovery over 100 years at a 3% annual interest rate (identical to the rates used in the Pacific Southwest Water Plan).1Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,442,949 byte

    A Plan to Transport Surplus Columbia River Basin Water to the Arid Pacific Northwest

    No full text
    Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, page 20IV. COLUMBIA RIVER BASIN BENEFITS The main obstacle, which heretofore has prevented the implementation of several proposed irrigation projects1Epson Perfection 4870 Photo, 400 dpi, 8 bit, 919,384 byte

    A Plan to Transport Surplus Columbia River Basin Water to the Arid Pacific Northwest

    No full text
    Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, table 4TABLE 4 CONSTRUCTION COST SUMMARY SNAKE-COLORADO PROJECT Initial Construction (1.2 million acre-feet per year) MillionThousandSpringsReservoir25.0PumpingPlantsandPenstocks95.1RegulatingReservoirs10.0Aqueduct574.7PowerDevelopmentFacilities240.9Subtotal Million Thousand Springs Reservoir 25.0 Pumping Plants and Penstocks 95.1 Regulating Reservoirs 10.0 Aqueduct 574.7 Power Development Facilities 240.9 Subtotal 945.7 million Expansion (To full capacity, 2.4 million acre-feet per year) MillionPumpingPlantandPenstockAdditions82.0AqueductSiphonAdditions58.8PowerDevelopmentFacilityAdditions206.0Subtotal Million Pumping Plant and Penstock Additions 82.0 Aqueduct Siphon Additions 58.8 Power Development Facility Additions 206.0 Subtotal 346.8 million Total Construction Cost 1,292.5millionInterestDuringConstruction104.9GRANDTOTAL1,292.5 million Interest During Construction 104.9 GRAND TOTAL 1,397.4 million TABLE 4Epson Perfection 4870 Photo, 400 dpi, 8 bit, 946,909 byte

    Marble Canyon Dam Project

    No full text
    Document: Graduate Paper, Arizona State University College of Business Administration, "Marble Canyon Dam Project", May 1963, page iiii TABLE OF CONTENTS CHAPTER PAGE I. INTRODUCTION 1 II. HISTORY AND PRESENT SETTING 4 III. PLAN OF THE ARIZONA POWER AUTHORITY 7 Engineering Feasibility 7 Economic Feasibility 8 Plan of Financing 10 IV. THE OBJECTORS AND THEIR CASES 15 The City of Los Angeles 15 The Secretary of the Interior 18 The Navajo Indians 20 V. CONCLUSION 22 BIBLIOGRAPHY 26Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,721,865 byte

    Marble Canyon Dam Project

    No full text
    Document: Graduate Paper, Arizona State University College of Business Administration, "Marble Canyon Dam Project", May 1963, page 1CHAPTER I INTRODUCTION The Marble Canyon Dam Project Proposal is examined in detail in this paper as it provides a good lead into the Colorado River story. The whole Colorado River problem is not studied however, but some conclusions are reached on the basis of the material covered. For the purpose of orientation, two illustrations are provided; the Colorado River Profile on Page 2 and a map showing the Statewide Transmission System on Page 3.Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,780,838 byte

    A Summary of the Fish and Wildlife Features of the Central Arizona Project and the Pacific Southwest Water Plan

    No full text
    Report: "Summary of the Fish and Wildlife Features of the Central Arizona Project and the Pacific Southwest Water Plan", February 1965, page xxiiiEpson Perfection 4870 Photo, 400 dpi, 8 bit, 4,038,609 byte

    0

    full texts

    226,894

    metadata records
    Updated in last 30 days.
    The University of Arizona Library Digital Collections
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇