Direktori jurnal elektronik Politeknik Negeri Padang (PNP)
Not a member yet
    631 research outputs found

    IKLIM ORGANISASI, KETERAMPILAN MANAJERIAL DAN KINERJA KEPALA SMK DI KOTA PADANG

    Get PDF
    The objective of research is to describe organizational climate and managerial skills, and principal performance of SMK in Padang City in order to improve educational quality of vocational unit.Research designed by descriptive-explanatory with population in this study are teachers of the public and private SMK in academic year 2016/2017. the population are 1,628 teachers with stratified random sampling technique (with 94 samples). Empirical finding shows that a few SMK principal carry out supervision with actions to all education units; ineffective school organizational structure;, school team coordination has not been created well, and the absence of school personnel performance and evaluation within a certain period. That also influenced by the climate of vocational organizations, both physical buildings and learning technology facilities. In addition, the education level of the vocational school principals about 51.2% graduated from the bachelor's degree, which determines managerial ability to manage school in a professional manner

    Kajian Penggunaan Material Pasir Sumpur Kudus untuk Meningkatkan Kinerja Lapisan Pondasi Atas Agregat Kelas A

    Get PDF
    Permasalahan yang biasa terjadi pada proses pembuatan lapis pondasi perkerasan jalan agregat kelas A adalah sulitnya memenuhi kebutuhan agregat halus yang memenuhi persyaratan gradasi. Penelitian ini dilakukan mengkaji bagaimana membuat suatu campuran agregat kelas A yang sesuai dengan gradasi dan juga sesuai dengan ketersedian material yang ada di daerah tersebut. Pemanfaatan pasir gunung daerah Sumpur Kudus ini sebagai subtitusi agregat halus, diharapkan dapat menyelesaikan dua permasalahan sekaligus yaitu memperoleh  lapisan pondasi agregat kelas A yang mempunyai nilai CBR yang memenuhi persyaratan sekaligus pemanfataan material lokal yang selama ini hanya bertumpuk dan terbuang hasil dari longsoran yang sering terjadi. Metode yang digunakan adalah metode eksperimen skala laboratorium . Campuran agregat kelas A yang digunakan adalah 64,5% agregat kasar dan 35,5% agregat halus yang terdiri dari campuran pasir sungai dan pasir Sumpur Kudus. Pengujian yang dilakukan adalah pengujian sifat fisisdan pemadatan terhadap pasir Sumpur Kudus serta pengujian California Bearing Capacity ( CBR ) terhadap agregat kelas A. Hasil penelitian memperlihatkan dengan digunakannya pasir Sumpur Kudus sebagai pengganti agregat halus pada campuran lapis pondasi agregat kelas A, nilai CBR laboratorium meningkat 5,62% yaitu dari 40,58% menjadi 46,2 %. Tapi nilai CBR laboratorium yang diperoleh ini belum memenuhi nilai CBR yang disyaratkan untuk agregar kelas A yaitu nilai minimal 90%

    Experimental Study of Bamboo As A House Retrofitting Material For Developing Countries

    Get PDF
    Earthquake is one of the main natural disasters which frequently occur in West Sumatra. Large earthquake September 30, 2009, has caused damage to the structure and caused many casualties. Due to this condition, this research was made to study bamboo as a house retrofitting material for developing countries.  Mechanical and physical properties such as moisture content testing, testing density, testing of compressive strength and tensile strength were conducted. It is obtained from the test results, the highest compressive strength and tensile strength are 94.958 MPa and 183 MPa, showed by Betung bamboo. Shaking table test are also undertaken to investigate the seismic behavior of bamboo masonry wall. Two degree of masonry walls, 60° and 90° are tested in order to check the strength of masonry wall by direction of the coming of an earthquake. From the shaking table test, it was observed that a 60° masonry wall showed a better seismic performance than those of a 90° masonry walls. Small cracks were observed at 90° masonry walls after 20 seconds, while there was no crack at a 60° masonry wall. As a result of these test, using bamboo as a house retrofitting material could be chosen, both of technically and economically

    Site Specific Response Analysis (SSRA) Kampus UNP Air Tawar, Kota Padang

    Get PDF
    In general, the seismic design provisions around the world present different criteria for local soil conditions depending on soil and rock properties to determine the design spectra representing seismic design. On the other hand, site-specific analysis results not only show the main characteristics of soil-rock profiles but also local soil characteristics where detailed studies are needed to review the earth response to earthquakes. In this study conducted Site Specific Response Analysis (SSRA) is to analyze the earthquake wave propagation from the bedrock to the surface layer. The data needed are ground stratification data and shear wave velocity parameters obtained from empirical correlation to N-SPT test drilling data. In addition, the required data is ground motion synthetic at baserocks used for the earthquake wave propagation obtained by Probabilistic Seismic Hazard Analysis (PSHA) 3-dimensional earthquake source referring from the results of previous research. SSRA is based on the theory of single-dimensional wave propagation in time domain using NERA (Non-linear Earthquake Response Analysis) program. Various inputs of earthquake movement are taken by considering suitable for Padang area. The results of this analysis are shown in the form of historical time acceleration graph and peak acceleration from each bore point location which is then processed to obtain amplification and response spectra design factors for the re-quake period of 475 years and 2475 years

    Pengendalian Banjir Batang Kuranji Menggunakan Program HEC-RAS

    Get PDF
    Batang Kuranji merupakan sungai yang memunyai luas DAS sebesar 187,50 km2. Banjir yang terjadi akibat luapan Batang Kuranji apabila itensitas hujan tinggi membuat kerugian bagi masyarakat disekitar aliran sungai. Pengendalian banjir direncanakan bertujuan untuk menaggulangi banjir sepanjang aliran batang kuranji. Dalam perhitungan Debit Banjir  tahunan menggunakan metoda Melchior didapat Q10 adalah 730, 48 m3/dtk. Analisa banjir dilanjutkan menggunakan Program HEC-RAS 4.0 untuk mengetahui tinggi banjir dari luapan batang kuranji. Hasil analisa menggunakan HEC-RAS terhadap 9 buah cross memberikan gambaran hampir semua titik mengalami kondisi banjir (luapan), dan hanya beberapa titik saja yang tidak mengalami luapan. Hal ini disebabkan karena kontur daerah bagian hulu rendah. Hasil menggunakan HEC-RAS 4.0 didapat tinggi banjir setinggi 0,20 meter pada bagian hilir dan setinggi 1,40 meter pada bagian hulu. Perencanaan tanggul menjadi solusi sebagai penahan luapan air Batang Kuranji dengan dimensi tinggi 2,40 meter, lebar atas 1,00 meter dan lebar bawah 1,5 meter dengan kontrol stabilitas aman terhadap guling dan memenuhi safety factor. Solusi lain untuk perencanaan Normalisasi Sungai yaitu dengan analisa dimensi penampang sungai batang kuranji, didapat tinggi penampang sungai 3,25 meter, lebar atas 56,50 meter dan lebar bawah 50,00 meter

    Analisis Variabel-Variabel Risiko pada Pelaksanaan Proyek Konstruksi Jalan

    Get PDF
    This research aims to identify the risk variables that ever occurred while executing of road construction project. In addition, it is to identify how significant and how big the influence of risk variables to the articulation of project execution processes of a road construction project, based on questionnaire that distributed to 30 questionnaires who are project managers and site managers on contractors of road construction project.  From the research data, there were identified 14 risk variables with 84 risk sub-variables on execution of road construction project. Those 14 risk variables were natural, social, politic, economic, law, occupational safety and health, managerial, technical, cultural, logistic, condition around construction site, design and technology, labor, and contractual variables. From the data analysis by using SPSS version 16, obtained there were 14 risk sub-variables which became the most influential sub-variables (indicators) to the road construction project. All sub-variables on the questionnaire are valid and reliable. The results of this research is expected to be considered for all parties involved in the construction project to pay more attention to risk variables during the execution of road construction project

    Kinerja Soil Stabilizer Polymer Termoset Terhadap Sifat Fisik dan Sifat Mekanis Tanah Pasir sebagai Material Jalan

    Get PDF
    Soil stabilizer polymer hasil campuran lateks polyester tak jenuh Yukalac 157 BQTN-EX dengan lateks pekat karet alam (LPKA),  disebut soil stabilizer termoset (SSTS). Campuran ini homogen pada perbandingan 90/10 dan stabil hingga hari ke 28 penyimpanan, dapat digunakan sebagai perekat tanah pasir untuk meningkatkan sifat kekuatannya. Melalui berinteraksi gugus polar pada polester dengan partikel tanah pasir diprediksi dapat membentuk komposit yang memiliki sifat mekanis yang tangguh sebagai material jalan. Hasil uji mekanis komposit tanah yang distabilkan dengan SSTS  meningkat hingga penambahan SSTS 35%. Kuat tekan meningkat hingga penambahan  SSTS 25% dan menurun pada penambahan  lebih tinggi . Daya serap air menurun dengan peningkatan jumlah SSTS. Hasil uji termal terdapat pergeseran puncak dari  polyester, SSTS dan komposit campuran SSTS dengan tanah pasir

    Kecepatan Runtuh Balok Beton Bertulang oleh Temperature Tinggi dalam Variasi Mutu Beton

    Get PDF
    Kombinasi beban statik dan temperatur tinggi  mempercepat terjadinya keruntuhan struktur beton yang sedang terbakar, kecepatan runtuh ditentukan oleh  besarnya beban yang bekerja,  temperatur  dan durasi kebakaran serta  mutu beton             Specimen adalah balok beton bertulang  dimensi  100x150 x1000 mm. jumlahnya 8 balok. Masing-masing balok diberi satu tulangan tarik D=12mm,  tulangan tarik tersebut dibubut dibagian tengahnya sepanjang 10 cm  hingga diameter 8 mm, tujuan agar memberikan konsentrasi tegangan.  Pengujian specimen dibagi 2 yaitu: 2 balok diuji pada temperatur ruang untuk mendapatkan Pcr sebagai beban bagi  6 balok yang diuji pada temperatur tinggi. Untuk melihat kecepatan runtuh balok pada pengujian temperatur tinggi, digunakan tiga variasi pembebanan yaitu: 100% Pcr, 80% Pcr dan 60% Pcr, sedangkan selimut beton (concrete cover) (d’): d’=20 mm  Pelaksanaan pengujian balok pada temperatur tinggi, balok dibakar dalam furnace untuk mutu 20 MPa sambil dibebani: 100%Pcr, 80%Pcr, dan 60%Pcr langsung direkam datalogger data-data lama pembebanan, perubahan suhu,  defleksi Demikian juga untuk mutu beton fc=45 MPa.              Hasil pengujian balok pada temperatur tinggi menunjukan bahwa: semakin besar beban Pcr yang bekerja maka kecepatan runtuh balok beton bertulang semakin tinggi. Semakin tinggi mutu beton maka kecepatan runtuhnya juga semakin tinggi.   Sebanyak 2 balok beton bertulang diuji pada suhu ruang memberikan Pcr masing masing sebagai berikut: untuk mutu beton fc=20 MPa dan dengan cover beton 20cm maka Pcr= 824 kg kondisi crack, dan Pcr’=2870 MPa kondisi ultimate, Untuk mutu beton fc’=45 MPa dan dengan cover beton 20mm maka Pcr=1394 MPa kondisi crack, dan Pcr=3164 MPa kondisi ultimat

    Analisa Kebutuhan Pelayanan Trans Padang Koridor Pusat Kota – Pusat Pemerintah

    Get PDF
    Increasing the need of mass transportation in Padang city is needed to overcoming the chaos of transportation. For that to be done the analyst service needs for Trans Padang corridor Center of City-center government.a From result of research known that corridor Trans Padang for developmentof trajectory Trans Padang corridor Center of City-Center Government are Imam Bonjol street – Karya - Gereja – Diponegoro – Hangtuah – Samudera – S. Parman – Khatib Sulaiman – Jhon Anwar – Gadjah Mada – Siteba – Simp. Balai Baru – Sungai Sapih – Aie Pacah for direction go and go home rute  Aie Pacah – Sungai Sapih – Simp. Balai Baru – Siteba – Gadjah Mada – Jhoni Anwar – S. Parman – Juanda – Veteran – Damar – Pemuda – Diponegoro – Gereja – Pondok – M. Thamrin – Imam Bonjol – Hasanuddin – Bagindo Aziz Chan – M. Yamin – Imam Bonjol. Bassed on potential demand of Trans Padang passenger corridor Center of City-Center Government of all modes is 24.783 passenger with the price around Rp. 3500,- to Rp. 4000,-. Based on land analysis the number of shelters needed to corridor Center of City-Center Government is 39 shelters for direction go n 39 shelters for direction go home with the long of trajection about 22,94 km. And bus that can operate on this corridor is a medium size, because there is one narrow road segment that cannot be passed by big bus. Peningkatan kebutuhan pelayanan angkutan masal dikota padang untuk mengatasi kesemrawutan  transportasi sangat dibutuhkan, untuk itu dilakukan analisa kebutuhan pelayanan Trans Padang koridor Pusat Kota - Pusat Pemerintahan. Dari hasil penelitian diketahui bahwa koridor Trans Padang untuk pengembangan lintasan Trans Padang  Pusat kota – Pusat Pemerintahan adalah jalan Imam Bonjol – Karya - Gereja – Diponegoro – Hangtuah – Samudera – S. Parman – Khatib Sulaiman – Jhon Anwar – Gadjah Mada – Siteba – Simp. Balai Baru – Sungai Sapih – Aie Pacah untuk arah pergi dan arah pulang dengan rute  Aie Pacah – Sungai Sapih – Simp. Balai Baru – Siteba – Gadjah Mada – Jhoni Anwar – S. Parman – Juanda – Veteran – Damar – Pemuda – Diponegoro – Gereja – Pondok – M. Thamrin – Imam Bonjol – Hasanuddin – Bagindo Aziz Chan – M. Yamin – Imam Bonjol. Berdasarkan Potensi potensial demand penumpang Trans Padang koridor Pusat Kota-Pusat Pemerintahan dari seluruh moda adalah 24.783 penumpang dengan kisaran ongkos sekitar Rp. 3500 - Rp. 4000. Berdasarkan analisis tata guna lahan maka jumlah halte yang dibutuhkan Trans Padang untuk koridor Pusat Kota-Pusat Pemerintahan adalah 39 halte untuk arah pergi dan 39 halte untuk arah pulang dengan panjang trayek 22,94 km, sedangkan bus yang bisa beroperasi pada koridor ini adalah bus ukuran sedang karena ada salah satu ruas jalan yang sempit sehingga tidak bisa dilalui oleh bus ukuran besar

    ANALISIS KEPUASAN KONSUMEN PEDAGANG LANGKITANG KAKI LIMA DI KAWASAN OBJEK WISATA PANTAI PADANG

    Get PDF
    The purpose of this research is to know and analyze, (1) the influence of food quality to the satisfaction of the merchant of Langkitang in Padang beach resort area; (2) the influence of price to the satisfaction of the merchant of Langkitang in Padang beach resort area, 3) the influence of food quality and price simultaneously to the satisfaction of merchant consumers Langkitang pavement in the area of Padang Beach tourist attraction. Population in this research is all consumer of Langkitang merchant of pavement in Padang beach resort area. The number of samples in this study is 100 respondents which use accidental sampling technique. Based on the result of the research, it can be seen that: (1) The quality of food has a significant effect on the satisfaction of the consumers in the street vendors in Padang Beach tourist area, where t-count 2,685 from t-table 1,661 and significance 0,009 less than level of significant (α ) 0.05. (2) Price has a significant effect to customer satisfaction at Langkitang street vendors in Padang Beach tourist area, where t-count 2,564 > t-table 1,661 and significance 0.012 < level of significant (α) 0,05. (3) The quality of food and the price simultaneously have a significant effect on the satisfaction of the consumers on the street vendors in Padang Beach, where F-count is 19.496 > F-table 3.09 and the significance of 0.000 is < the level of significant (α) 0.05. (4) The coefficient of determination is 0,272, mean than food quality and price influence consumer satisfaction at trader Langkitang pavement in coastal resort area of Padang equal to 27,2%

    553

    full texts

    631

    metadata records
    Updated in last 30 days.
    Direktori jurnal elektronik Politeknik Negeri Padang (PNP)
    Access Repository Dashboard
    Do you manage Open Research Online? Become a CORE Member to access insider analytics, issue reports and manage access to outputs from your repository in the CORE Repository Dashboard! 👇