    Highlights of California Comments on Pacific Southwest Water Plan Report

    No full text
    Highlights of California Comments on Pacific Southwest Water Plan Report, December 5, 1963 (photocopy), page 2Plan should deal with Sacramento-San Joaquin Delta problems, and provide for handling them Federal participation in enlargement of California aqueduct be restricted to financing--and State markets all water without competition from Federal Government Extent of U. S. participation in aqueduct cost be based on California contract formula Extend water and financing pool concept to creation of power pool Amend MWD power contracts to use cut-back in pumping MWD's State water Make continuing cooperative study of water requirements and supply, starting immediately Water quality must be integral part of plan; specific planning following authorization for maintaining salt balances Water salvaged through canal lining, etc., can and should be used in areas where salvage occurs Consideration that conservation proposed may affect Salton Sea as a fishing and recreational area California is opposed to future piece by piece project authorizations-will support projects as part of this regional plan 3Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,751,209 byte

    State Comments

    No full text
    Document: State Comments, December 5, 1963 (photocopy)STATE COMMENTS The State comments are well receptive to the basic precepts of the Pacific Southwest Water Plan, are constructive to their suggestions for modification of the plan, and raise no problems that can't be accommodated. In general the States agree: 1. The regional approach to solution of Pacific Southwest water problems is essential. 2. Phase II projects need a great deal more study. 3. Direct subsidy to municipal and industrial water supply should be eliminated. 4. The Basin Development Fund concept is desirable. Major points of disagreement are as follows: 1. California states that until a truly regional approach is adopted the Congress should shelve all project-by project-authorization in the Lower Basin. Arizona, Nevada, and Utah insist that action on a Pacific Southwest Water Plan must not interfere or delay authorization of the Central Arizona, Southern Nevada Water Supply, and Dixie Projects. 2. The Upper Basin States indicate that they will insist on certain interpretations of the Colorado River Compact which, over past years, have been issues of contention with the Lower Basin States. Digests of the State's comments are attached.Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,561,915 byte

    Cover Sheet Note

    No full text
    Cover sheet: From Dick Pelz, to Orren Beaty, 12/15/1963UNITED STATES DEPARTMENT OF THE INTERIOR WASHINGTON 12/18 [1963] Orreu Beaty These are the two memos & refused to in our phone conversation. Dich PelyEpson Perfection 4870 Photo, 400 dpi, 24 bit, 500,478 byte

    Memorandum on Guidelines for Preparing Final Report on Pacific Southwest Water Plan

    No full text
    Memorandum: From Assistant Secretary- Water & Power Development, to Chairman, Task Force on the Pacific Southwest Water Plan, Nov 26, 1963, page 1UNITED STATES DEPARTMENT OF THE INTERIOR OFFICE OF THE SECRETARY WASHINGTON 25, D. C. NOV. 2 6 1963 Memorandum To: Chairman, Task Force on the Pacific Southwest Water Plan From: Assistant Secretary - Water and Power Development Subject: Guidelines for preparing final report on Pacific Southwest Water Plan On the basis of meetings with the Secretary and in my office during the week of November 17, the following guidelines should be observed in preparing the final report: Report preparation schedule: An objective that must be met is transmittal of the final report to the Congress no later than January 31, 1964. During the week of December 1, the views and comments of the affected States and agencies should be analyzed and the issues raised identified looking to a meeting with the Secretary on December 6 to establish Departmental positions and courses of action. Following the December 6 meeting, preparation of the report in final form for transmittal to the President should proceed as expeditiously as possible. In the interim, between December 6 and transmittal of the report to the President, you should discuss with the staff of the Bureau of the Budget appropriate policy items involved in the Pacific Southwest Water Plan and work closely with Bureau of the Budget personnel towards the objective of prior clearance to the maximum extent possible of Departmental positions covering those policy items. Major policy issues for identification to the Bureau of the Budget should be promptly submitted to the Secretary through my office for presentation to officials of that Bureau. Basic modification of proposed plan: a. Limit the detailed presentation in the report to those features to be recommended for immediate authorization. Formulation and proposal of specific longer range features will be left for future comprehensive study. b. Eliminate direct subsidy to municipal and industrial water supply from the plan.Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,384,816 byte

    Comments - Arizona and Nevada

    No full text
    Document: Nevada Comments, December 5, 1963Nevada Comments 1. State is disappointed that PSWWP does not indicate greater benefit to Nevada. Assumes additional water needs will be provided for when final report is prepared. 2. State recommends all phases of Southern Nevada Water Supply Project be authorized in first phase of PSWWP. 3. Recommends Moapa Valley Pumping Project be included in first phase of PSWWP. 4. Revised report should clearly show that Nevada is to participate in additional waters created by ground-water recovery and salvage programs. 5. Eliminate subsidy for M&I water supply facilities. 6. Desalting plant should be eliminated from PSWWP and authorized separatly as a research facility. 7. Include California storage facilities (Trinity Dams) in first phase of PSWWP. 8. Recommends proceeding immediately with authorization of the Southern Nevada Water Supply Project. 9. State fully endorses principles of regional development set forth in PSWWP report.Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,090,624 byte

    Handwritten Notes

    No full text
    Documents: Pacific Southwest Water Plan notes, December 3, 1963, page 25. Alvinery Commissioner? What's Status? 6. -P. 10 of Commissioner's Report what would be rated capacity of Low Bridge in Kws?Epson Perfection 4870 Photo, 400 dpi, 24 bit, 1,935,656 byte

    Handwritten Notes

    No full text
    Documents: Pacific Southwest Water Plan notes, December 3, 1963, page 4Change Prefon II. 15 of Report they Reference to 1947 report. Doming. additional help step Engineeringly frandile alone Weinberg it's that SLV. Monday 2 sets of chock troops. 1. Foundation in which everything else is built on Basin approach & Basin Account 2. We can't go for both regional approach and separate Central Arizona project.Epson Perfection 4870 Photo, 400 dpi, 24 bit, 2,265,139 byte

    Memorandum on Guidelines for Preparing Final Report on Pacific Southwest Water Plan

    No full text
    Memorandum: From Assistant Secretary--Water & Power, to Chairman, Task Force on the Pacific Southwest Water Plan, "Guidelines for preparing final report on Pacific Southwest Water Plan," Nov 26, 1963 (photocopy), page 1Misty Mount, Catortin, Mr. have to get through to someone. Pat Udall UNITED STATES DEPARTMENT OF THE INTERIOR OFFICE OF THE SECRETARY WASHINGTON 25, D.C. NOV 2 6 1963 Memorandum To: Chairman, Task Force on the Pacific Southwest Water Plan From: Assistant Secretary - Water and Power Development Subject: Guidelines for preparing final report on Pacific Southwest Water Plan On the basis of meetings with the Secretary and in my office during the week of November 17, the following guidelines should be observed in preparing the final report: Report preparation schedule: An objective that must be met is transmittal of the final report to the Congress no later than January 31, 1964. During the week of December 1, the views and comments of the affected States and agencies should be analyzed and the issues raised identified looking to a meeting with the Secretary on December 6 to establish Departmental positions and courses of action. Following the December 6 meeting, preparation of the report in final form for transmittal to the President should proceed as expeditiously as possible. In the interim, between December 6 and transmittal of the report to the President, you should discuss with the staff of the Bureau of the Budget appropriate policy items involved in the Pacific Southwest Water Plan and work closely with Bureau of the Budget personnel towards the objective of prior clearance to the maximum extent possible of Departmental positions covering those policy items. Major policy issues for identification to the Bureau of the Budget should be promptly submitted to the Secretary through my office for presentation to officials of that Bureau. Basic modification of proposed plan: a. Limit the detailed presentation in the report to those features to be recommended for immediate authorization. Formulation and proposal of specific longer range features will be left for future comprehensive study. b. Eliminate direct subsidy to municipal and industrial water supply from the plan.Epson Perfection 4870 Photo, 400 dpi, 8 bit, 2,422,278 byte

    Comments Following Review of Report on the Pacific Southwest Water Plan

    No full text
    Document: Draft No. 5, Nov 14, 1963 (carbon copy), page 17this State should be determined by the respective officials of the states in which such projects are located and the Department of the Interior. In this connection, however, it is my opinion that the desalting plant which, under the Plan would be constructed on the seacoast in Southern California would be in the nature of research rather than reclamation, and I doubt that the cost of any such plant should be construed to be a cost of reclamation. The desalinization of water is a matter important to every citizen of the United States and not alone to those residing within the Pacific Southwest. The Pacific Southwest Water Plan should be further developed and further studies made of the Projects and elements thereof insofar as such studies do not delay construction of the Central Arizona Project. As you stated on pages VIII-1 and VIII-2 of your Report on the Pacific Southwest Plan, as follows: 15Epson Perfection 4870 Photo, 400 dpi, 24 bit, 3,775,759 byte

    Southern Nevada Water Supply Project Problem and Discussion

    No full text
    Document: Souther Nevada Water Supply Project, 1963, page 2stage is about 43,000,000,withtotalestimatedcostforallstagesofabout43,000,000, with total estimated cost for all stages of about 72,000,000. It is contemplated that legislation will be introduced in the very near future to authorize separately the Southern Nevada Water Supply Project. No financial assistance is required for this project. The project was split between Phase I and Phase II in the Pacific Southwest water Plan primarily in an effort to keep Phase I costs down. However, the fact that the development involves three separate stages enables the project to be split between the two phases if desirable. Inasmuch as the Southern Nevada Water Supply Project requires no financial assistance, the State of Nevada realizes little benefit from the Pacific Southwest Water Plan. Thus, a problem presents itself as to how far we should go in accommodating Nevada's comments to provide a greater incentive to Nevada to support the Pacific Southwest Water Plan. Proposed Position: In view of Nevada's comments and imminent introduction of authorizing legislation, it is proposed that all three stages of the project be recommended for authorization in the Pacific Southwest Water Plan. 2Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,014,733 byte

    0

    full texts

    226,894

    metadata records
    Updated in last 30 days.
    The University of Arizona Library Digital Collections
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇