1,720,976 research outputs found
Pengukuran Kinerja Supply Chain Menggunakan Scor dan Aplikasi Analytic Network Proses ( ANP ) di PT. Pertiwi Mas Adi Kencana Sidoarjo
Analisis Tingkat Kepentingan Konsumen Terhadap Kriteria Keamanan Pangan Dalam Prespektif Rantai Pasok ( Studi Kasus : Perusahaan Udang )
Measurement Of Standard Time Work Wiht The Predetermined Motion Time System Method at The Production Depatement in PT. PIJ Sidoarjo
Consumer Prespectives On Food Safety in Supply Chain For Smalland Medium Enterprises ( SME.s ) Product
Measurement of Standard Time Work with the Predetermined Motion Time System Method at the Production Department in PT.PIJ Sidoarjo
The purpose of this study is to measure standard work time in the production section at “PT. Prestasi Ide Jaya” (PT.PIJ) where there are several workers and machine operators, if between one of the operators on each machine does not work properly it will cause the production process to stop. In this study there are two variables, namely 1) the dependent variable is the time and movement of the machine operator, 2) the independent variable of several Therblig movements: a. reach out, b. take off, c. holding, d. direct, and e. transport. Measuring the standard time of operator movements with Work Factor and Time Measurement Methods. The calculation results can be concluded that the Time Measurement (MTM) and Work factor (WF) methods can provide a standard time that is following the standard time that is smaller than real conditions. Company is proposing to reduce operator movements that are not needed in the production process
- …
