11 research outputs found
Analisi strutturata del progetto di restauro adottando modelli WBS e strumenti BIM: l'intervento di riqualificazione del Teatro Lirico
Construction management of cultural heritage. Conservation of cultural heritage during its construction site stage. Building information modelling supporting on site information collection and management for cost control
DOTTORATO-Cultural heritage preservation and management is a complex domain, to which numerous and very diverse disciplines contribute specific, crucial competencies. Hence, cultural heritage represents a highly valuable experimental field, in which innovative management models and tools to govern complexity in general can be designed. Despite that, this perspective of cultural heritage management seems more foster at the level of academic instead of workplace. Moreover, this topic is more crucial on the Italian territory due to its history and the abundance of heritage buildings.
The whole construction sector is affected by a consequent loss in information and knowledge between the different stages of the life of a building. The trend entails an increase of costs and a waste of time to recover all this information. This issue is more critical and crucial with regards to the built environment, especially when involves conservation projects of a heritage building. Indeed, the knowledge of the building has to be recovered, implemented and continuously update, to be conducted to posterity.
Due to its’ multidisciplinary and organizational nature, Information technology (IT) is now used as an instrument in the AECO industry to reduce some of the problems generated by its fragmentation. The most disruptive one is Building Information Modelling (BIM), a tool that allows a digital representation of physical and functional characteristics of a facility (digital twin). However, BIM for heritage assets (historic buildings and sites) is relatively new field and appears less popular in terms of adoption by heritage professionals.
The research proposes a BIM-based approach for cultural heritage project in order to manage the construction stage of a conservation project. In particular, the research defines a proper protocol to deal with all information turn up during the construction site for a correct planned conservation.
This research focuses on the benefits that new technologies could bring to handle the construction process directly in the field. The scope of the research is to develop a new framework to gather all information from construction site via new technologies. The aim is to improve an accurate supervision of the site activities, to pursue a proper project control of construction stage, especially regarding the cash flow. In particular, this research work would support the Public Administration to improve and implement its actual procedures employing technologies already in use, for the cost management during construction site.
The research seeks to strengthen precise protocols related to construction site activities regarding cultural heritage project in order to collect and manage all information required for the drafting of demanded documentation by Italian standard (scientific report for planned conservation) and create a unique knowledge repository of the cultural artefact, useful for the following usage and maintenance phase.DIPARTIMENTO DI ARCHITETTURA, INGEGNERIA DELLE COSTRUZIONI E AMBIENTE COSTRUITO32SCAIONI, MARCOSCAIONI, MARC
Il caso del progetto di riqualificazione del teatro lirico. Il BIM come strumento di implementazione strategica del codice di comunicazione del progetto attraverso il perfezionamento di un processo logico finalizzato all'assegnazione di valori compatibili a tutte le variabili di forma qualità e costo
LAUREA MAGISTRALELa seguente trattazione intende dimostrare come i software di tipo B.I.M. possano porsi quali strumenti di implementazione strategica di un codice di comunicazione univoco per tutti gli attori del progetto. Il tutto attraverso il perfezionamento di un processo logico finalizzato all’assegnazione di valori compatibili a tutte le variabili di forma, qualità e di costo.The following discussion will demonstrate how the BIM software may arise as a means of strategic implementation of a code of communication unique to all the actors of the project. All through the completion of a logical process intended to allocate values compatible to all the variables of the form,
quality and cost
Gestione dell'informazione nel processo edilizio. Dal BIM project execution plan al piano esecutivo del progetto
LAUREA MAGISTRALEL’obiettivo di questa tesi è definire una linea guida per la formulazione di un Piano Esecutivo BIM applicabile al contesto italiano.
L’introduzione all’obbligatorietà dell’uso di metodi e strumenti elettronici specifici per la modellazione per l’edilizia e le infrastrutture, a partire del 2019, pone una serie di interrogativi su come fare BIM.
Il piano esecutivo è uno strumento operativo che permette di gestire il processo informativo della progettazione e costruzione fatta in BIM. Costituisce una visione d’insieme, coordinando tutti gli stakeholders, pubbliche amministrazioni, progettisti, consulenti, appaltatori e subappaltatori, grazie all’interoperabilità della metodologia.
L’introduzione di nuovi ruoli, quali il BIM Manager, BIM Coordinator e BIM Modeler, integrati con le figure già previste dal codice (RUP, progettisti, direttore lavori ecc), permette l’implementazione del BIM nel processo e ne garantisce la continuità per tutto il suo svolgimento, dalla formazione della domanda pubblica alla consegna dell’opera, e gestione in fase d’uso.
Per arrivare alla definizione di un piano esecutivo italiano abbiamo analizzato lo scenario BIM in Italia e messo questo a confronto con le esperienze pregresse di altri paesi, in particolare il caso americano (PEP) ed il caso inglese (BEP).
L’analisi dei diversi documenti volti alla gestione di un progetto, quale il Documento Preliminare alla Progettazione, e in particolare il DPP del progetto per la “residenza universitaria Gianluca Spina” dell’Area Tecnico Edilizia del Politecnico di Milano (una delle prime Università italiane ad adottare il BIM), ha portato alla definizione di linee guida per un Piano Esecutivo del progetto.
La linea guida descrive per ogni fase del processo edilizio (programmazione, progettazione, costruzione, uso e manutenzione), come governare il procedimento in relazione agli attori coinvolti e agli elaborati da produrre, per un efficiente implementazione del BIM.
La linea guida mira ad agevolare la transizione, per i soggetti coinvolti, all’utilizzo di strumenti innovativi digitali.The objective of this thesis is to define a guideline for the formulation of a BIM execution plan applicable to the italian context.
The introduction of mandatory use of specific electronic methods and tools for building and infrastructures modeling, starting from 2019, raises a series of questions on how to make BIM.
The execution plan is an operative tool that allows to manage the information process of the design and construction done in BIM. It constitutes an overview, coordinating all the stakeholders, public administrations, designers, consultants, contractors and subcontractors, thanks to the interoperability of the methodology.
The introduction of new roles, such as the BIM Manager, BIM Coordinator and BIM Modeler, integrated with the figures already provided for by the code (RUP, designers, project manager, etc.), allows the implementation of BIM in the process and guarantees continuity for all its development, from the formation of public demand to the delivery of the work, and management during use.
To get the definition of an italian execution plan, we analyzed the BIM scenario in Italy and compared this with the previous experiences of other countries, in particular the American case (PEP) and the English case (BEP).
The analysis of the various documents aimed at the management of a project, such as the Documento Preliminare alla Progettazione, and in particular the DPP of the project residenza universitaria Gianluca Spina of the Area Tecnico Edilizia of the Politecnico di Milano (one of the first Italian universities to adopt BIM), led to the definition of guidelines for an execution plan of the project.
The guideline describes for each phase of the building process (planning, design, construction, use and maintenance), how to govern the procedure in relation to the actors involved and the documentation to be produced, for an efficient implementation of BIM.
The guideline aims to facilitate the transition, for the subjects involved, to the use of innovative digital tools
BIM and construction. A tool for site management
LAUREA MAGISTRALEIl tema del BIM ha trovato sempre più interesse e consensi nel settore delle costruzioni in tutto il mondo; in alcuni paesi è diventata la pratica maggiormente utilizzata nel processo di costruzione, in altri invece sussistono ancora criticità riguardo la sua adozione. Si analizza lo stato dell’arte del BIM nel mondo attraverso leggi e decreti dei vari stati ponendo particolare attenzione alla situazione italiana che ha assistito, negli ultimi anni, ad un progresso nel processo di adozione BIM grazie alla pubblicazione di decreti e normative. L’interesse nei confronti del BIM è inoltre analizzato attraverso strumenti come Google Trend e Scopus, che testimoniano una crescita costante dell’interessamento nei confronti del BIM. Attraverso Scopus, database di articoli e pubblicazioni di carattere scientifico, abbiamo analizzato all’interno del mondo BIM quali sono i macro-temi che presentano un limitato corpo di pubblicazioni e ricerche a riguardo. Il tema dell’applicazione di tecnologie BIM in cantiere è ancora oggetto di limitati studi teorici i quali, inoltre, denunciano un numero di applicazioni pratiche ancora minore. Si analizzano quattro casi studio in cui vengono utilizzate tecnologie BIM in cantiere, cercando di capire in che modo queste possono migliorare la produttività durante la fase di cantiere e quali criticità si nascondono dietro il loro impiego. Da questa analisi abbiamo sviluppato due questionari, uno indirizzato alle aziende del settore e uno agli studenti universitari, al fine di comprendere rispettivamente come il BIM in Italia sia permeato nella pratica lavorativa e come le università italiane preparano i propri studenti alla rivoluzione tecnologica che sta interessando il settore delle costruzioni. Dai risultati dei questionari, si ottiene una visuale della situazione BIM e della sua applicazione in cantiere in Italia: criticità, sviluppo, potenzialità.The topic of BIM has found more and more interest and consensus in the construction sector worldwide; in some countries it has become the most widely used practice in the construction process, in others there are still critical issues regarding its adoption. The state of the art of BIM in the world is analysed through laws and decrees of the various states, paying particular attention to the Italian situation, which in recent years has seen progress in the BIM adoption process. The interest in BIM is also analyzed through tools such as Google Trend and Scopus, which show a steady growth of interest in BIM. Through Scopus, a database of scientific articles and publications, we have analyzed within the BIM world which are the macro-themes that present a limited body of publications and research on the subject. The theme of the application of BIM technologies in the field is still the subject of limited theoretical studies which, moreover, denounce an even smaller number of practical applications. Four case studies are analyzed where BIM technologies are used on site, trying to understand how they can improve productivity during the construction phase and which critical points are hidden behind their use. From this analysis we have developed two questionnaires, one addressed to companies in the sector and one to students, in order to understand respectively how BIM in Italy is permeated in work practice and how Italian universities prepare their students for the technological revolution that is affecting the construction sector. From the results of the questionnaires, one obtains an overview of the BIM situation and its application on site in Italy: criticalities, development, potential
Attività di ispezione del progetto BIM-based : strumenti di verifica critica del progetto di Renzo Piano per il nuovo campus Bonardi del Politecnico di Milano
LAUREA MAGISTRALENata dal desiderio di conoscere e approfondire un argomento al giorno d’oggi cosi critico, questa tesi vuole essere una ricerca approfondita sulle tematiche della progettazione integrata BIM e sull’analisi di un metodo per poter applicarne i vantaggi fin dalle prime fasi della progettazione.
Il mondo del Building Information Modeling si sta espandendo sempre di più grazie alla ricerca e allo sviluppo tecnologico ma è altrettanto evidente come questa metodologia sia applicata principalmente a partire dalla fase definitiva e quindi solamente per le fasi finali della progettazione.
Obiettivo di questo elaborato vuole essere quello di analizzare e applicare un metodo che permetta di utilizzare e sfruttare la metodologia BIM a partire dalla fase di ideazione e di studio di fattibilità tecnica ed economica, consentendo al progettista ed agli stakeholder di studiare e approfondire già a livello concettuale diverse alternative, per poi scegliere la più vantaggiosa in termini architettonici ed economici allo scopo di avere un flusso senza soluzione di continuità tra tutte le diverse fasi del progetto.
L’adozione del processo di lavoro BIM da parte di tutti gli attori partecipanti al progetto è sicuramente un passo complesso e articolato che riguarda sia un cambiamento di competenze tecniche e tecnologiche che una modifica nel modo di gestire la progettazione dalla fase di ideazione alla fase di manutenzione per finire con la fase di dismissione e smaltimento. Ciò che cambia è il modo di progettare, che si deve adattare alle nuove esigenze richieste quando la modalità di lavoro è BIM-oriented. La prima parte di questa tesi, presentata come approfondimento teorico, mira ad esibire l’attuale stato dell’arte della progetta- zione BIM nel mondo, con particolare attenzione alla situazione italiana, con l’obiettivo di porre chiarezza sul suo significato ed a evidenziarne tutti gli aspetti.
17
La seconda parte, presentata come un’analisi della metodologia con cui il BIM dovrebbe affrontare le fasi preliminari della progettazione, mostra come da una modellazione concettuale per masse, attraverso la redazione di una WBS si arriva alla realizzazione di un modello BIM che non è solo una rappresentazione tridimensionale dell’edificio ma un vero e proprio data- base di progetto, un contenitore di dati.
Nella terza ed ultima parte viene presentata un’applicazione concreta di questa nuova metodologia di progettazione attraver- so il caso studio del discusso nuovo Campus Bonardi del Politecnico di Milano.
SE IL PROGETTO DI RENZO PIANO AVESSE UTILIZZATO IL BIM FIN DALLA FASE DI IDEAZIONE, SAREBBE OGGI OGGETTO DI TANTE CRITICHE?Born from the desire to know and go deep into an argument in today's world so unfamiliar, this thesis aims to be a thorough research on the themes of integrated BIM design and on the analysis of a method in order to apply its advantages from the early design stages.
The world of Building Information Modeling is expanding more and more thanks to research and technological development, but it is equally evident how this methodology is mainly applied to the definitive stage and therefore used only for the final phases of the design.
The aim of this project is to analyze and apply a method that allows the use and exploitation of the BIM methodology also in the preliminary design and feasibility study phase, thus allowing the designer and the stakeholders to study and deepen, at
a conceptual level. , different alternatives to then choose the most advantageous in architectural and economic terms and to have a passage between the different phases of the design that takes place without interruption.
The adoption of the BIM work process by all the actors, involved in the process, is certainly a complex and complex step
that involves both a change in technical and technological skills and a change in the way of managing design from concept
to maintenance, arriving at the disposal. What changes is the way to design that must be adapted to the new needs required when the working method is BIM-oriented. It is important to remember that when we talk about BIM we are not just talking about buildings but about all parts of the building organism and all the documents that are developed parallel to the project, it means talking about costs, estimates and calculations, energy analysis and of the possible interferences that run between the different disciplines, means to talk about everything that follows the project from concept to maintenance.
The first part, presented as a theoretical study, aims to show the current state of the art of BIM, with the aim of clarifying its
19
meaning and highlighting its aspects.
The second part deals with the analysis of the methodology with which the BIM should address the preliminary phases of the design, starting from conceptual modeling by masses, through the writing of the wbs to end with the detailed modeling and the realization of a BIM model that does not only is a three-dimensional representation of the building but it’s a real project database, a container of data.
Since this thesis is not just a theoretical discussion of the Building Information Modeling, in the third and last part a concrete application of this new design methodology is presented through the case study of the much criticized new Campus of the Politecnico di Milano.
IF THE PROJECT BY RENZO PIANO HAD USED THE BIM FROM THE CONCEPT PHASE, WOULD IT BE THE OBJECT OF SO MUCH CRITICISM TODAY
Operative models and needs-analysis during the constructive phase. BIM as a tool for the optimization of the project documentation. The case of Teatro Lirico construction site
LAUREA MAGISTRALELa seguente trattazione intende illustrare un metodo in grado di ottimizzare il processo di costruzione migliorando la fase di modellazione e organizzazione delle informazioni, attraverso l’uso di software BIM (Building Information Modeling). Verranno in particolare analizzate le fasi di cantiere e, successivamente, la gestione del costruito. L’applicazione di questi software è stata supportata dal cambiamento a livello normativo, che si sta attuando in questi ultimi anni, nei confronti di una progettazione maggiormente coordinata e uniformata secondo linguaggi standard comuni.
PARTE I
La prima parte presenta la situazione normativa italiana e internazionale relativa al processo costruttivo e di come la metodologia BIM sia applicabile durante varie fasi del ciclo di vita del manufatto edilizio. Viene presentato il caso studio del Teatro Lirico di Milano, oggetto di un intervento di restauro volto al recupero delle qualità storico-artistiche del manufatto, come esempio di utilizzo integrato di questa metodo sul costruito da parte della Pubblica Amministrazione, e di come essa possa essere resa più efficiente attraverso l’utilizzo di nuovi strumenti informatici che permettono una migliore trasmissione delle informazioni tra tutti i soggetti e durante le diverse fasi del progetto.
PARTE II
Dopo aver illustrato la situazione normativa e di come il BIM stia entrando all’interno del processo costruttivo, in questa seconda parte è stato analizzato come questo metodo possa concretamente essere uno strumento di miglioramento all’interno del progetto, quali benefici porta nelle diverse fasi e sul risultato finale. Principalmente si è parlato di come il BIM possa agevolare i processi di scambio di informazioni nella fase di cantiere, in particolar modo di restauro – visto il gran numero di edifici facenti parte del patrimonio storico italiano – e nella successiva fase d’uso e gestione, considerata come una delle più onerose e lunghe durante l’intero ciclo di vita di un edificio. Sono stati presentati alcuni casi studio relativi all’applicazione del BIM in particolari campi del processo costruttivo.
PARTE III
La parte terza presenta lo sviluppo di un metodo riproducibile su qualsiasi tipo di manufatto edilizio. In questa sezione viene spiegato come l’aggiornamento di un modello 3D, sviluppato in diverse fasi del ciclo di vita e da differenti figure coinvolte nell’iter progettuale, possa essere ottimizzato attraverso l’utilizzo di strumenti che rendano le procedure di up date più veloci ed efficienti, fornendo molteplici benefici sia in termini di costi, tempo e soprattutto qualità delle informazioni.
Il metodo è stato poi applicato al caso studio del Teatro Lirico di Milano. Gli strumenti utilizzati per lo sviluppo di questo metodo sono stati principalmente Autodesk Revit per la modellazione, Dynamo per la gestione dei dati e Microsoft Excel per la loro organizzazione. Durante la trattazione saranno illustrati diversi step di approfondimento attraverso l’uso dei differenti programmi.
Il risultato prefissato consiste nella sperimentazione di un processo integrato, parallelo all’andamento del cantiere, in grado di realizzare un modello tridimensionale contenente geometrie generiche volto ad evolversi, attraverso l’uso di software applicativi di ottimizzazione dei processi, fino a diventare un modello parametrico completo con informazioni e documenti utilizzabili durante la fase d’uso e gestione di un edificio che ne descriva tutte le qualità e caratteristiche.
Inoltre vuole fornire un quadro completo e coerente alle imprese, ai progettisti, al committente, al Direttore Lavori, al RUP e a tutte le altre figure che partecipano al processo costruttivo.This paper wants to illustrate a method able to optimize the process of construction by improving modeling and organization of the information, through the use of BIM software (Building Information Modeling). In particular, the construction site phase and facility management phase are analysed through different aspects. In recent years, the change of regulatory acceptance, that is being implemented, supports the application of these software towards a more coordinated and standardised planning according to common languages.
PART I
The first part presents the situation of Italian and international legislation concerning the construction process and how the BIM methodology is applied during various phases of the life cycle of a building. We are presenting the case study of Teatro Lirico in Milan, now object of a conservation project aimed at restoring historical and artistic qualities of building, as example of how the integrated use of this method could be applied by the Public Administration and how it can be made more efficient by using new tools allowing better transmission of information among all subjects involved and during all phases of the project.
PART II
Once the situation of legislation is being presented, the second stage explains how the BIM method can be a tool of improvement within the project and which benefits can give during each phase and on the overall result. Especially it is important how the BIM facilitates the processes of information exchange into the construction site phase, and of restoration construction site - since in our country there are many buildings that are part of Italian historical heritage – and in the following phase of facility management, that it is considered one of the most expensive and longer during the life cycle of a building. Have been also tabled some case studies about BIM applications in specific phases of the constructive process.
PART III
The third part presents the development of a method that is reproducible on each building. In this section, we are going to explain many tools useful to speed up the process of updating data in a 3D model developed in each phase of the life cycle of a building and by different people, and how these tools can provide more benefits in term of cost, time and quality of information. This method is applied to the case of Teatro Lirico in Milan. The tools used to develop this approach are Autodesk Revit for modeling, Dynamo to management data and Microsoft Excel to organize information. During this paper, the different steps of this method are being shown through the use of various software.
The desired result consists in testing an integrated process, in parallel with construction site, able to create a 3D model with generic geometries and information aimed to evolve and speed up the processes until it become a complete parametric model with information and documents which describe the qualities of each construction elements and that could be used during the facility management.
The use of this integrated method wants also to provide a complete and coherent picture to companies, designers, costumers, site engineers, RUP and all other figures participating in the constructive process
BIM e construction management. Metodologia di lavoro applicata al progetto di una residenza per studenti in Milano
LAUREA MAGISTRALELa tesi si inserisce all’interno di quell’ambito di esperienze rivolte all’implementazione della metodologia BIM (Building Information Modelling) nei processi di progettazione, costruzione e gestione del manufatto edilizio.
Le peculiari logiche alla base di questo approccio metodologico - in particolare il suo fare perno sui concetti di multidisciplinarità e collaborazione - fanno sì che la sua acquisizione a livello operativo necessiti di strumenti di lavoro idonei a gestire in maniera unitaria e coerente le informazioni relative al sistema edificio all’interno ambiente di lavoro unico, capace di accogliere e mettere in relazione la totalità dei dati relativi al suo intero ciclo di vita.
Attraverso lo sviluppo di un’ipotesi progettuale, che vede nella prefabbicabilità uno strumento di gestione e razionalizzazione del processo costruttivo, la tesi propone un sistema di codifica in grado di veicolare i contenuti relativi al progetto che costituirà il punto di riferimento e di partenza per lo sviluppo di ulteriori analisi.This thesis belongs to a framework of experiences that address the implementation of the Building Information Modelling (BIM) in the traditional processes of design, construction and management of buildings.
The peculiar rationale supporting this methodological approach – primarily relying on the concepts of cooperation and integration – imply that its practical application requires suitable working aids to manage in an uniform and coherent way the information pertaining building plans in an unitary working environment, capable of receiving and connecting all the data in its entire life cycle.
Through the development of a design project, that considers prefabricated constructions a way to better manage and organize the building process, this thesis aims to introduce a regulation able to convey the information relevant to the project, and to establish a turning point for the development of further assessments and studies
La comunicazione nel processo edilizio. Building information modeling e interoperabilità nel settore delle costruzioni
LAUREA MAGISTRALEIl mondo delle costruzioni si sta sempre più relazionando al Building Information Modeling (BIM), un processo che coinvolge le diverse fasi del ciclo di vita di un edificio, possibile grazie al Building Information Model, un modello informativo multidimensionale dell’edificio che contiene tutte le informazioni ad esso associate. Questa nuova metodologia nasce dall’interazione tra gli sviluppatori di software, fondamentali per realizzare il modello informativo, gli utenti dell’industria AEC (Architecture, Engineering, Construction) e la normativa, che regola il processo edilizio. Essendo il BIM una metodologia che coinvolge l’intero ciclo di vita dell’edificio, comprende tutti gli attori che prendono parte al processo di progettazione, realizzazione e dismissione. Gli utenti coinvolti hanno la necessità di lavorare sul medesimo modello e di conseguenza quest’ultimo deve essere aperto ed interoperabile. La BuildingSMART International è un organismo internazionale che si impegna a diffondere standard aperti per la condivisione dei dati digitali, si occupa di rendere possibile lo scambio di informazioni tra i diversi software presenti sul mercato, tramite Industry Foundation Classes (IFC), un modello aperto di gerarchizzazione delle informazioni, non collegato a nessun produttore specifico, progettato per sostenere l’interoperabilità tra le diverse applicazioni. Quest’ultimo, dovendosi rapportare alle necessità del mondo delle costruzioni, è in continua evoluzione e dal 2016 i governi dell’Unione Europea ne stanno promuovendo l’utilizzo. Lo studio effettuato parte dall’analisi della struttura di un file IFC, ne individua la struttura gerarchica e le diverse entità che lo compongono, per andare successivamente a realizzare un progetto interoperabile. La BuildingSMART individua quali software BIM permettono la collaborazione basata su standard e flussi di lavoro aperti, si tratta di programmi certificati OpenBIM che consentono di importare ed esportare modelli in formato IFC. I professionisti del settore necessitano di relazionarsi a questi ultimi a causa della complessità del processo edilizio, ogni attore deve intervenire personalmente per trasferire e stabilire le informazioni rilevanti per il suo lavoro. In questo caso si è scelto di concentrarsi su uno dei problemi principali di questa metodologia, l’interoperabilità piattaforma-piattaforma, cioè lo scambio di informazioni tra due applicazioni destinate alla progettazione che supportano sia l’importazione che l’esportazione del modello. In particolare sono stati analizzati i programmi Graphisoft Archicad 22 e Autodesk Revit 2019, è stato realizzato il medesimo modello in entrambe le piattaforme, secondo il linguaggio IFC, per verificare se la comunicazione tra essi fosse possibile e per individuare quali fossero i limiti e le potenzialità di questi strumenti.The AEC (Architecture, Engineering, Construction) industry during the past years approached the Building Information Modeling’s (BIM) world: a digital process involving all steps of the architectural project. Controlling wholesomely the different phases become possible through the construction of a Building Information Model, a digital model operating on different dimensions that includes all the necessary information related to a building. It was possible to develop this technology thanks to the combined work of software developers, users and legislative authorities in charge of rules regulating all the construction processes. All the parts involved need a singular model to work on, in order to add or optimize information on the building; for this reason it is necessary to have a digital model that can be open using different software and that is interoperable. BuildingSMART International is trying to pursuit this goal; it is an international organization committed to the spreading of open sources for digital data sharing. Their work is focused on exchanging information between different software, making them readable and editable using Industry Foundation Classes (IFC). IFC is an open source not linked to any particular manufacturer used to classify information following a hierarchical model and designed to support the passage of the same model through several software. IFC is related to the world of constructions, constantly evolving. Since 2016 European Union encouraged architects and contractors to use it. Some studies made on the structure of the IFC, identified the hierarchical structure characterizing this system, that is how was possible to create an interoperable model. BuildingSMART identified which BIM software allowed collaboration with open sources in order to create the license of OpenBIM: a certification gave to these programs that allow import and export of IFC files. AEC Industry’s experts need to work with these programs in order to understand and design buildings in their complexity; each part involved in the process has to intervene and modify the information related to its work. This thesis focused on one of the problems of this approach: the interoperability between different software’s platforms and all the tools required and used to import and export the digital model. In this essay the attention is shifted on two different programs: Graphisoft’s Archicad 22 and Autodesk’s Revit 2019. The same digital model has been built in both software, following the IFC code, in order to verify a possible communication between the two programs, and to identify limits and potentials of these tools