1,381,479 research outputs found
Recommended from our members
PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT
This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke
Recommended from our members
Mrs. Fermin Calderon, Dr. Fermin Calderon accepts plaque award from Greg Coronado, Jr. at National Convention in Corpus Christi (photograph)
Mrs. Fermin Calderon, Dr. Fermin Calderon accepts plaque award from Greg Coronado, Jr. at National Convention in Corpus Christi
Recommended from our members
Mrs. Fermin Calderon, Dr. Fermin Calderon accepts plaque award from Greg Coronado, Jr. at National Convention in Corpus Christi (photograph)
Mrs. Fermin Calderon, Dr. Fermin Calderon accepts plaque award from Greg Coronado, Jr. at National Convention in Corpus Christi
Recommended from our members
CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT
This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Consolidation of the team of stakeholders; Move the site for the commercial demonstration to LTV Steel, Cleveland, Ohio; Permitting for new site; Site specific engineering; Cost update of the project as it relates to the Cleveland location; FETC update; DCAA audit; and Updated endorsement of Calderon process by Ohio EPA and U.S. EPA, Region 5
Recommended from our members
National Convention Robert Driscoll Hotel, Mrs. Fermin Calderon, Dr. Fermin Calderon, Chris Aldrete, Congressman James Wright, and Dr. Hector P. Garcia (photograph)
National Convention Robert Driscoll Hotel, Mrs. Fermin Calderon, Dr. Fermin Calderon, Chris Aldrete, Congressman James Wright, and Dr. Hector P. Garcia
Severino Calderon and wife, Melchor Pacheco Calderon, 1883
Photograph shows three-quarter length studio portrait of Severino Calderon (resident of Santa Rosalia, Chihuahua, Mexico) and second wife, Melchor Pacheco Calderon.Photographer's name on back:''"Kuhn & Co. / N.W. cor. Main Plaza / San Antonio, Texas.'' Inscription on back:'' Testimonio de carinos a Casiano de su siempre amiga / Melchor Pacheco de Calderon / Sn. Anto. Agto. 11 / 1883.
Recommended from our members
Calderon coal gasification Process Development Unit design and test program
The Process Development Unit (PDU) was designed and constructed to demonstrate the novel Calderon gasification/hot gas cleanup process. in the process, run-of-mine high sulfur coal is first pyrolyzed to recover a rich gas (medium Btu gas), after which the resulting char is subjected to airblown gasification to yield a lean gas (low Btu gas). The process incorporates a proprietary integrated system for the conversion of coal to gases and for the hot cleanup of the gases which removes both particulate and sulfur components of the gaseous products. The yields are: a syngas (CO and H[sub 2] mix) suitable for further conversion to liquid fuel (e.g. methanol/gasoline), and a lean gas suitable to fuel the combustion turbine of a combined cycle power generation plant with very low levels of NO[sub x] (15 ppmv). The fused slag (from the gasified char ash content) and the sulfur recovered during the hot gas cleanup will be sold as by-products. The small quantity of spent sorbent generated will be combined with the coal feed as a fluxing agent for the slag. The small quantity of wastewater from slag drainings and steam generation blowdown will be mixed with the coal feed for disposal. The Calderon gasification/hot gas cleanup, which is a completely closed system, operates at a pressure suitable for combined cycle power generation
Recommended from our members
A letter from Antonio Calderon to Dr. Hector P. Garcia
A letter from Antonio Calderon to Dr. Hector P. Garcia, updating him on the status of a movie about Gus Garcia, and asking for a letter of support
Recommended from our members
Calderon coal gasification Process Development Unit design and test program
The Process Development Unit (PDU) was designed and constructed to demonstrate the novel Calderon gasification/hot gas cleanup process. in the process, run-of-mine high sulfur coal is first pyrolyzed to recover a rich gas (medium Btu gas), after which the resulting char is subjected to airblown gasification to yield a lean gas (low Btu gas). The process incorporates a proprietary integrated system for the conversion of coal to gases and for the hot cleanup of the gases which removes both particulate and sulfur components of the gaseous products. The yields are: a syngas (CO and H{sub 2} mix) suitable for further conversion to liquid fuel (e.g. methanol/gasoline), and a lean gas suitable to fuel the combustion turbine of a combined cycle power generation plant with very low levels of NO{sub x} (15 ppmv). The fused slag (from the gasified char ash content) and the sulfur recovered during the hot gas cleanup will be sold as by-products. The small quantity of spent sorbent generated will be combined with the coal feed as a fluxing agent for the slag. The small quantity of wastewater from slag drainings and steam generation blowdown will be mixed with the coal feed for disposal. The Calderon gasification/hot gas cleanup, which is a completely closed system, operates at a pressure suitable for combined cycle power generation
Recommended from our members
Dr. Fermin Calderon crowns forum queen. Miss Texas (photograph)
Dr. Fermin Calderon crowns forum queen. Miss Texas
- …
